Solar in Swale in figures
| Solar PV installations, end of 2025 | 3,997 |
| Installed capacity, end of 2025 | 448.1 MW |
| Capacity, end of 2024 | 72.7 MW |
| Capacity, end of 2020 | 64.4 MW |
| Generation in 2025 | 317 GWh |
| Installations per 1,000 households | 66.1 (UK median 67.0) |
| Average size per installation | 112.1 kW |
| Rank by capacity | 5th of 361 UK council areas; 1st of 64 in South East |
What the figures show
Capacity in Swale has grown by 596% since the end of 2020, faster than the UK as a whole (69%). Most of that came in 2025 alone, when capacity went from 72.7 MW to 448.1 MW: a jump of that size usually means a large ground-mounted scheme connected.
There are 66.1 installations for every 1,000 households, below the South East median of 74.2 and below the UK median of 67.0. That is 186th of 361 council areas, and 42nd of 64 in South East.
The average installation is 112.1 kW, several times a typical home system of about 4 kW, so solar farms and large commercial or farm roofs make up much of the capacity here.
What a business roof in Swale could generate
Modelled with PVGIS for the centre of Swale, a south-facing roof at 30 degrees produces about 1,079 kWh per kWp a year. That is 29th of 361 council areas; the UK median is 998 kWh.
| Item | Illustrative figure |
|---|---|
| System | 100 kWp, south facing at 30 degrees |
| Installed cost | £900 per kWp, so £90,000 excluding VAT |
| Generation | 1,079 kWh per kWp, about 107,900 kWh a year |
| Used on site | 70%, so 75,530 kWh at 24p = £18,127 saved |
| Exported | 30%, so 32,370 kWh at 5p = £1,619 earned |
| Total a year | About £19,746 |
| Simple payback | About 4.6 years before tax relief |
Same sums as our commercial solar calculator: illustrative, not a quote. East- or west-facing roofs, shading and how much power you use in daylight all move these figures, and a company paying corporation tax can usually shorten the payback with capital allowances. See the cost guide for price ranges by system size.
Planning and grid connection
Swale follows the national planning rules for England. Permitted development rights for non-domestic rooftop solar were widened in December 2023, including removal of the old 1 MW limit, but conditions still apply, especially for listed buildings and conservation areas. Ground-mounted arrays and carports usually need an application to the council, or to a national park authority inside a national park. Our planning permission guide sets out the conditions.
Most commercial systems need G99 approval from the local network operator before they are switched on. The operator follows the postcode rather than the council boundary: our South East page covers the operators in the region, and the Energy Networks Association postcode tool confirms yours. See G99 and DNO applications.
For funding, see grants and reliefs in England.
Nearby council areas
- Maidstone, about 11 miles away
- Medway, about 12 miles away
- Ashford, about 14 miles away
- Canterbury, about 14 miles away
- Southend-on-Sea, about 16 miles away
- Gravesham, about 17 miles away
Or see every council area and the South East page.
Where these figures come from
Installations, capacity, generation and households: Department for Energy Security and Net Zero, Regional Renewable Statistics, renewable electricity by local authority 2014 to 2025 (workbook). They cover all solar PV, homes and businesses, including ground-mounted schemes. Yield: PVGIS 5.3 (European Commission Joint Research Centre), SARAH3 data and 14% system losses, for the council area's centre point (ONS boundaries, December 2024), modelled 4 November 2026. Distances are between centre points.
Frequently asked questions
How much solar is installed in Swale?
At the end of 2025, Swale had 3,997 solar PV installations with a combined capacity of 448.1 MW, which generated about 317 GWh in 2025, according to government figures. That covers homes, businesses and ground-mounted schemes.
How much would solar on a business roof in Swale generate?
About 1,079 kWh per kWp a year for a south-facing roof at 30 degrees, modelled with PVGIS for the centre of Swale. A 100 kWp system would make roughly 107,900 kWh a year. Orientation, pitch and shading change this, and a site survey models your own roof.
Can a business in Swale get a free solar survey?
Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. The survey is free and there is no obligation to go ahead. Get a free survey.
Related pages
- South EastTwo network operators, strong south coast yields, Kent horticulture, Thames Valley offices and Solent logistics, and the clean air zones that affect fleets.
- Council areasSolar installations, capacity, growth and modelled yield for all 361 UK council areas, with a page for each and a CSV download.
- Commercial solar calculatorEstimate commercial solar savings and payback, with the generation, price and cost assumptions shown and sourced, and the limits of a simple estimate explained.
- EnglandCurrent solar support in England for businesses, schools, public bodies, community groups and farms, plus rates, planning and who to contact.
Commercial solar costIllustrative prices per kWp by system size, extra costs, running costs, VAT and tax.