Caernarfon is home to Cibyn Industrial Estate and Cei Llechi (Slate Quay). This page sets out the grid, planning and roof issues for a commercial solar project here, what a business roof could generate, and how to get a free site survey.

Key facts

Council area Gwynedd
Population 9,835 (Caernarfon built-up area, usual residents, Census 2021 (ONS))
Network operator SP Energy Networks (SP Manweb, Merseyside and North Wales licence area)
Main employment areas Cibyn Industrial Estate; Cei Llechi (Slate Quay)
Indicative yield About 874 kWh per kWp a year (south facing, 30 degrees)
Nation support page Grants and reliefs in Wales

Where businesses are in Caernarfon

  • Cibyn Industrial Estate: Caernarfon's industrial estate, where a refurbished semi-detached unit of 10,866 sq ft in Zone 5 was listed on the Business Wales property database in July 2024.
  • Cei Llechi (Slate Quay): A £5.9m regeneration by Caernarfon Harbour Trust with Galeri Caernarfon that turned the Harbour Office and derelict buildings behind it into 19 workspaces for local artisan and craft makers.

Large employers and sectors with sites here include:

  • Heritage tourism (Caernarfon Castle): Caernarfon Castle, part of the Castles and Town Walls of Edward I World Heritage Site, recorded 155,109 visits in 2024 to 25, according to a Welsh Government freedom of information release in July 2025.
  • Public administration (Cyngor Gwynedd): Gwynedd Council's headquarters is the Council Offices on Shirehall Street in Caernarfon, a Grade II listed building completed in 1869.

Large, simple roofs on distribution sheds and modern industrial units are usually the quickest and cheapest to fit. Older mill, factory and workshop buildings can work well too, but often need a structural survey first, and roofs from before 2000 may contain asbestos cement: see asbestos roofs.

Grid connection

Caernarfon is served by SP Energy Networks (SP Manweb, Merseyside and North Wales licence area). Almost every commercial system needs G99 approval from the network operator before it is switched on, and the question is usually how much the local network can take back. Where export is limited, a G100 export limitation scheme can let a larger array connect. See G99 and DNO applications.

Planning in Caernarfon

Planning in Caernarfon is decided by Gwynedd council under the Welsh rules. Many non-domestic roofs are covered by Welsh permitted development, with conditions, but not within 3 km of an airport or aerodrome or on listed buildings.

Points that come up locally:

  • Caernarfon's castle and town walls are part of a World Heritage Site, and Gwynedd Council has refused roof solar panels on a town centre building (Llety Arall on Stryd y Plas) as clutter that would harm views from the castle, a decision the owners appealed, so expect close scrutiny of panels visible from the castle.

Our planning permission guide sets out the rules.

What a business roof in Caernarfon could generate

Modelled with PVGIS for the town centre, a south-facing roof at 30 degrees produces about 874 kWh per kWp a year.

Item Illustrative figure
System 100 kWp, south facing at 30 degrees
Installed cost £900 per kWp, so £90,000 excluding VAT
Generation About 87,400 kWh a year
Used on site 70% at 24p = £14,683 saved
Exported 30% at 5p = £1,311 earned
Total a year About £15,994
Simple payback About 5.6 years before tax relief

Illustrative, not a quote: the same sums as our commercial solar calculator. A company paying corporation tax can usually shorten the payback with capital allowances.

Funding and support

  • Development Bank of Wales Green Business Loan Scheme: Discounted fixed interest rate loans for energy efficiency measures and low carbon projects, with renewables including solar PV listed as eligible projects. Limited companies, sole traders and partnerships must be based in Wales, have traded for at least two years and have at least one set of filed annual accounts. A grant of up to 50% of the cost of a detailed energy audit, to a maximum of £10,000 (£20,000 total costs), is also offered. Check the scheme's own page for eligibility and closing dates.

National reliefs apply too: see grants and reliefs in Wales.

Solar across Gwynedd

At the end of 2025, Gwynedd had 6,788 solar PV installations with 66.5 MW of capacity, up 72% since 2020, according to government figures. The Gwynedd page has the full local figures and how they compare.

Nearby towns

Sources

Frequently asked questions

Who is the electricity network operator in Caernarfon?

SP Energy Networks (SP Manweb, Merseyside and North Wales licence area). Most commercial solar systems need its G99 approval before they are switched on. The operator follows the postcode, so confirm yours with the Energy Networks Association postcode tool.

How much would a 100 kWp solar system generate in Caernarfon?

About 87,400 kWh a year for a south-facing roof at 30 degrees, modelled with PVGIS for the town centre. At 70% used on site at 24p and the rest exported at 5p, that is worth about £15,994 a year. Your own roof, orientation and use will change this.

Can a business in Caernarfon get a free solar survey?

Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. It is free, with no obligation. Get a free survey.

Free, with no obligation

See what your business could qualify for

Find out which grants, tax relief (capital allowances) and finance options your business may qualify for, and roughly what solar could save. It comes from a free call with us and a free survey with one MCS certified installer.

Tell us about the site in under two minutes. We review every enquiry, call you to understand the building and your electricity use, and if the site looks suitable we arrange a free survey with one MCS certified installer matched to it. We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

  • On site or by video callWhichever suits the project and its stage.
  • Roof, structure, grid and energy useThe four things that decide whether solar works.
  • A clear proposalSystem size, cost range, savings and payback for your board.
  • One installer onlyYour details are not passed around a list of companies.

Want the detail first? Read how a survey works and what the survey includes.

See what your business could qualify for

Grants, tax relief and finance your business may qualify for, and roughly what solar could save. Six quick questions.

  • PPA
  • Buy outright
  • Hire purchase
  • Local schemes
Question 1 of 10: What kind of survey would you like?

Tap one to start.

Question 2 of 10: Do you own the building, or is it leased?

Tap one to carry on.

Question 3 of 10: Is this your first time looking into solar?

Tap one to carry on.

Question 4 of 10: What kind of site is it?

Tap one to carry on.

Question 5 of 10: Roughly what do you spend on electricity a month?

Tap one to carry on.

Question 6 of 10: When are you hoping to go ahead?

Tap one to carry on.

Where's the site?

So we match you with an installer who covers your area.

Who should we ask for?

The person we'll speak to about the survey.

What's the best mobile for you?

We'll ring to talk through the site. UK mobiles only.

Last one. Where should we email you?

Your survey details go here.

Free site survey, no obligation.

See what you qualify for