Skip to content
CommercialSolarSurveys.com

Commercial solar installers in Livingston

Livingston is home to Houstoun Industrial Estate, Kirkton Campus and Brucefield Industrial Estate. This page sets out the grid, planning and roof issues for a commercial solar project here, what a business roof could generate, and how to get a free site survey.

Key facts

Council area West Lothian
Population 55,836 (Scotland's Census 2022 population of the Livingston locality (NRS settlements and localities))
Network operator SP Energy Networks (SP Distribution: Central and Southern Scotland)
Main employment areas Houstoun Industrial Estate; Kirkton Campus; Brucefield Industrial Estate; Alba Business Park
Indicative yield About 854 kWh per kWp a year (south facing, 30 degrees)
Nation support page Grants and reliefs in Scotland

Where businesses are in Livingston

  • Houstoun Industrial Estate: Industrial estate (spelt Houston on the source page) where Mitsubishi Electric makes air conditioning and heat pump units and Wyman Gordon makes aircraft components.
  • Kirkton Campus: Scotland's first technology science park, home to Sky's largest UK contact centre.
  • Brucefield Industrial Estate: Industrial estate west of Bellsquarry.
  • Alba Business Park: Business park west of Adambrae with occupiers including Glenmorangie, IQVIA and Ossur.
  • Deans Industrial Estate: Industrial estate with Schuh's head office and customer service centre.

Large employers and sectors with sites here include:

  • Heat pump and air conditioning manufacturing: Mitsubishi Electric's factory produces almost 150,000 air conditioning and heat pump units a year.
  • Distribution: Tesco runs its distribution centre for Scotland and Northern Ireland on the northern edge of the town.
  • Contact centres: Sky UK's largest UK contact centre is at Kirkton Campus; it cut staff there in 2025.
  • Semiconductors and life sciences: Shin-Etsu Europe makes semiconductors and Valneva produces vaccines in the town.

Large, simple roofs on distribution sheds and modern industrial units are usually the quickest and cheapest to fit. Older mill, factory and workshop buildings can work well too, but often need a structural survey first, and roofs from before 2000 may contain asbestos cement: see asbestos roofs.

Grid connection

Livingston is served by SP Energy Networks (SP Distribution: Central and Southern Scotland). Almost every commercial system needs G99 approval from the network operator before it is switched on, and the question is usually how much the local network can take back. Where export is limited, a G100 export limitation scheme can let a larger array connect. See G99 and DNO applications.

Planning in Livingston

Planning in Livingston is decided by West Lothian council under Scotland's own system. Non-domestic rooftop solar is often permitted development under the Scottish rules, but not on listed buildings, in National Scenic Areas or within 3 km of an aerodrome.

Our planning permission guide sets out the rules.

What a business roof in Livingston could generate

Modelled with PVGIS for the town centre, a south-facing roof at 30 degrees produces about 854 kWh per kWp a year.

Item Illustrative figure
System 100 kWp, south facing at 30 degrees
Installed cost £900 per kWp, so £90,000 excluding VAT
Generation About 85,400 kWh a year
Used on site 70% at 24p = £14,347 saved
Exported 30% at 5p = £1,281 earned
Total a year About £15,628
Simple payback About 5.8 years before tax relief

Illustrative, not a quote: the same sums as our commercial solar calculator. A company paying corporation tax can usually shorten the payback with capital allowances.

Funding and support

  • Business Energy Scotland (Scottish Government funded): Free energy saving support for SMEs, plus the SME Loan Scheme: interest free loans of £1,000 to £130,000 with cashback of up to £20,000 for energy efficiency measures. The loan page says it is not currently accepting new applications for solar PV projects; applications are otherwise processed on a rolling basis. Check the scheme's own page for eligibility and closing dates.

National reliefs apply too: see grants and reliefs in Scotland.

Solar across West Lothian

At the end of 2025, West Lothian had 8,601 solar PV installations with 25.6 MW of capacity, up 204% since 2020, according to government figures. The West Lothian page has the full local figures and how they compare.

Nearby towns

Sources

Frequently asked questions

Who is the electricity network operator in Livingston?

SP Energy Networks (SP Distribution: Central and Southern Scotland). Most commercial solar systems need its G99 approval before they are switched on. The operator follows the postcode, so confirm yours with the Energy Networks Association postcode tool.

How much would a 100 kWp solar system generate in Livingston?

About 85,400 kWh a year for a south-facing roof at 30 degrees, modelled with PVGIS for the town centre. At 70% used on site at 24p and the rest exported at 5p, that is worth about £15,628 a year. Your own roof, orientation and use will change this.

Can a business in Livingston get a free solar survey?

Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. It is free, with no obligation. Get a free survey.

Free, with no obligation

See what your business could qualify for

Find out which grants, tax relief (capital allowances) and finance options your business may qualify for, and roughly what solar could save. It comes from a free call with us and a free survey with one MCS certified installer.

Tell us about the site in under two minutes. We review every enquiry, call you to understand the building and your electricity use, and if the site looks suitable we arrange a free survey with one MCS certified installer matched to it. We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

  • On site or by video callWhichever suits the project and its stage.
  • Roof, structure, grid and energy useThe four things that decide whether solar works.
  • A clear proposalSystem size, cost range, savings and payback for your board.
  • One installer onlyYour details are not passed around a list of companies.

Want the detail first? Read how a survey works and what the survey includes.

See what your business could qualify for

Grants, tax relief and finance your business may qualify for, and roughly what solar could save. Six quick questions.

  • PPA
  • Buy outright
  • Hire purchase
  • Local schemes
Question 1 of 10: What kind of survey would you like?

Tap one to start.

Question 2 of 10: Do you own the building, or is it leased?

Tap one to carry on.

Question 3 of 10: Is this your first time looking into solar?

Tap one to carry on.

Question 4 of 10: What kind of site is it?

Tap one to carry on.

Question 5 of 10: Roughly what do you spend on electricity a month?

Tap one to carry on.

Question 6 of 10: When are you hoping to go ahead?

Tap one to carry on.

Where's the site?

So we match you with an installer who covers your area.

Who should we ask for?

The person we'll speak to about the survey.

What's the best mobile for you?

We'll ring to talk through the site. UK mobiles only.

Last one. Where should we email you?

Your survey details go here.

Free site survey, no obligation.

See what you qualify for