Skip to content
CommercialSolarSurveys.com

Commercial solar installers in Porthmadog

Porthmadog is home to Penamser Industrial Estate. This page sets out the grid, planning and roof issues for a commercial solar project here, what a business roof could generate, and how to get a free site survey.

Key facts

Council area Gwynedd
Population 2,574 (Porthmadog built-up area, usual residents, Census 2021 (ONS figure as published by City Population))
Network operator SP Energy Networks (SP Manweb, Merseyside and North Wales licence area)
Main employment areas Penamser Industrial Estate
Indicative yield About 863 kWh per kWp a year (south facing, 30 degrees)
Nation support page Grants and reliefs in Wales

Where businesses are in Porthmadog

  • Penamser Industrial Estate: Trading and industrial estate in Porthmadog; in November 2022 Lock Stock announced a one acre storage park there, beside the town's Aldi store, with capacity for over 160 shipping containers.

Large employers and sectors with sites here include:

  • Heritage railways and tourism (Ffestiniog and Welsh Highland Railways): The railways' Boston Lodge Works near Porthmadog, listed by Guinness World Records as the world's oldest railway workshop, won the top National Railway Heritage Award in December 2025 after a £5 million restoration, with public tours planned from 2026.
  • Brewing (Purple Moose): Purple Moose Brewery brews in a former foundry in Porthmadog, part of the Union Ironworks opened in 1862, supplies about 240 pubs with cask ale and runs the town's Australia and Station Inn pubs.

Large, simple roofs on distribution sheds and modern industrial units are usually the quickest and cheapest to fit. Older mill, factory and workshop buildings can work well too, but often need a structural survey first, and roofs from before 2000 may contain asbestos cement: see asbestos roofs.

Grid connection

Porthmadog is served by SP Energy Networks (SP Manweb, Merseyside and North Wales licence area). Almost every commercial system needs G99 approval from the network operator before it is switched on, and the question is usually how much the local network can take back. Where export is limited, a G100 export limitation scheme can let a larger array connect. See G99 and DNO applications.

Planning in Porthmadog

Planning in Porthmadog is decided by Gwynedd council under the Welsh rules. Many non-domestic roofs are covered by Welsh permitted development, with conditions, but not within 3 km of an airport or aerodrome or on listed buildings.

Points that come up locally:

  • The Porthmadog Conservation Area, designated on 7 March 1974, covers about 26.8 hectares and 40 postcodes, so check whether a building is inside it before planning roof panels in the centre.
  • In Wales, roof panels on a non-domestic building should project no more than 200mm from the roof, stay at least 1 metre from the roof edge and, on a flat roof, rise no more than 1 metre, but a listed building needs planning permission and listed building consent, and in a conservation area panels on a principal or side elevation wall visible from the highway need planning consent.

Our guides on listed buildings and conservation areas explain what these mean for a solar project.

What a business roof in Porthmadog could generate

Modelled with PVGIS for the town centre, a south-facing roof at 30 degrees produces about 863 kWh per kWp a year.

Item Illustrative figure
System 100 kWp, south facing at 30 degrees
Installed cost £900 per kWp, so £90,000 excluding VAT
Generation About 86,300 kWh a year
Used on site 70% at 24p = £14,498 saved
Exported 30% at 5p = £1,295 earned
Total a year About £15,793
Simple payback About 5.7 years before tax relief

Illustrative, not a quote: the same sums as our commercial solar calculator. A company paying corporation tax can usually shorten the payback with capital allowances.

Funding and support

  • Development Bank of Wales Green Business Loan Scheme: Discounted fixed interest rate green business loans for energy efficiency measures and low carbon projects, with renewables including solar PV listed as typical eligible projects; capital repayment holidays are available and the loan term is linked to the project's payback. Limited companies, sole traders and partnerships must be based in Wales, have traded for at least two years and have at least one set of filed annual accounts. A grant of up to 50% of the cost of a detailed energy audit by an accredited independent expert, to a maximum of £10,000 (£20,000 total costs), is also offered. Check the scheme's own page for eligibility and closing dates.

National reliefs apply too: see grants and reliefs in Wales.

Solar across Gwynedd

At the end of 2025, Gwynedd had 6,788 solar PV installations with 66.5 MW of capacity, up 72% since 2020, according to government figures. The Gwynedd page has the full local figures and how they compare.

Nearby towns

Sources

Frequently asked questions

Who is the electricity network operator in Porthmadog?

SP Energy Networks (SP Manweb, Merseyside and North Wales licence area). Most commercial solar systems need its G99 approval before they are switched on. The operator follows the postcode, so confirm yours with the Energy Networks Association postcode tool.

How much would a 100 kWp solar system generate in Porthmadog?

About 86,300 kWh a year for a south-facing roof at 30 degrees, modelled with PVGIS for the town centre. At 70% used on site at 24p and the rest exported at 5p, that is worth about £15,793 a year. Your own roof, orientation and use will change this.

Can a business in Porthmadog get a free solar survey?

Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. It is free, with no obligation. Get a free survey.

Free, with no obligation

See what your business could qualify for

Find out which grants, tax relief (capital allowances) and finance options your business may qualify for, and roughly what solar could save. It comes from a free call with us and a free survey with one MCS certified installer.

Tell us about the site in under two minutes. We review every enquiry, call you to understand the building and your electricity use, and if the site looks suitable we arrange a free survey with one MCS certified installer matched to it. We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

  • On site or by video callWhichever suits the project and its stage.
  • Roof, structure, grid and energy useThe four things that decide whether solar works.
  • A clear proposalSystem size, cost range, savings and payback for your board.
  • One installer onlyYour details are not passed around a list of companies.

Want the detail first? Read how a survey works and what the survey includes.

See what your business could qualify for

Grants, tax relief and finance your business may qualify for, and roughly what solar could save. Six quick questions.

  • PPA
  • Buy outright
  • Hire purchase
  • Local schemes
Question 1 of 10: What kind of survey would you like?

Tap one to start.

Question 2 of 10: Do you own the building, or is it leased?

Tap one to carry on.

Question 3 of 10: Is this your first time looking into solar?

Tap one to carry on.

Question 4 of 10: What kind of site is it?

Tap one to carry on.

Question 5 of 10: Roughly what do you spend on electricity a month?

Tap one to carry on.

Question 6 of 10: When are you hoping to go ahead?

Tap one to carry on.

Where's the site?

So we match you with an installer who covers your area.

Who should we ask for?

The person we'll speak to about the survey.

What's the best mobile for you?

We'll ring to talk through the site. UK mobiles only.

Last one. Where should we email you?

Your survey details go here.

Free site survey, no obligation.

See what you qualify for