Solar in Broadland in figures
| Solar PV installations, end of 2025 | 6,607 |
| Installed capacity, end of 2025 | 60.1 MW |
| Capacity, end of 2024 | 55.7 MW |
| Capacity, end of 2020 | 42.8 MW |
| Generation in 2025 | 56 GWh |
| Installations per 1,000 households | 114.3 (UK median 67.0) |
| Average size per installation | 9.1 kW |
| Rank by capacity | 108th of 361 UK council areas; 18th of 45 in East of England |
What the figures show
Capacity in Broadland has grown by 41% since the end of 2020, slower than the UK as a whole (69%). In 2025 alone it rose from 55.7 MW to 60.1 MW.
There are 114.3 installations for every 1,000 households, above the East of England median of 73.8 and above the UK median of 67.0. That is 49th of 361 council areas, and 10th of 45 in East of England.
The average installation is 9.1 kW, about twice a typical home system, so larger commercial, farm and ground-mounted systems make up a good share of the capacity.
What a business roof in Broadland could generate
Modelled with PVGIS for the centre of Broadland, a south-facing roof at 30 degrees produces about 1,026 kWh per kWp a year. That is 94th of 361 council areas; the UK median is 998 kWh.
| Item | Illustrative figure |
|---|---|
| System | 100 kWp, south facing at 30 degrees |
| Installed cost | £900 per kWp, so £90,000 excluding VAT |
| Generation | 1,026 kWh per kWp, about 102,600 kWh a year |
| Used on site | 70%, so 71,820 kWh at 24p = £17,237 saved |
| Exported | 30%, so 30,780 kWh at 5p = £1,539 earned |
| Total a year | About £18,776 |
| Simple payback | About 4.8 years before tax relief |
Same sums as our commercial solar calculator: illustrative, not a quote. East- or west-facing roofs, shading and how much power you use in daylight all move these figures, and a company paying corporation tax can usually shorten the payback with capital allowances. See the cost guide for price ranges by system size.
Planning and grid connection
Broadland follows the national planning rules for England. Permitted development rights for non-domestic rooftop solar were widened in December 2023, including removal of the old 1 MW limit, but conditions still apply, especially for listed buildings and conservation areas. Ground-mounted arrays and carports usually need an application to the council, or to a national park authority inside a national park. Our planning permission guide sets out the conditions.
Most commercial systems need G99 approval from the local network operator before they are switched on. The operator follows the postcode rather than the council boundary: our East of England page covers the operators in the region, and the Energy Networks Association postcode tool confirms yours. See G99 and DNO applications.
For funding, see grants and reliefs in England.
Nearby council areas
- Norwich, about 4 miles away
- North Norfolk, about 11 miles away
- South Norfolk, about 14 miles away
- Great Yarmouth, about 17 miles away
- Breckland, about 19 miles away
- King's Lynn and West Norfolk, about 30 miles away
Or see every council area and the East of England page.
Where these figures come from
Installations, capacity, generation and households: Department for Energy Security and Net Zero, Regional Renewable Statistics, renewable electricity by local authority 2014 to 2025 (workbook). They cover all solar PV, homes and businesses, including ground-mounted schemes. Yield: PVGIS 5.3 (European Commission Joint Research Centre), SARAH3 data and 14% system losses, for the council area's centre point (ONS boundaries, December 2024), modelled 4 November 2026. Distances are between centre points.
Frequently asked questions
How much solar is installed in Broadland?
At the end of 2025, Broadland had 6,607 solar PV installations with a combined capacity of 60.1 MW, which generated about 56 GWh in 2025, according to government figures. That covers homes, businesses and ground-mounted schemes.
How much would solar on a business roof in Broadland generate?
About 1,026 kWh per kWp a year for a south-facing roof at 30 degrees, modelled with PVGIS for the centre of Broadland. A 100 kWp system would make roughly 102,600 kWh a year. Orientation, pitch and shading change this, and a site survey models your own roof.
Can a business in Broadland get a free solar survey?
Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. The survey is free and there is no obligation to go ahead. Get a free survey.
Related pages
- East of EnglandUK Power Networks connections, strong yields, the Felixstowe and A14 logistics corridor, arable farming and food processing across Norfolk, Suffolk and the Fens.
- Council areasSolar installations, capacity, growth and modelled yield for all 361 UK council areas, with a page for each and a CSV download.
- Commercial solar calculatorEstimate commercial solar savings and payback, with the generation, price and cost assumptions shown and sourced, and the limits of a simple estimate explained.
- EnglandCurrent solar support in England for businesses, schools, public bodies, community groups and farms, plus rates, planning and who to contact.
Commercial solar costIllustrative prices per kWp by system size, extra costs, running costs, VAT and tax.