Commercial solar installers in Northern Ireland

Northern Ireland works differently from Great Britain for commercial solar. There is one network operator, its own connection standards, a separate planning system run mainly by councils, and no Smart Export Guarantee. That makes self-consumption central to the business case.

Key facts for commercial solar in Northern Ireland

Network operator NIE Networks (the whole of Northern Ireland)
Connection standards G98/NI for microgeneration; G99/NI for larger systems
Indicative yield About 800 to 900 kWh per kWp per year for a well-oriented roof
Planning regime Northern Ireland: 11 councils and the Department for Infrastructure; Strategic Planning Policy Statement
Export payments No Smart Export Guarantee; any export terms are set by individual suppliers
Nation support page Northern Ireland (see below)
City pages Belfast

NIE Networks and the connection process

NIE Networks owns and operates the electricity distribution network across all of Northern Ireland, so there is no question of which operator applies. Northern Ireland uses its own versions of the connection standards:

  • G98/NI covers microgeneration up to 16A per phase (about 3.68 kW single phase or 11.04 kW three phase). A single installation is fitted and then notified. Several installations close together by the same installer need a formal application.
  • G99/NI covers larger systems, which includes nearly all commercial arrays. The application fee depends on system size, and NIE Networks prepares a connection offer once the application is complete. A fast track route exists for some smaller G99/NI systems.

Parts of the Northern Ireland network, especially in the west, already carry a lot of renewable generation, mainly wind, and capacity for new export can be limited. Because export income is also less certain here (see below), many commercial systems in Northern Ireland are designed to keep export low. Our G99 and DNO applications guide explains the general process; the NI versions follow the same principles with NIE Networks' own forms and charges.

Northern Ireland is also part of the Single Electricity Market with the Republic of Ireland, so wholesale prices and supplier offers are set differently from Great Britain.

No Smart Export Guarantee

The Smart Export Guarantee applies in Great Britain only. In Northern Ireland there is no obligation on suppliers to pay for exported electricity under SEG; some suppliers offer their own export arrangements, with terms that vary. In practice, the financial case for commercial solar in Northern Ireland rests mainly on electricity you use on site, valued at your own unit rate. This favours:

  • sizing the array to your daytime demand rather than to your roof area;
  • adding battery storage to use midday surplus later in the day;
  • pairing solar with daytime loads such as refrigeration, process heat or EV charging.

Ask any supplier directly what export terms they offer before including export income in your figures. Our Smart Export Guarantee page explains how the GB scheme works for comparison.

Yield in Northern Ireland

In our PVGIS model (version 5.2, SARAH2 data, 14% system losses), a south-facing 1 kWp array at the optimum tilt gives about 920 kWh a year near Belfast and about 850 kWh near Enniskillen in the west. An east-west layout at 10 degrees near Belfast gives about 760 kWh. The east of Northern Ireland is generally sunnier than the west. These figures are indicative; a survey models your actual roof.

Planning in Northern Ireland

Planning in Northern Ireland has been run mainly by the 11 district councils since April 2015, with the Department for Infrastructure handling regionally significant applications and setting policy. The Strategic Planning Policy Statement sets the regional framework. Planning Policy Statement 18 on renewable energy continues to apply in each council area until that council adopts its new local development plan strategy, so the policy that applies to you depends on where your site is.

Northern Ireland has permitted development rights for non-domestic microgeneration under Part 37 of the Planning (General Permitted Development) Order (Northern Ireland) 2015. For panels on a non-domestic building, the conditions include limits on projection from a roof slope facing a road, a 2 metre height limit above a flat roof and a 2 metre setback from its edge, and restrictions in conservation areas, World Heritage Sites and for listed buildings. Stand-alone panels have a smaller area limit. Check the current Order before relying on these, and see our planning permission guide for general principles.

Business rates and support

Northern Ireland has its own rating system, run by Land and Property Services, and the GB business rates exemptions for onsite renewables do not apply there.

The Department of Finance's non-domestic valuation practice note says generating plant with an installed capacity of 50 kW or less is not rateable, under the Rates (Microgeneration) Order (Northern Ireland) 2012. Above that, where the power is mainly or exclusively used on site, such as a factory with rooftop panels for self-consumption, the plant is valued with the property. See solar panels and business rates.

Capital allowances are a UK-wide tax relief, so they apply in Northern Ireland as in Great Britain; confirm the treatment with your accountant. For any current loans or advice schemes, see grants and support in Northern Ireland.

Northern Ireland's commercial buildings

  • Agri-food. Agriculture and food processing are a large part of the economy, with dairy, beef, poultry and pig farming and the processing plants that serve them. Poultry houses, dairy units and chilled storage have steady daytime loads and large roofs. See our farms page and food and drink page.
  • Manufacturing. Mid Ulster has a strong cluster of engineering and materials handling manufacturers, and Belfast has a history of aerospace and engineering.
  • Ports and logistics. Belfast Harbour, Larne and Warrenpoint handle most freight, with distribution sites along the M1 and M2.

Cities with their own page

  • Belfast: the harbour, city centre buildings and the greater Belfast industrial estates.

Solar and local funding here: the figures (checked November 2026)

Area Solar PV sites Capacity 2025 Capacity 2024 Generation 2025
Northern Ireland 33,391 400 MW 401 MW 329 GWh

Source: DESNZ regional renewable statistics, 2025 workbooks. The sites include homes and the capacity includes solar farms, so these describe all solar in the area, not business rooftops.

Network operator: NIE Networks. Postcode areas: BT. We match each site with one of 130+ MCS certified installers across the UK, and only those who pass our checks, choosing one that covers Northern Ireland and takes on jobs of your size.

Local funding

Power NI's grant of up to 20% towards business solar PV, funded by the Northern Ireland Sustainable Energy Programme, has closed for 2026/27, with the next scheme expected in April 2027 subject to funding, and Invest NI's Energy Efficiency Capital Grant is paused for review (checked 3 November 2026). See solar grants in Northern Ireland.

How the free survey works in Northern Ireland

Send the short form and we will call to understand your site and electricity use. If it looks suitable, we arrange a free survey with one MCS certified installer matched to the site, ideally one experienced with NIE Networks and Northern Ireland planning. Because export earns less certain income here, expect the installer to focus on matching generation to your demand. Your details go to that installer only, and there is no obligation to proceed.

Cities in Northern Ireland

Frequently asked questions

Can I get the Smart Export Guarantee in Northern Ireland?

No. The Smart Export Guarantee applies in Great Britain only. Some Northern Ireland suppliers offer their own export arrangements, but terms vary and are not guaranteed by a scheme. For most commercial sites the business case should rest on electricity used on site, so ask suppliers directly about export terms before counting on that income.

What is G99/NI and how is it different from G99?

G99/NI is Northern Ireland's version of the connection standard for generation above microgeneration size, administered by NIE Networks. The principles match G99 in Great Britain: you apply before connecting, NIE Networks assesses the network, and you receive a connection offer. The forms, fees and process details are NIE Networks' own, so use an installer familiar with them.

Do I need planning permission for solar on a business roof in Northern Ireland?

Often not, as Part 37 of the Northern Ireland permitted development order covers non-domestic rooftop solar, subject to conditions on height, projection and setback, and restrictions in conservation areas, World Heritage Sites and listed buildings. Your council handles applications where permission is needed. Check the current Order and your council's local policy before work starts.

Is a battery more important in Northern Ireland than in Great Britain?

Often it is. Without the Smart Export Guarantee, surplus midday generation may earn little or nothing, so storing it for use later in the day can add more value than it would in Great Britain. Whether it pays depends on your demand profile and battery cost. Half-hourly data lets the installer model the options.

Is a poultry or dairy farm suitable for solar in Northern Ireland?

Frequently. Poultry houses need ventilation, lighting and heating, and dairy units have milking and cooling loads every day, so much of the generation is used on site. Large shed roofs offer space, though older sheeting may contain asbestos. The survey checks the roof, the supply and how your demand matches generation through the year.

Free, with no obligation

Book your free commercial solar site survey

Tell us about the site in under two minutes. We review every enquiry, call you to understand the building and your electricity use, and if the site looks suitable we arrange a free survey with one MCS certified installer matched to it. We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

  • On site or by video callWhichever suits the project and its stage.
  • Roof, structure, grid and energy useThe four things that decide whether solar works.
  • A clear proposalSystem size, cost range, savings and payback for your board.
  • One installer onlyYour details are not passed around a list of companies.

Want the detail first? Read how a survey works and what the survey includes.

Book your free site survey

Six quick questions, then your details. Free, with no obligation.

Step 1 of 7
Question 1 of 6: What kind of site is it?
Question 2 of 6: Do you own the building, or is it leased?
Question 3 of 6: Roughly what do you spend on electricity a month?
Question 4 of 6: Is this your first time looking into solar?
Question 5 of 6: When are you hoping to go ahead?
Question 6 of 6: What kind of survey would you like?
Where is the site, and who should we ask for?

Your details go to one matched installer only.

Book a free site survey