Skip to content
CommercialSolarSurveys.com

Commercial solar in Vale of Glamorgan

At the end of 2025, Vale of Glamorgan (Bro Morgannwg) had 4,474 solar PV installations with a combined capacity of 93.6 MW, according to government figures. Here are the local figures, what a business roof here could generate, and how to arrange a free site survey.

Solar in Vale of Glamorgan in figures

Solar PV installations, end of 2025 4,474
Installed capacity, end of 2025 93.6 MW
Capacity, end of 2024 89.0 MW
Capacity, end of 2020 81.7 MW
Generation in 2025 89 GWh
Installations per 1,000 households 73.8 (UK median 67.0)
Average size per installation 20.9 kW
Rank by capacity 62nd of 361 UK council areas; 6th of 22 in Wales

What the figures show

Capacity in Vale of Glamorgan has grown by 15% since the end of 2020, slower than the UK as a whole (69%). In 2025 alone it rose from 89.0 MW to 93.6 MW.

There are 73.8 installations for every 1,000 households, below the Wales median of 83.9 and above the UK median of 67.0. That is 149th of 361 council areas, and 14th of 22 in Wales.

The average installation is 20.9 kW, several times a typical home system of about 4 kW, so solar farms and large commercial or farm roofs make up much of the capacity here.

What a business roof in Vale of Glamorgan could generate

Modelled with PVGIS for the centre of Vale of Glamorgan, a south-facing roof at 30 degrees produces about 1,066 kWh per kWp a year. That is 39th of 361 council areas; the UK median is 998 kWh.

Item Illustrative figure
System 100 kWp, south facing at 30 degrees
Installed cost £900 per kWp, so £90,000 excluding VAT
Generation 1,066 kWh per kWp, about 106,600 kWh a year
Used on site 70%, so 74,620 kWh at 24p = £17,909 saved
Exported 30%, so 31,980 kWh at 5p = £1,599 earned
Total a year About £19,508
Simple payback About 4.6 years before tax relief

Same sums as our commercial solar calculator: illustrative, not a quote. East- or west-facing roofs, shading and how much power you use in daylight all move these figures, and a company paying corporation tax can usually shorten the payback with capital allowances. See the cost guide for price ranges by system size.

Planning and grid connection

Many non-domestic roofs are covered by the Welsh permitted development order (Part 43), with conditions for listed buildings, conservation areas and protected land. England's December 2023 changes do not apply in Wales. Ground-mounted arrays usually need an application to Vale of Glamorgan council, or to a national park authority inside a national park. Our planning permission guide sets out the conditions.

Most commercial systems need G99 approval from the local network operator before they are switched on. The operator follows the postcode rather than the council boundary: our Wales page covers the operators in the region, and the Energy Networks Association postcode tool confirms yours. See G99 and DNO applications.

For funding, see grants and reliefs in Wales.

Nearby council areas

Or see every council area and the Wales page.

Where these figures come from

Installations, capacity, generation and households: Department for Energy Security and Net Zero, Regional Renewable Statistics, renewable electricity by local authority 2014 to 2025 (workbook). They cover all solar PV, homes and businesses, including ground-mounted schemes. Yield: PVGIS 5.3 (European Commission Joint Research Centre), SARAH3 data and 14% system losses, for the council area's centre point (ONS boundaries, December 2024), modelled 4 November 2026. Distances are between centre points.

Towns in Vale of Glamorgan

Frequently asked questions

How much solar is installed in Vale of Glamorgan?

At the end of 2025, Vale of Glamorgan had 4,474 solar PV installations with a combined capacity of 93.6 MW, which generated about 89 GWh in 2025, according to government figures. That covers homes, businesses and ground-mounted schemes.

How much would solar on a business roof in Vale of Glamorgan generate?

About 1,066 kWh per kWp a year for a south-facing roof at 30 degrees, modelled with PVGIS for the centre of Vale of Glamorgan. A 100 kWp system would make roughly 106,600 kWh a year. Orientation, pitch and shading change this, and a site survey models your own roof.

Can a business in Vale of Glamorgan get a free solar survey?

Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. The survey is free and there is no obligation to go ahead. Get a free survey.

Free, with no obligation

See what your business could qualify for

Find out which grants, tax relief (capital allowances) and finance options your business may qualify for, and roughly what solar could save. It comes from a free call with us and a free survey with one MCS certified installer.

Tell us about the site in under two minutes. We review every enquiry, call you to understand the building and your electricity use, and if the site looks suitable we arrange a free survey with one MCS certified installer matched to it. We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

  • On site or by video callWhichever suits the project and its stage.
  • Roof, structure, grid and energy useThe four things that decide whether solar works.
  • A clear proposalSystem size, cost range, savings and payback for your board.
  • One installer onlyYour details are not passed around a list of companies.

Want the detail first? Read how a survey works and what the survey includes.

See what your business could qualify for

Grants, tax relief and finance your business may qualify for, and roughly what solar could save. Six quick questions.

  • PPA
  • Buy outright
  • Hire purchase
  • Local schemes
Question 1 of 10: What kind of survey would you like?

Tap one to start.

Question 2 of 10: Do you own the building, or is it leased?

Tap one to carry on.

Question 3 of 10: Is this your first time looking into solar?

Tap one to carry on.

Question 4 of 10: What kind of site is it?

Tap one to carry on.

Question 5 of 10: Roughly what do you spend on electricity a month?

Tap one to carry on.

Question 6 of 10: When are you hoping to go ahead?

Tap one to carry on.

Where's the site?

So we match you with an installer who covers your area.

Who should we ask for?

The person we'll speak to about the survey.

What's the best mobile for you?

We'll ring to talk through the site. UK mobiles only.

Last one. Where should we email you?

Your survey details go here.

Free site survey, no obligation.

See what you qualify for