Birmingham combines old manufacturing districts, big logistics corridors and a Clean Air Zone in the city centre. This page sets out the grid, planning and building issues that shape a commercial solar project here, and how to get a free site survey.

Key facts

Network operator National Grid Electricity Distribution (West Midlands licence area)
Planning authority Birmingham City Council; Solihull, Sandwell, Walsall and North Warwickshire councils for sites just outside the city
Clean air zone Class D Clean Air Zone inside the A4540 Middleway ring road
Indicative yield About 850 to 950 kWh per kWp a year for a well-oriented array
Nation support page Grants and support in England

Grid connection with National Grid Electricity Distribution

Birmingham sits in the West Midlands licence area of National Grid Electricity Distribution (NGED), which owns the local wires and substations. Any system above the G98 limits (about 3.68 kW single phase or 11.04 kW three phase) needs G99 approval from NGED before it is switched on, and that covers almost every commercial roof. Licence boundaries do not always follow council boundaries, so confirm the operator for your postcode with the Energy Networks Association postcode tool.

For a Birmingham site the G99 question is usually how much export the local network can take. Export headroom varies from one substation to the next, so it is worth checking early. Where export is limited, a G100 export limitation scheme can let a larger array connect while capping what flows back to the grid. Our page on G99 and DNO applications explains the stages and what the installer submits.

Planning: Birmingham City Council and its neighbours

Birmingham City Council decides most applications in the city, but several of the area's largest employment sites sit just over the boundary. Birmingham Business Park, the NEC and Birmingham Airport are in Solihull, so Solihull Metropolitan Borough Council is the planning authority there. Hams Hall Distribution Park near Coleshill falls to North Warwickshire Borough Council.

In England, permitted development rights for non-domestic rooftop solar were widened in December 2023, including removal of the previous 1 MW limit. Conditions still apply, such as how far panels may project above a flat roof, and the rules are tighter for listed buildings and conservation areas. That matters here: the Jewellery Quarter is a conservation area with a large number of listed workshops and factories. Our planning permission guide sets out the conditions.

Where solar fits the local economy

Birmingham's economy mixes engineering and automotive supply chains, logistics, food production and a large professional services, health and education base. The roofs that tend to work best are:

  • Engineering and metalworking premises in Tyseley, Aston and Witton, where daytime machinery loads line up with solar output. Tyseley Energy Park, on the Webster and Horsfall site, anchors the city's Energy Innovation Zone.
  • Distribution sheds along the M6 and M42 corridors, including Hams Hall and the sites around the airport, which have large, simple roofs.
  • Hospitals, universities and offices with steady weekday demand.

The Clean Air Zone, fleets and charging

Birmingham's Clean Air Zone has operated since June 2021 and covers all roads inside the A4540 Middleway, but not the Middleway itself. As a Class D zone it charges non-compliant cars, taxis and vans as well as HGVs, buses and coaches. At the time of writing the published daily charges are £8 for cars, taxis and vans and £50 for HGVs, buses and coaches; check the council's Brum Breathes site for current rates and exemptions.

If your vans enter the zone regularly, switching to electric removes the charge, and charging them from your own roof during the working day uses solar power that would otherwise be exported at a lower rate. Our page on EV charging for business covers depot and workplace charging, which the survey can size alongside the array.

Roofs and buildings in Birmingham

  • Victorian and Edwardian workshops in the Jewellery Quarter and Digbeth, often with slate pitched roofs, decorative frontages and conservation constraints. Rear and inner roof slopes are usually the starting point.
  • 1960s to 1980s industrial units across east and north Birmingham, many with asbestos cement sheet roofs. These need an asbestos survey and a decision on overcladding or replacement first; see asbestos roofs.
  • Modern steel-framed sheds with profiled metal roofs, usually the simplest and cheapest to fit.

Expected generation

At Birmingham's latitude a well-oriented commercial array typically produces about 850 to 950 kWh per kWp a year (indicative). The European Commission's PVGIS model gives close to 970 kWh per kWp for an ideally angled, south-facing array with standard losses, and nearer 780 for a low-pitch east-west layout on a flat roof, which fits more panels but yields less per panel.

How the free survey works in Birmingham

Fill in the short form and we review your enquiry, then call to understand the building, your energy use and your goals. If the site looks suitable we arrange a free survey with one MCS certified installer matched to it, and your details go to that installer only. The survey can be in person or virtual, and for a site inside the Clean Air Zone it can cover vehicle charging as well as the roof. There is no obligation to proceed. For the wider region see our West Midlands page.

Frequently asked questions

Who is the electricity network operator for Birmingham?

National Grid Electricity Distribution covers Birmingham through its West Midlands licence area. It assesses G99 applications for commercial solar and decides how much export the local network can accept. Boundaries can vary at the edges of licence areas, so confirm the operator for your postcode with the Energy Networks Association postcode tool before an installer applies.

Does the Clean Air Zone change the case for solar?

Not directly, because the zone charges vehicles rather than buildings. It can strengthen the case if you are replacing non-compliant vans with electric ones, since charging them from your own roof during the day uses solar power that would otherwise be exported at a lower rate. The survey can model the charging load and the array together.

Our building is in the Jewellery Quarter. Can we still fit panels?

Often yes, but it needs more care. The Jewellery Quarter is a conservation area with many listed buildings, so permitted development conditions are tighter and a listed building will normally need listed building consent. Flat roofs hidden behind parapets and rear slopes not visible from the street are the usual starting point. Speak to Birmingham City Council's planning team early.

Is a unit at Birmingham Business Park covered by Birmingham planning?

No. Birmingham Business Park, like the NEC and Birmingham Airport, is in Solihull, so Solihull Metropolitan Borough Council is the planning authority. Most rooftop systems on modern units there can proceed under permitted development, but check your lease and any estate rules, because landlord consent is often needed before roof work starts.

Free, with no obligation

Book your free commercial solar site survey

Tell us about the site in under two minutes. We review every enquiry, call you to understand the building and your electricity use, and if the site looks suitable we arrange a free survey with one MCS certified installer matched to it.

  • On site or by video callWhichever suits the project and its stage.
  • Roof, structure, grid and energy useThe four things that decide whether solar works.
  • A clear proposalSystem size, cost range, savings and payback for your board.
  • One installer onlyYour details are not passed around a list of companies.

Want the detail first? Read how a survey works and what the survey includes.

Book your free site survey

Six quick questions, then your details. Free, with no obligation.

Step 1 of 7
Question 1 of 6: What kind of site is it?
Question 2 of 6: Do you own the building, or is it leased?
Question 3 of 6: Roughly what do you spend on electricity a month?
Question 4 of 6: Is this your first time looking into solar?
Question 5 of 6: When are you hoping to go ahead?