Skip to content
CommercialSolarSurveys.com

Commercial solar in Lisburn and Castlereagh

At the end of 2025, Lisburn and Castlereagh had 2,920 solar PV installations with a combined capacity of 74.5 MW, according to government figures. Here are the local figures, what a business roof here could generate, and how to arrange a free site survey.

Solar in Lisburn and Castlereagh in figures

Solar PV installations, end of 2025 2,920
Installed capacity, end of 2025 74.5 MW
Capacity, end of 2024 72.3 MW
Capacity, end of 2020 80.8 MW
Generation in 2025 58 GWh
Installations per 1,000 households 50.3 (UK median 67.0)
Average size per installation 25.5 kW
Rank by capacity 87th of 361 UK council areas; 2nd of 11 in Northern Ireland

What the figures show

Capacity in Lisburn and Castlereagh has grown by -8% since the end of 2020, slower than the UK as a whole (69%). In 2025 alone it rose from 72.3 MW to 74.5 MW.

There are 50.3 installations for every 1,000 households, close to the Northern Ireland median of 49.4 and below the UK median of 67.0. That is 255th of 361 council areas, and 5th of 11 in Northern Ireland.

The average installation is 25.5 kW, several times a typical home system of about 4 kW, so solar farms and large commercial or farm roofs make up much of the capacity here.

What a business roof in Lisburn and Castlereagh could generate

Modelled with PVGIS for the centre of Lisburn and Castlereagh, a south-facing roof at 30 degrees produces about 919 kWh per kWp a year. That is 293rd of 361 council areas; the UK median is 998 kWh.

Item Illustrative figure
System 100 kWp, south facing at 30 degrees
Installed cost £900 per kWp, so £90,000 excluding VAT
Generation 919 kWh per kWp, about 91,900 kWh a year
Used on site 70%, so 64,330 kWh at 24p = £15,439 saved
Exported 30%, so 27,570 kWh at 5p = £1,379 earned
Total a year About £16,818
Simple payback About 5.4 years before tax relief

Same sums as our commercial solar calculator: illustrative, not a quote. East- or west-facing roofs, shading and how much power you use in daylight all move these figures, and a company paying corporation tax can usually shorten the payback with capital allowances. See the cost guide for price ranges by system size.

Planning and grid connection

Planning in Northern Ireland is run mainly by the 11 councils, so Lisburn and Castlereagh council decides most applications, with the Department for Infrastructure handling regionally significant ones. Rooftop solar on many non-domestic buildings can go ahead without an application, within limits. Our planning permission guide sets out the conditions.

NIE Networks runs the network across Northern Ireland, and systems connect under the G98/NI and G99/NI process. There is no Smart Export Guarantee in Northern Ireland, so sizing the system to the power you use on site matters even more.

For funding, see grants and reliefs in Northern Ireland.

Nearby council areas

Or see every council area and the Northern Ireland page.

Where these figures come from

Installations, capacity, generation and households: Department for Energy Security and Net Zero, Regional Renewable Statistics, renewable electricity by local authority 2014 to 2025 (workbook). They cover all solar PV, homes and businesses, including ground-mounted schemes. Yield: PVGIS 5.3 (European Commission Joint Research Centre), SARAH3 data and 14% system losses, for the council area's centre point (ONS boundaries, December 2024), modelled 4 November 2026. Distances are between centre points.

Frequently asked questions

How much solar is installed in Lisburn and Castlereagh?

At the end of 2025, Lisburn and Castlereagh had 2,920 solar PV installations with a combined capacity of 74.5 MW, which generated about 58 GWh in 2025, according to government figures. That covers homes, businesses and ground-mounted schemes.

How much would solar on a business roof in Lisburn and Castlereagh generate?

About 919 kWh per kWp a year for a south-facing roof at 30 degrees, modelled with PVGIS for the centre of Lisburn and Castlereagh. A 100 kWp system would make roughly 91,900 kWh a year. Orientation, pitch and shading change this, and a site survey models your own roof.

Can a business in Lisburn and Castlereagh get a free solar survey?

Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. The survey is free and there is no obligation to go ahead. Get a free survey.

Free, with no obligation

See what your business could qualify for

Find out which grants, tax relief (capital allowances) and finance options your business may qualify for, and roughly what solar could save. It comes from a free call with us and a free survey with one MCS certified installer.

Tell us about the site in under two minutes. We review every enquiry, call you to understand the building and your electricity use, and if the site looks suitable we arrange a free survey with one MCS certified installer matched to it. We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

  • On site or by video callWhichever suits the project and its stage.
  • Roof, structure, grid and energy useThe four things that decide whether solar works.
  • A clear proposalSystem size, cost range, savings and payback for your board.
  • One installer onlyYour details are not passed around a list of companies.

Want the detail first? Read how a survey works and what the survey includes.

See what your business could qualify for

Grants, tax relief and finance your business may qualify for, and roughly what solar could save. Six quick questions.

  • PPA
  • Buy outright
  • Hire purchase
  • Local schemes
Question 1 of 10: What kind of survey would you like?

Tap one to start.

Question 2 of 10: Do you own the building, or is it leased?

Tap one to carry on.

Question 3 of 10: Is this your first time looking into solar?

Tap one to carry on.

Question 4 of 10: What kind of site is it?

Tap one to carry on.

Question 5 of 10: Roughly what do you spend on electricity a month?

Tap one to carry on.

Question 6 of 10: When are you hoping to go ahead?

Tap one to carry on.

Where's the site?

So we match you with an installer who covers your area.

Who should we ask for?

The person we'll speak to about the survey.

What's the best mobile for you?

We'll ring to talk through the site. UK mobiles only.

Last one. Where should we email you?

Your survey details go here.

Free site survey, no obligation.

See what you qualify for