Commercial solar installers in Andover

Andover is home to Walworth Business Park, Portway Business Park and Andover Business Park. This page sets out the grid, planning and roof issues for a commercial solar project here, what a business roof could generate, and how to get a free site survey.

Key facts

Council area Test Valley
Population 48,480 (Andover built-up area, Census 2021 (ONS))
Network operator SSEN Distribution (Southern Electric Power Distribution)
Main employment areas Walworth Business Park; Portway Business Park; Andover Business Park
Indicative yield About 1,035 kWh per kWp a year (south facing, 30 degrees)
Nation support page Grants and reliefs in England

Where businesses are in Andover

  • Walworth Business Park: Council-owned business park in Andover where, with Portway, the borough's manufacturing firms are concentrated. The council also runs the Walworth Enterprise Centre there, letting business units and offices on short-term licences.
  • Portway Business Park: Council-owned business park in Andover and one of its two main manufacturing locations. Stannah's registered offices and its new lifts and major projects divisions are at Watt Close, East Portway.
  • Andover Business Park: Business park about two miles from Andover town centre with direct access to the A303. Stannah completed a 90,000 sq ft factory there and in late 2023 submitted plans for a second 136,100 sq ft unit with solar panels; the Co-op opened a 468,000 sq ft regional distribution centre on the park in 2011.

Large employers and sectors with sites here include:

  • Defence (British Army headquarters): Andover is home to the British Army's headquarters at Marlborough Lines, which employs more than 2,000 personnel.
  • Manufacturing (Stannah): Stairlift and lift maker Stannah has been based in Andover since 1974 and describes Andover Business Park as its main UK manufacturing site.
  • Distribution (Co-op): The Co-op's regional distribution centre at Andover Business Park was reported in 2011 as handling 1.3 million cases a week for more than 400 stores across southern England.

Large, simple roofs on distribution sheds and modern industrial units are usually the quickest and cheapest to fit. Older mill, factory and workshop buildings can work well too, but often need a structural survey first, and roofs from before 2000 may contain asbestos cement: see asbestos roofs.

Grid connection

Andover is served by SSEN Distribution (Southern Electric Power Distribution). Almost every commercial system needs G99 approval from the network operator before it is switched on, and the question is usually how much the local network can take back. Where export is limited, a G100 export limitation scheme can let a larger array connect. See G99 and DNO applications.

Planning in Andover

Andover follows the national planning rules for England, decided by Test Valley council. Rooftop solar on most non-domestic buildings is permitted development, within height and edge limits, and systems above 50 kW need a prior approval application covering design and glare.

Points that come up locally:

  • The Andover Conservation Area, first designated in 1969 and extended in 1984, covers the High Street and nearby routes including London Street, Bridge Street and Marlborough Street, plus St Mary's Church and the Georgian buildings of Newbury Street and Church Close. The council reviewed its boundary and appraisal in 2021.

Our guides on listed buildings and conservation areas explain what these mean for a solar project.

What a business roof in Andover could generate

Modelled with PVGIS for the town centre, a south-facing roof at 30 degrees produces about 1,035 kWh per kWp a year.

Item Illustrative figure
System 100 kWp, south facing at 30 degrees
Installed cost £900 per kWp, so £90,000 excluding VAT
Generation About 103,500 kWh a year
Used on site 70% at 24p = £17,388 saved
Exported 30% at 5p = £1,553 earned
Total a year About £18,941
Simple payback About 4.8 years before tax relief

Illustrative, not a quote: the same sums as our commercial solar calculator. A company paying corporation tax can usually shorten the payback with capital allowances.

Funding and support

We found no council or regional grant for business solar open in Andover at the time of writing (November 2026). National reliefs still apply, such as capital allowances and, in England, the business rates exemption for onsite renewables: see grants and reliefs in England.

Solar across Test Valley

At the end of 2025, Test Valley had 4,614 solar PV installations with 252.7 MW of capacity, up 38% since 2020, according to government figures. The Test Valley page has the full local figures and how they compare.

Nearby towns

Sources

Frequently asked questions

Who is the electricity network operator in Andover?

SSEN Distribution (Southern Electric Power Distribution). Most commercial solar systems need its G99 approval before they are switched on. The operator follows the postcode, so confirm yours with the Energy Networks Association postcode tool.

How much would a 100 kWp solar system generate in Andover?

About 103,500 kWh a year for a south-facing roof at 30 degrees, modelled with PVGIS for the town centre. At 70% used on site at 24p and the rest exported at 5p, that is worth about £18,941 a year. Your own roof, orientation and use will change this.

Can a business in Andover get a free solar survey?

Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. It is free, with no obligation. Get a free survey.

Free, with no obligation

See what your business could qualify for

Find out which grants, tax relief (capital allowances) and finance options your business may qualify for, and roughly what solar could save. It comes from a free call with us and a free survey with one MCS certified installer.

Tell us about the site in under two minutes. We review every enquiry, call you to understand the building and your electricity use, and if the site looks suitable we arrange a free survey with one MCS certified installer matched to it. We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

  • On site or by video callWhichever suits the project and its stage.
  • Roof, structure, grid and energy useThe four things that decide whether solar works.
  • A clear proposalSystem size, cost range, savings and payback for your board.
  • One installer onlyYour details are not passed around a list of companies.

Want the detail first? Read how a survey works and what the survey includes.

See what your business could qualify for

Grants, tax relief and finance your business may qualify for, and roughly what solar could save. Six quick questions.

  • PPA
  • Buy outright
  • Hire purchase
  • Local schemes
Question 1 of 10: What kind of survey would you like?

Tap one to start.

Question 2 of 10: Do you own the building, or is it leased?

Tap one to carry on.

Question 3 of 10: Is this your first time looking into solar?

Tap one to carry on.

Question 4 of 10: What kind of site is it?

Tap one to carry on.

Question 5 of 10: Roughly what do you spend on electricity a month?

Tap one to carry on.

Question 6 of 10: When are you hoping to go ahead?

Tap one to carry on.

Where's the site?

So we match you with an installer who covers your area.

Who should we ask for?

The person we'll speak to about the survey.

What's the best mobile for you?

We'll ring to talk through the site. UK mobiles only.

Last one. Where should we email you?

Your survey details go here.

Free site survey, no obligation.

See what you qualify for