Key facts
| Council area | South Oxfordshire |
| Population | 34,600 (Didcot built-up area, Census 2021 (ONS)) |
| Network operator | SSEN Distribution (Southern Electric Power Distribution) |
| Main employment areas | Milton Park; Harwell Campus |
| Indicative yield | About 1,026 kWh per kWp a year (south facing, 30 degrees) |
| Nation support page | Grants and reliefs in England |
Where businesses are in Didcot
- Milton Park: A 300 acre science and business park with nearly three million sq ft of floor space and over 280 organisations, focused on life sciences, energy, space and supporting technologies. Didcot Parkway station is five minutes away and a discounted bus pass covers travel from Didcot.
- Harwell Campus: Science and innovation campus with a Didcot (OX11) address, hosting over 7,000 scientists, engineers, entrepreneurs and technicians, with clusters in space, health tech, energy, quantum computing and defence.
Large employers and sectors with sites here include:
- Science and fusion energy (Milton Park): Tokamak Energy moved to the enterprise zone at Milton Park in 2013 with four staff and had grown to nearly 200 staff when the council marked ten years of Oxfordshire's enterprise zones.
- Power generation (Didcot B): RWE's Didcot B is an operational combined cycle gas turbine power station of up to 1,440 MW that opened in 1997; the coal-fired Didcot A closed in March 2013 and has since been demolished.
Large, simple roofs on distribution sheds and modern industrial units are usually the quickest and cheapest to fit. Older mill, factory and workshop buildings can work well too, but often need a structural survey first, and roofs from before 2000 may contain asbestos cement: see asbestos roofs.
Grid connection
Didcot is served by SSEN Distribution (Southern Electric Power Distribution). Almost every commercial system needs G99 approval from the network operator before it is switched on, and the question is usually how much the local network can take back. Where export is limited, a G100 export limitation scheme can let a larger array connect. See G99 and DNO applications.
Planning in Didcot
Didcot follows the national planning rules for England, decided by South Oxfordshire council. Rooftop solar on most non-domestic buildings is permitted development, within height and edge limits, and systems above 50 kW need a prior approval application covering design and glare.
Points that come up locally:
- Harwell Campus lies within the North Wessex Downs National Landscape, and the Joint Local Plan 2041 policy for the campus requires that development does not unacceptably harm the landscape and scenic beauty of the National Landscape.
Our guides on national parks and National Landscapes explain what these mean for a solar project.
What a business roof in Didcot could generate
Modelled with PVGIS for the town centre, a south-facing roof at 30 degrees produces about 1,026 kWh per kWp a year.
| Item | Illustrative figure |
|---|---|
| System | 100 kWp, south facing at 30 degrees |
| Installed cost | £900 per kWp, so £90,000 excluding VAT |
| Generation | About 102,600 kWh a year |
| Used on site | 70% at 24p = £17,237 saved |
| Exported | 30% at 5p = £1,539 earned |
| Total a year | About £18,776 |
| Simple payback | About 4.8 years before tax relief |
Illustrative, not a quote: the same sums as our commercial solar calculator. A company paying corporation tax can usually shorten the payback with capital allowances.
Funding and support
We found no council or regional grant for business solar open in Didcot at the time of writing (November 2026). National reliefs still apply, such as capital allowances and, in England, the business rates exemption for onsite renewables: see grants and reliefs in England.
Solar across South Oxfordshire
At the end of 2025, South Oxfordshire had 5,494 solar PV installations with 160.8 MW of capacity, up 244% since 2020, according to government figures. The South Oxfordshire page has the full local figures and how they compare.
Nearby towns
- Newbury, about 14 miles away
- Witney, about 16 miles away
- Bicester, about 20 miles away
- High Wycombe, about 21 miles away
Sources
- en.wikipedia.org: List of ONS built up areas in England
- miltonpark.co.uk: about
- harwellcampus.com: about
- whitehorsedc.gov.uk
- en.wikipedia.org: Didcot power stations
- southandvale.gov.uk: LPA73 AS12 Statement of Common Ground for Harwell
- miltonpark.co.uk: sustainability
- Yield: PVGIS 5.3 (European Commission Joint Research Centre), SARAH3 data, 14% system losses, for the town centre, modelled 4 November 2026.
- Council area figures: DESNZ, renewable electricity by local authority 2014 to 2025.
Frequently asked questions
Who is the electricity network operator in Didcot?
SSEN Distribution (Southern Electric Power Distribution). Most commercial solar systems need its G99 approval before they are switched on. The operator follows the postcode, so confirm yours with the Energy Networks Association postcode tool.
How much would a 100 kWp solar system generate in Didcot?
About 102,600 kWh a year for a south-facing roof at 30 degrees, modelled with PVGIS for the town centre. At 70% used on site at 24p and the rest exported at 5p, that is worth about £18,776 a year. Your own roof, orientation and use will change this.
Can a business in Didcot get a free solar survey?
Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. It is free, with no obligation. Get a free survey.
Related pages
- South Oxfordshire5,494 installations, 160.8 MW of solar and about 1,003 kWh per kWp a year for a south-facing roof.
- South EastTwo network operators, strong south coast yields, Kent horticulture, Thames Valley offices and Solent logistics, and the clean air zones that affect fleets.
- Commercial solar calculatorEstimate commercial solar savings and payback, with the generation, price and cost assumptions shown and sourced, and the limits of a simple estimate explained.
- EnglandCurrent solar support in England for businesses, schools, public bodies, community groups and farms, plus rates, planning and who to contact.
- Planning permissionPermitted development for commercial rooftop solar and car park canopies in England, prior approval, heritage limits, ground-mounted schemes and the other UK nations.