Skip to content
CommercialSolarSurveys.com

Commercial solar installers in Barry

Barry is home to Atlantic Trading Estate, Port of Barry and Clean Growth Hub and Atlantic Business Park (Hayes Lane, Sully). This page sets out the grid, planning and roof issues for a commercial solar project here, what a business roof could generate, and how to get a free site survey.

Key facts

Council area Vale of Glamorgan
Population 56,587 (Barry built-up area, Census 2021)
Network operator National Grid Electricity Distribution (South Wales)
Main employment areas Atlantic Trading Estate; Port of Barry and Clean Growth Hub; Atlantic Business Park (Hayes Lane, Sully); Barry Industrial Complex
Indicative yield About 1,058 kWh per kWp a year (south facing, 30 degrees)
Nation support page Grants and reliefs in Wales

Where businesses are in Barry

  • Atlantic Trading Estate: Industrial estate of about 9 acres on the east side of Barry, close to the Port of Barry.
  • Port of Barry and Clean Growth Hub: ABP's 531-acre port, with warehousing, open storage and over 100 acres of development land earmarked for low-carbon industry.
  • Atlantic Business Park (Hayes Lane, Sully): Business units on the edge of Atlantic Trading Estate, east of Barry town centre.
  • Barry Industrial Complex: The chemical manufacturing complex east of the town where Dow Silicones operates.

Large employers and sectors with sites here include:

  • Chemicals: Dow Silicones UK: Makes silicon-based products around the clock with about 850 employees and contractors. Dow has shut its upstream siloxanes unit at Barry, but the site keeps making other silicone products.
  • Ports and liquid bulk: ABP Port of Barry and Vopak: Handles liquid bulks for the chemical industry, with 45,000 cubic metres of Vopak storage. Also handles steel, timber and scrap metal, and has a 5 MW solar farm.

Large, simple roofs on distribution sheds and modern industrial units are usually the quickest and cheapest to fit. Older mill, factory and workshop buildings can work well too, but often need a structural survey first, and roofs from before 2000 may contain asbestos cement: see asbestos roofs.

Grid connection

Barry is served by National Grid Electricity Distribution (South Wales). Almost every commercial system needs G99 approval from the network operator before it is switched on, and the question is usually how much the local network can take back. Where export is limited, a G100 export limitation scheme can let a larger array connect. See G99 and DNO applications.

Planning in Barry

Planning in Barry is decided by Vale of Glamorgan council under the Welsh rules. Many non-domestic roofs are covered by Welsh permitted development, with conditions, but not within 3 km of an airport or aerodrome or on listed buildings.

Points that come up locally:

  • Barry has several conservation areas, including Barry Marine (seafront and Whitmore Bay, designated 1991) and Barry Garden Suburb, each with a council appraisal and management plan.

Our guides on listed buildings and conservation areas explain what these mean for a solar project.

What a business roof in Barry could generate

Modelled with PVGIS for the town centre, a south-facing roof at 30 degrees produces about 1,058 kWh per kWp a year.

Item Illustrative figure
System 100 kWp, south facing at 30 degrees
Installed cost £900 per kWp, so £90,000 excluding VAT
Generation About 105,800 kWh a year
Used on site 70% at 24p = £17,774 saved
Exported 30% at 5p = £1,587 earned
Total a year About £19,361
Simple payback About 4.6 years before tax relief

Illustrative, not a quote: the same sums as our commercial solar calculator. A company paying corporation tax can usually shorten the payback with capital allowances.

Funding and support

  • Development Bank of Wales Green Business Loan Scheme: Loans of £1,000 to £1.5m for energy efficiency and decarbonisation, including solar PV, with funding available until 2028. Check the scheme's own page for eligibility and closing dates.

National reliefs apply too: see grants and reliefs in Wales.

Solar across Vale of Glamorgan

At the end of 2025, Vale of Glamorgan had 4,474 solar PV installations with 93.6 MW of capacity, up 15% since 2020, according to government figures. The Vale of Glamorgan page has the full local figures and how they compare.

Nearby towns

Sources

Frequently asked questions

Who is the electricity network operator in Barry?

National Grid Electricity Distribution (South Wales). Most commercial solar systems need its G99 approval before they are switched on. The operator follows the postcode, so confirm yours with the Energy Networks Association postcode tool.

How much would a 100 kWp solar system generate in Barry?

About 105,800 kWh a year for a south-facing roof at 30 degrees, modelled with PVGIS for the town centre. At 70% used on site at 24p and the rest exported at 5p, that is worth about £19,361 a year. Your own roof, orientation and use will change this.

Can a business in Barry get a free solar survey?

Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. It is free, with no obligation. Get a free survey.

Free, with no obligation

See what your business could qualify for

Find out which grants, tax relief (capital allowances) and finance options your business may qualify for, and roughly what solar could save. It comes from a free call with us and a free survey with one MCS certified installer.

Tell us about the site in under two minutes. We review every enquiry, call you to understand the building and your electricity use, and if the site looks suitable we arrange a free survey with one MCS certified installer matched to it. We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

  • On site or by video callWhichever suits the project and its stage.
  • Roof, structure, grid and energy useThe four things that decide whether solar works.
  • A clear proposalSystem size, cost range, savings and payback for your board.
  • One installer onlyYour details are not passed around a list of companies.

Want the detail first? Read how a survey works and what the survey includes.

See what your business could qualify for

Grants, tax relief and finance your business may qualify for, and roughly what solar could save. Six quick questions.

  • PPA
  • Buy outright
  • Hire purchase
  • Local schemes
Question 1 of 10: What kind of survey would you like?

Tap one to start.

Question 2 of 10: Do you own the building, or is it leased?

Tap one to carry on.

Question 3 of 10: Is this your first time looking into solar?

Tap one to carry on.

Question 4 of 10: What kind of site is it?

Tap one to carry on.

Question 5 of 10: Roughly what do you spend on electricity a month?

Tap one to carry on.

Question 6 of 10: When are you hoping to go ahead?

Tap one to carry on.

Where's the site?

So we match you with an installer who covers your area.

Who should we ask for?

The person we'll speak to about the survey.

What's the best mobile for you?

We'll ring to talk through the site. UK mobiles only.

Last one. Where should we email you?

Your survey details go here.

Free site survey, no obligation.

See what you qualify for