Commercial solar installers in Bolton

Bolton is home to Firwood Industrial Estate and Boundary Industrial Estate. This page sets out the grid, planning and roof issues for a commercial solar project here, what a business roof could generate, and how to get a free site survey.

Key facts

Council area Bolton
Population 184,090 (Bolton built-up area, usual residents, Census 2021 (ONS))
Network operator Electricity North West (North West licence area)
Main employment areas Firwood Industrial Estate; Boundary Industrial Estate
Indicative yield About 889 kWh per kWp a year (south facing, 30 degrees)
Nation support page Grants and reliefs in England

Where businesses are in Bolton

  • Firwood Industrial Estate: An industrial estate off Thicketford Road. In 2024 Millfield Estates sold a three acre plot on the former Hutchinson Works site there to wet wipes maker Saraco Industries for a 30,000 sq ft, two storey building.
  • Boundary Industrial Estate: A 38,250 sq ft estate on Millfield Road, fronting the A58 Bury Road about three miles east of the town centre, with units of 950 to 11,917 sq ft. Occupiers include Eurocell, Bain Plumbing and Spectrum Products.

Large employers and sectors with sites here include:

  • Bakery (Warburtons): Warburtons began in Bolton, where Ellen Warburton started baking bread in 1876, and its headquarters are still in the town; the family firm employs nearly 5,000 people across the UK.
  • Wet wipes manufacturing (Saraco Industries): In February 2024 Saraco Industries bought a three acre site at Firwood Industrial Estate for £1 million for a 30,000 sq ft building with eight metre eaves and four loading doors.

Large, simple roofs on distribution sheds and modern industrial units are usually the quickest and cheapest to fit. Older mill, factory and workshop buildings can work well too, but often need a structural survey first, and roofs from before 2000 may contain asbestos cement: see asbestos roofs.

Grid connection

Bolton is served by Electricity North West (North West licence area). Almost every commercial system needs G99 approval from the network operator before it is switched on, and the question is usually how much the local network can take back. Where export is limited, a G100 export limitation scheme can let a larger array connect. See G99 and DNO applications.

Planning in Bolton

Bolton follows the national planning rules for England, decided by Bolton council. Rooftop solar on most non-domestic buildings is permitted development, within height and edge limits, and systems above 50 kW need a prior approval application covering design and glare.

Points that come up locally:

  • The Deansgate Conservation Area, designated in 1987, covers about 8.8 hectares of the town centre and holds 10 listed buildings including the Market Hall and Victoria Hall, so roofs there need more care.

Our guides on listed buildings and conservation areas explain what these mean for a solar project.

What a business roof in Bolton could generate

Modelled with PVGIS for the town centre, a south-facing roof at 30 degrees produces about 889 kWh per kWp a year.

Item Illustrative figure
System 100 kWp, south facing at 30 degrees
Installed cost £900 per kWp, so £90,000 excluding VAT
Generation About 88,900 kWh a year
Used on site 70% at 24p = £14,935 saved
Exported 30% at 5p = £1,334 earned
Total a year About £16,269
Simple payback About 5.5 years before tax relief

Illustrative, not a quote: the same sums as our commercial solar calculator. A company paying corporation tax can usually shorten the payback with capital allowances.

Funding and support

We found no council or regional grant for business solar open in Bolton at the time of writing (November 2026). National reliefs still apply, such as capital allowances and, in England, the business rates exemption for onsite renewables: see grants and reliefs in England.

Solar across Bolton

At the end of 2025, Bolton had 3,974 solar PV installations with 30.0 MW of capacity, up 46% since 2020, according to government figures. The Bolton page has the full local figures and how they compare.

Nearby towns

  • Bury, about 6 miles away
  • Leigh, about 7 miles away
  • Wigan, about 9 miles away
  • Chorley, about 10 miles away

Sources

Frequently asked questions

Who is the electricity network operator in Bolton?

Electricity North West (North West licence area). Most commercial solar systems need its G99 approval before they are switched on. The operator follows the postcode, so confirm yours with the Energy Networks Association postcode tool.

How much would a 100 kWp solar system generate in Bolton?

About 88,900 kWh a year for a south-facing roof at 30 degrees, modelled with PVGIS for the town centre. At 70% used on site at 24p and the rest exported at 5p, that is worth about £16,269 a year. Your own roof, orientation and use will change this.

Can a business in Bolton get a free solar survey?

Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. It is free, with no obligation. Get a free survey.

Free, with no obligation

See what your business could qualify for

Find out which grants, tax relief (capital allowances) and finance options your business may qualify for, and roughly what solar could save. It comes from a free call with us and a free survey with one MCS certified installer.

Tell us about the site in under two minutes. We review every enquiry, call you to understand the building and your electricity use, and if the site looks suitable we arrange a free survey with one MCS certified installer matched to it. We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

  • On site or by video callWhichever suits the project and its stage.
  • Roof, structure, grid and energy useThe four things that decide whether solar works.
  • A clear proposalSystem size, cost range, savings and payback for your board.
  • One installer onlyYour details are not passed around a list of companies.

Want the detail first? Read how a survey works and what the survey includes.

See what your business could qualify for

Grants, tax relief and finance your business may qualify for, and roughly what solar could save. Six quick questions.

  • PPA
  • Buy outright
  • Hire purchase
  • Local schemes
Question 1 of 10: What kind of survey would you like?

Tap one to start.

Question 2 of 10: Do you own the building, or is it leased?

Tap one to carry on.

Question 3 of 10: Is this your first time looking into solar?

Tap one to carry on.

Question 4 of 10: What kind of site is it?

Tap one to carry on.

Question 5 of 10: Roughly what do you spend on electricity a month?

Tap one to carry on.

Question 6 of 10: When are you hoping to go ahead?

Tap one to carry on.

Where's the site?

So we match you with an installer who covers your area.

Who should we ask for?

The person we'll speak to about the survey.

What's the best mobile for you?

We'll ring to talk through the site. UK mobiles only.

Last one. Where should we email you?

Your survey details go here.

Free site survey, no obligation.

See what you qualify for