Skip to content
CommercialSolarSurveys.com

Commercial solar installers in Barnsley

Barnsley is home to Capitol Park, Dodworth and Oakwell View. This page sets out the grid, planning and roof issues for a commercial solar project here, what a business roof could generate, and how to get a free site survey.

Key facts

Council area Barnsley
Population 71,405 (Barnsley built-up area, usual residents, Census 2021 (ONS))
Network operator Northern Powergrid (Yorkshire licence area)
Main employment areas Capitol Park, Dodworth; Oakwell View
Indicative yield About 958 kWh per kWp a year (south facing, 30 degrees)
Nation support page Grants and reliefs in England

Where businesses are in Barnsley

  • Capitol Park, Dodworth: Business park at Dodworth, just off the M1. NHS Blood and Transplant's Barnsley centre at Unit D, Capitol Way, officially opened in July 2021, was built to distribute blood products and provide laboratory services to 39 hospitals in the north of England.
  • Oakwell View: Location of two of Barnsley Council's four business centres, Mount Osborne and Oakwell Business Centres, offering offices and work stations of 130 to 1,476 sq ft on flexible terms with free parking.

Large employers and sectors with sites here include:

  • Digital and technology (The Seam): Phase one of The Seam Digital Campus in the town centre opened in March 2026 within the South Yorkshire Investment Zone; the council calls Barnsley the UK's first government-backed Tech Town and plans a third Digital Media Centre and a National Centre for Digital Technologies in phase two.
  • Steel reinforcement manufacturing (BRC): In January 2023 BRC Manufacturing, described as the UK's largest supplier of steel reinforcement for concrete, was investing £4m in a new automatic wire mesh line at its Barugh Green site to raise capacity by 65%.

Large, simple roofs on distribution sheds and modern industrial units are usually the quickest and cheapest to fit. Older mill, factory and workshop buildings can work well too, but often need a structural survey first, and roofs from before 2000 may contain asbestos cement: see asbestos roofs.

Grid connection

Barnsley is served by Northern Powergrid (Yorkshire licence area). Almost every commercial system needs G99 approval from the network operator before it is switched on, and the question is usually how much the local network can take back. Where export is limited, a G100 export limitation scheme can let a larger array connect. See G99 and DNO applications.

Planning in Barnsley

Barnsley follows the national planning rules for England, decided by Barnsley council. Rooftop solar on most non-domestic buildings is permitted development, within height and edge limits, and systems above 50 kW need a prior approval application covering design and glare.

Points that come up locally:

  • The Regent Street, Church Street and Market Hill Conservation Area, designated in 1973 and extended in 1977, holds most of the town centre's historic buildings, with 31 listed building entries including the Grade II listed Town Hall and the Grade II* St Mary's Church. It is one of three conservation areas in the town centre, with Huddersfield Road and Victoria Road.

Our guides on listed buildings and conservation areas explain what these mean for a solar project.

What a business roof in Barnsley could generate

Modelled with PVGIS for the town centre, a south-facing roof at 30 degrees produces about 958 kWh per kWp a year.

Item Illustrative figure
System 100 kWp, south facing at 30 degrees
Installed cost £900 per kWp, so £90,000 excluding VAT
Generation About 95,800 kWh a year
Used on site 70% at 24p = £16,094 saved
Exported 30% at 5p = £1,437 earned
Total a year About £17,531
Simple payback About 5.1 years before tax relief

Illustrative, not a quote: the same sums as our commercial solar calculator. A company paying corporation tax can usually shorten the payback with capital allowances.

Funding and support

We found no council or regional grant for business solar open in Barnsley at the time of writing (November 2026). National reliefs still apply, such as capital allowances and, in England, the business rates exemption for onsite renewables: see grants and reliefs in England.

Solar across Barnsley

At the end of 2025, Barnsley had 8,445 solar PV installations with 36.1 MW of capacity, up 66% since 2020, according to government figures. The Barnsley page has the full local figures and how they compare.

Nearby towns

Sources

Frequently asked questions

Who is the electricity network operator in Barnsley?

Northern Powergrid (Yorkshire licence area). Most commercial solar systems need its G99 approval before they are switched on. The operator follows the postcode, so confirm yours with the Energy Networks Association postcode tool.

How much would a 100 kWp solar system generate in Barnsley?

About 95,800 kWh a year for a south-facing roof at 30 degrees, modelled with PVGIS for the town centre. At 70% used on site at 24p and the rest exported at 5p, that is worth about £17,531 a year. Your own roof, orientation and use will change this.

Can a business in Barnsley get a free solar survey?

Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. It is free, with no obligation. Get a free survey.

Free, with no obligation

See what your business could qualify for

Find out which grants, tax relief (capital allowances) and finance options your business may qualify for, and roughly what solar could save. It comes from a free call with us and a free survey with one MCS certified installer.

Tell us about the site in under two minutes. We review every enquiry, call you to understand the building and your electricity use, and if the site looks suitable we arrange a free survey with one MCS certified installer matched to it. We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

  • On site or by video callWhichever suits the project and its stage.
  • Roof, structure, grid and energy useThe four things that decide whether solar works.
  • A clear proposalSystem size, cost range, savings and payback for your board.
  • One installer onlyYour details are not passed around a list of companies.

Want the detail first? Read how a survey works and what the survey includes.

See what your business could qualify for

Grants, tax relief and finance your business may qualify for, and roughly what solar could save. Six quick questions.

  • PPA
  • Buy outright
  • Hire purchase
  • Local schemes
Question 1 of 10: What kind of survey would you like?

Tap one to start.

Question 2 of 10: Do you own the building, or is it leased?

Tap one to carry on.

Question 3 of 10: Is this your first time looking into solar?

Tap one to carry on.

Question 4 of 10: What kind of site is it?

Tap one to carry on.

Question 5 of 10: Roughly what do you spend on electricity a month?

Tap one to carry on.

Question 6 of 10: When are you hoping to go ahead?

Tap one to carry on.

Where's the site?

So we match you with an installer who covers your area.

Who should we ask for?

The person we'll speak to about the survey.

What's the best mobile for you?

We'll ring to talk through the site. UK mobiles only.

Last one. Where should we email you?

Your survey details go here.

Free site survey, no obligation.

See what you qualify for