At the end of 2025, Isle of Anglesey (Ynys Môn) had 6,812 solar PV installations with a combined capacity of 108.4 MW, according to government figures. Here are the local figures, what a business roof here could generate, and how to arrange a free site survey.

Solar in Isle of Anglesey in figures

Solar PV installations, end of 2025 6,812
Installed capacity, end of 2025 108.4 MW
Capacity, end of 2024 102.6 MW
Capacity, end of 2020 36.5 MW
Generation in 2025 99 GWh
Installations per 1,000 households 216.4 (UK median 67.0)
Average size per installation 15.9 kW
Rank by capacity 55th of 361 UK council areas; 5th of 22 in Wales

What the figures show

Capacity in Isle of Anglesey has grown by 197% since the end of 2020, faster than the UK as a whole (69%). In 2025 alone it rose from 102.6 MW to 108.4 MW.

There are 216.4 installations for every 1,000 households, above the Wales median of 83.9 and above the UK median of 67.0. That is 1st of 361 council areas, and 1st of 22 in Wales.

The average installation is 15.9 kW, about twice a typical home system, so larger commercial, farm and ground-mounted systems make up a good share of the capacity.

What a business roof in Isle of Anglesey could generate

Modelled with PVGIS for the centre of Isle of Anglesey, a south-facing roof at 30 degrees produces about 988 kWh per kWp a year. That is 199th of 361 council areas; the UK median is 998 kWh.

Item Illustrative figure
System 100 kWp, south facing at 30 degrees
Installed cost £900 per kWp, so £90,000 excluding VAT
Generation 988 kWh per kWp, about 98,800 kWh a year
Used on site 70%, so 69,160 kWh at 24p = £16,598 saved
Exported 30%, so 29,640 kWh at 5p = £1,482 earned
Total a year About £18,080
Simple payback About 5.0 years before tax relief

Same sums as our commercial solar calculator: illustrative, not a quote. East- or west-facing roofs, shading and how much power you use in daylight all move these figures, and a company paying corporation tax can usually shorten the payback with capital allowances. See the cost guide for price ranges by system size.

Planning and grid connection

Many non-domestic roofs are covered by the Welsh permitted development order (Part 43), with conditions for listed buildings, conservation areas and protected land. England's December 2023 changes do not apply in Wales. Ground-mounted arrays usually need an application to Isle of Anglesey council, or to a national park authority inside a national park. Our planning permission guide sets out the conditions.

Most commercial systems need G99 approval from the local network operator before they are switched on. The operator follows the postcode rather than the council boundary: our Wales page covers the operators in the region, and the Energy Networks Association postcode tool confirms yours. See G99 and DNO applications.

For funding, see grants and reliefs in Wales.

Nearby council areas

Or see every council area and the Wales page.

Where these figures come from

Installations, capacity, generation and households: Department for Energy Security and Net Zero, Regional Renewable Statistics, renewable electricity by local authority 2014 to 2025 (workbook). They cover all solar PV, homes and businesses, including ground-mounted schemes. Yield: PVGIS 5.3 (European Commission Joint Research Centre), SARAH3 data and 14% system losses, for the council area's centre point (ONS boundaries, December 2024), modelled 4 November 2026. Distances are between centre points.

Frequently asked questions

How much solar is installed in Isle of Anglesey?

At the end of 2025, Isle of Anglesey had 6,812 solar PV installations with a combined capacity of 108.4 MW, which generated about 99 GWh in 2025, according to government figures. That covers homes, businesses and ground-mounted schemes.

How much would solar on a business roof in Isle of Anglesey generate?

About 988 kWh per kWp a year for a south-facing roof at 30 degrees, modelled with PVGIS for the centre of Isle of Anglesey. A 100 kWp system would make roughly 98,800 kWh a year. Orientation, pitch and shading change this, and a site survey models your own roof.

Can a business in Isle of Anglesey get a free solar survey?

Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. The survey is free and there is no obligation to go ahead. Get a free survey.

Free, with no obligation

See what your business could qualify for

Find out which grants, tax relief (capital allowances) and finance options your business may qualify for, and roughly what solar could save. It comes from a free call with us and a free survey with one MCS certified installer.

Tell us about the site in under two minutes. We review every enquiry, call you to understand the building and your electricity use, and if the site looks suitable we arrange a free survey with one MCS certified installer matched to it. We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

  • On site or by video callWhichever suits the project and its stage.
  • Roof, structure, grid and energy useThe four things that decide whether solar works.
  • A clear proposalSystem size, cost range, savings and payback for your board.
  • One installer onlyYour details are not passed around a list of companies.

Want the detail first? Read how a survey works and what the survey includes.

See what your business could qualify for

Grants, tax relief and finance your business may qualify for, and roughly what solar could save. Six quick questions.

  • PPA
  • Buy outright
  • Hire purchase
  • Local schemes
Question 1 of 10: What kind of survey would you like?

Tap one to start.

Question 2 of 10: Do you own the building, or is it leased?

Tap one to carry on.

Question 3 of 10: Is this your first time looking into solar?

Tap one to carry on.

Question 4 of 10: What kind of site is it?

Tap one to carry on.

Question 5 of 10: Roughly what do you spend on electricity a month?

Tap one to carry on.

Question 6 of 10: When are you hoping to go ahead?

Tap one to carry on.

Where's the site?

So we match you with an installer who covers your area.

Who should we ask for?

The person we'll speak to about the survey.

What's the best mobile for you?

We'll ring to talk through the site. UK mobiles only.

Last one. Where should we email you?

Your survey details go here.

Free site survey, no obligation.

See what you qualify for