Skip to content
CommercialSolarSurveys.com

Commercial solar installers in Bedford

Bedford is home to Bedford Commercial Park and Murdock Road, Singer Way and Brooklands industrial estates. This page sets out the grid, planning and roof issues for a commercial solar project here, what a business roof could generate, and how to get a free site survey.

Key facts

Council area Bedford
Population 97,235 (Bedford built-up area, usual residents, Census 2021 (ONS))
Network operator UK Power Networks (Eastern Power Networks licence area)
Main employment areas Bedford Commercial Park; Murdock Road, Singer Way and Brooklands industrial estates
Indicative yield About 1,021 kWh per kWp a year (south facing, 30 degrees)
Nation support page Grants and reliefs in England

Where businesses are in Bedford

  • Bedford Commercial Park: Goodman's industrial and warehouse park beside the A421, about seven miles from junction 13 of the M1. Its occupiers include Amazon, Expeditors and the council's i-Worx Engineering Hub, and in 2024 Comline Group agreed to move its UK headquarters into a 70,000 sq ft unit there with rooftop solar PV.
  • Murdock Road, Singer Way and Brooklands industrial estates: Three industrial estates where Bedford Borough Council lets its own units, ranging from about 650 sq ft to 7,000 sq ft.

Large employers and sectors with sites here include:

  • Leisure and tourism (Universal theme park): In January 2026 Universal's UK theme park on the former Kempston Hardwick brickworks site in Bedford was given the planning green light: part of a 476 acre resort expected to bring about 20,000 construction jobs, with opening targeted for 2031.
  • Logistics and distribution: In January 2026 Hillwood agreed to buy a 10.6 acre brownfield site on Interchange Way, Kempston, from Arqiva and Bedford Borough Council, with outline consent and plans to build a speculative 100,000 sq ft distribution or manufacturing unit in 2026.

Large, simple roofs on distribution sheds and modern industrial units are usually the quickest and cheapest to fit. Older mill, factory and workshop buildings can work well too, but often need a structural survey first, and roofs from before 2000 may contain asbestos cement: see asbestos roofs.

Grid connection

Bedford is served by UK Power Networks (Eastern Power Networks licence area). Almost every commercial system needs G99 approval from the network operator before it is switched on, and the question is usually how much the local network can take back. Where export is limited, a G100 export limitation scheme can let a larger array connect. See G99 and DNO applications.

Planning in Bedford

Bedford follows the national planning rules for England, decided by Bedford council. Rooftop solar on most non-domestic buildings is permitted development, within height and edge limits, and systems above 50 kW need a prior approval application covering design and glare.

Points that come up locally:

  • Bedford Borough has 29 conservation areas. The Bedford Conservation Area covering the town centre is large and is split into 14 character sub-areas, from St Paul's Square and the town centre streets to Goldington Road and Russell Park, so roofs in and around the centre need more care.

Our guides on listed buildings and conservation areas explain what these mean for a solar project.

What a business roof in Bedford could generate

Modelled with PVGIS for the town centre, a south-facing roof at 30 degrees produces about 1,021 kWh per kWp a year.

Item Illustrative figure
System 100 kWp, south facing at 30 degrees
Installed cost £900 per kWp, so £90,000 excluding VAT
Generation About 102,100 kWh a year
Used on site 70% at 24p = £17,153 saved
Exported 30% at 5p = £1,532 earned
Total a year About £18,684
Simple payback About 4.8 years before tax relief

Illustrative, not a quote: the same sums as our commercial solar calculator. A company paying corporation tax can usually shorten the payback with capital allowances.

Funding and support

We found no council or regional grant for business solar open in Bedford at the time of writing (November 2026). National reliefs still apply, such as capital allowances and, in England, the business rates exemption for onsite renewables: see grants and reliefs in England.

Solar across Bedford

At the end of 2025, Bedford had 4,915 solar PV installations with 89.3 MW of capacity, up 26% since 2020, according to government figures. The Bedford page has the full local figures and how they compare.

Nearby towns

Sources

Frequently asked questions

Who is the electricity network operator in Bedford?

UK Power Networks (Eastern Power Networks licence area). Most commercial solar systems need its G99 approval before they are switched on. The operator follows the postcode, so confirm yours with the Energy Networks Association postcode tool.

How much would a 100 kWp solar system generate in Bedford?

About 102,100 kWh a year for a south-facing roof at 30 degrees, modelled with PVGIS for the town centre. At 70% used on site at 24p and the rest exported at 5p, that is worth about £18,684 a year. Your own roof, orientation and use will change this.

Can a business in Bedford get a free solar survey?

Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. It is free, with no obligation. Get a free survey.

Free, with no obligation

See what your business could qualify for

Find out which grants, tax relief (capital allowances) and finance options your business may qualify for, and roughly what solar could save. It comes from a free call with us and a free survey with one MCS certified installer.

Tell us about the site in under two minutes. We review every enquiry, call you to understand the building and your electricity use, and if the site looks suitable we arrange a free survey with one MCS certified installer matched to it. We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

  • On site or by video callWhichever suits the project and its stage.
  • Roof, structure, grid and energy useThe four things that decide whether solar works.
  • A clear proposalSystem size, cost range, savings and payback for your board.
  • One installer onlyYour details are not passed around a list of companies.

Want the detail first? Read how a survey works and what the survey includes.

See what your business could qualify for

Grants, tax relief and finance your business may qualify for, and roughly what solar could save. Six quick questions.

  • PPA
  • Buy outright
  • Hire purchase
  • Local schemes
Question 1 of 10: What kind of survey would you like?

Tap one to start.

Question 2 of 10: Do you own the building, or is it leased?

Tap one to carry on.

Question 3 of 10: Is this your first time looking into solar?

Tap one to carry on.

Question 4 of 10: What kind of site is it?

Tap one to carry on.

Question 5 of 10: Roughly what do you spend on electricity a month?

Tap one to carry on.

Question 6 of 10: When are you hoping to go ahead?

Tap one to carry on.

Where's the site?

So we match you with an installer who covers your area.

Who should we ask for?

The person we'll speak to about the survey.

What's the best mobile for you?

We'll ring to talk through the site. UK mobiles only.

Last one. Where should we email you?

Your survey details go here.

Free site survey, no obligation.

See what you qualify for