What a commercial solar survey includes

A commercial solar survey should answer one question with evidence: will a system on this site pay for itself, and what has to happen first? These are the areas it covers.

The seven areas a good survey covers

Area The question it answers Read more
Energy use How much electricity do you use, and when? Energy data analysis
Roof Is the roof suitable, and will it outlast the panels? Roof survey for solar
Structure Can the building carry the extra load safely? Structural survey for solar
Grid connection Can the network take the system, and is a G99 application needed? G99 and DNO applications
Design and yield What size, layout and generation make sense? Feasibility study
Costs and payback What will it cost and how long until it pays back? Cost guide
Finance and next steps How could you pay for it, and what happens next? Finance options

Energy use comes first

The most common mistake in commercial solar is sizing a system to fill the roof rather than to match the site's demand. Electricity you use on site is worth your full unit rate; electricity you export is usually worth far less. So the survey starts with your bills and, where available, your half-hourly data, to see your daytime baseload, weekday and weekend patterns and seasonal swings.

The roof and the structure

The surveyor records the roof covering (profiled metal, membrane, tile, slate or asbestos cement), its age, condition and remaining life, fragile rooflights, edge protection, access routes and shading from plant, parapets or neighbouring buildings. Panels are commonly warrantied for 25 years or more, so a roof that needs replacing in five years usually needs a plan before panels go on. Where loads are marginal or the building is older, a structural engineer may need to confirm the frame can carry the system.

The grid connection

Every system needs a route to connect. The survey checks your supply capacity and main switchgear, the likely cable route from roof to intake, and whether the system can be notified under G98 or needs approval under G99 from your distribution network operator. Where the network has limited capacity, export limitation may let a larger system connect.

Design, yield and the numbers

With the constraints known, the installer proposes a system size and layout, models expected annual generation for your location and roof orientation, and estimates how much you would use on site. That produces an installed cost range, estimated annual savings and an illustrative payback period. The payback calculator shows how those numbers fit together.

Add-ons worth assessing at the same time

What is not included

The free survey is a feasibility assessment, not a detailed engineering design. It identifies whether specialist work is needed, such as a structural engineer's calculations, an asbestos survey or a formal grid application, but those are separate steps that follow if you decide to proceed.

What a survey report looks like

Commercial solar survey report

Distribution warehouse, example site

Illustrative
System size
100 kWp
Generation
90 MWh a year
Installed cost
£90k excl. VAT
Annual benefit
£18,180
80%

Generation by month

JFMAMJJASOND
Simple paybackAbout 5 years
  • Roof condition and remaining life
  • G98 or G99 route and export limit
  • Whether an engineer's check is needed
  • Purchase, loan, lease or PPA compared
Illustrative mock-up using the worked example figures on this site. Not a real site or a real report.

In this section

Frequently asked questions

Is a feasibility study the same as a survey?

They overlap. A feasibility study is the assessment of whether solar works on the site, often done first from data and imagery. A site survey adds the physical inspection. Our free survey covers both, starting virtual or on site depending on the project. See commercial solar feasibility study.

Will the survey include a structural engineer's report?

Not usually. The survey identifies whether one is needed, based on the roof type, the age of the building and the proposed mounting system. If it is, the installer will explain the scope and cost before any work is commissioned.

Does the survey include the G99 application?

The survey checks your supply and whether G99 approval is likely to be needed. The application itself is normally made by the installer once you decide to proceed, because it needs the final design. Read G99 and DNO applications.

Can one survey cover several buildings or sites?

Yes. Multi-building sites are surveyed together so the best roofs are used first. For portfolios across different locations, a virtual first pass across all sites is often the fastest way to rank them.

Free, with no obligation

Book your free commercial solar site survey

Tell us about the site in under two minutes. We review every enquiry, call you to understand the building and your electricity use, and if the site looks suitable we arrange a free survey with one MCS certified installer matched to it.

  • On site or by video callWhichever suits the project and its stage.
  • Roof, structure, grid and energy useThe four things that decide whether solar works.
  • A clear proposalSystem size, cost range, savings and payback for your board.
  • One installer onlyYour details are not passed around a list of companies.

Want the detail first? Read how a survey works and what the survey includes.

Book your free site survey

Six quick questions, then your details. Free, with no obligation.

Step 1 of 7
Question 1 of 6: What kind of site is it?
Question 2 of 6: Do you own the building, or is it leased?
Question 3 of 6: Roughly what do you spend on electricity a month?
Question 4 of 6: Is this your first time looking into solar?
Question 5 of 6: When are you hoping to go ahead?
Question 6 of 6: What kind of survey would you like?
Where is the site, and who should we ask for?

Your details go to one matched installer only.

Book a free site survey