Commercial solar installers in East Kilbride

East Kilbride is home to Kelvin (Kelvin South Business Park), College Milton and Nerston. This page sets out the grid, planning and roof issues for a commercial solar project here, what a business roof could generate, and how to get a free site survey.

Key facts

Council area South Lanarkshire
Population 76,607 (Scotland's Census 2022 population of the East Kilbride locality (NRS settlements and localities))
Network operator SP Energy Networks (SP Distribution: Central and Southern Scotland)
Main employment areas Kelvin (Kelvin South Business Park); College Milton; Nerston
Indicative yield About 858 kWh per kWp a year (south facing, 30 degrees)
Nation support page Grants and reliefs in Scotland

Where businesses are in East Kilbride

  • Kelvin (Kelvin South Business Park): Large industrial estate in the south east of the town, beside Calderglen Country Park.
  • College Milton: Industrial estate on the west side of the town, next to Hairmyres station.
  • Nerston: Industrial estate on the north side of the town.

Large employers and sectors with sites here include:

  • Government offices: The Foreign, Commonwealth and Development Office has an office at Abercrombie House, Eaglesham Road.
  • Further education: South Lanarkshire College has its main campus at Kelvin.

Large, simple roofs on distribution sheds and modern industrial units are usually the quickest and cheapest to fit. Older mill, factory and workshop buildings can work well too, but often need a structural survey first, and roofs from before 2000 may contain asbestos cement: see asbestos roofs.

Grid connection

East Kilbride is served by SP Energy Networks (SP Distribution: Central and Southern Scotland). Almost every commercial system needs G99 approval from the network operator before it is switched on, and the question is usually how much the local network can take back. Where export is limited, a G100 export limitation scheme can let a larger array connect. See G99 and DNO applications.

Planning in East Kilbride

Planning in East Kilbride is decided by South Lanarkshire council under Scotland's own system. Non-domestic rooftop solar is often permitted development under the Scottish rules, but not on listed buildings, in National Scenic Areas or within 3 km of an aerodrome.

Our planning permission guide sets out the rules.

What a business roof in East Kilbride could generate

Modelled with PVGIS for the town centre, a south-facing roof at 30 degrees produces about 858 kWh per kWp a year.

Item Illustrative figure
System 100 kWp, south facing at 30 degrees
Installed cost £900 per kWp, so £90,000 excluding VAT
Generation About 85,800 kWh a year
Used on site 70% at 24p = £14,414 saved
Exported 30% at 5p = £1,287 earned
Total a year About £15,701
Simple payback About 5.7 years before tax relief

Illustrative, not a quote: the same sums as our commercial solar calculator. A company paying corporation tax can usually shorten the payback with capital allowances.

Funding and support

  • Business Energy Scotland (Scottish Government funded): Free energy saving support for SMEs, plus the SME Loan Scheme: interest free loans of £1,000 to £130,000 with cashback of up to £20,000 for energy efficiency measures. The loan page says it is not currently accepting new applications for solar PV projects; applications are otherwise processed on a rolling basis. Check the scheme's own page for eligibility and closing dates.

National reliefs apply too: see grants and reliefs in Scotland.

Solar across South Lanarkshire

At the end of 2025, South Lanarkshire had 12,610 solar PV installations with 36.8 MW of capacity, up 176% since 2020, according to government figures. The South Lanarkshire page has the full local figures and how they compare.

Nearby towns

Sources

Frequently asked questions

Who is the electricity network operator in East Kilbride?

SP Energy Networks (SP Distribution: Central and Southern Scotland). Most commercial solar systems need its G99 approval before they are switched on. The operator follows the postcode, so confirm yours with the Energy Networks Association postcode tool.

How much would a 100 kWp solar system generate in East Kilbride?

About 85,800 kWh a year for a south-facing roof at 30 degrees, modelled with PVGIS for the town centre. At 70% used on site at 24p and the rest exported at 5p, that is worth about £15,701 a year. Your own roof, orientation and use will change this.

Can a business in East Kilbride get a free solar survey?

Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. It is free, with no obligation. Get a free survey.

Free, with no obligation

See what your business could qualify for

Find out which grants, tax relief (capital allowances) and finance options your business may qualify for, and roughly what solar could save. It comes from a free call with us and a free survey with one MCS certified installer.

Tell us about the site in under two minutes. We review every enquiry, call you to understand the building and your electricity use, and if the site looks suitable we arrange a free survey with one MCS certified installer matched to it. We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

  • On site or by video callWhichever suits the project and its stage.
  • Roof, structure, grid and energy useThe four things that decide whether solar works.
  • A clear proposalSystem size, cost range, savings and payback for your board.
  • One installer onlyYour details are not passed around a list of companies.

Want the detail first? Read how a survey works and what the survey includes.

See what your business could qualify for

Grants, tax relief and finance your business may qualify for, and roughly what solar could save. Six quick questions.

  • PPA
  • Buy outright
  • Hire purchase
  • Local schemes
Question 1 of 10: What kind of survey would you like?

Tap one to start.

Question 2 of 10: Do you own the building, or is it leased?

Tap one to carry on.

Question 3 of 10: Is this your first time looking into solar?

Tap one to carry on.

Question 4 of 10: What kind of site is it?

Tap one to carry on.

Question 5 of 10: Roughly what do you spend on electricity a month?

Tap one to carry on.

Question 6 of 10: When are you hoping to go ahead?

Tap one to carry on.

Where's the site?

So we match you with an installer who covers your area.

Who should we ask for?

The person we'll speak to about the survey.

What's the best mobile for you?

We'll ring to talk through the site. UK mobiles only.

Last one. Where should we email you?

Your survey details go here.

Free site survey, no obligation.

See what you qualify for