Key facts
| Council area | Gateshead |
| Population | 115,280 (Gateshead built-up area, usual residents, Census 2021 (ONS, rounded to the nearest five)) |
| Network operator | Northern Powergrid (Northeast licence area) |
| Main employment areas | Team Valley Trading Estate; Baltic Quarter; Metrocentre |
| Indicative yield | About 939 kWh per kWp a year (south facing, 30 degrees) |
| Nation support page | Grants and reliefs in England |
Where businesses are in Gateshead
- Team Valley Trading Estate: A large trading estate set up in the 1930s. In 2019 about 700 firms operated there, employing over 20,000 people in trades, manufacturing and professional services.
- Baltic Quarter: A cluster of technology firms on a 40 acre site less than a mile from central Newcastle, with over 100,000 sq ft of studio space in four buildings including the Northern Design Centre, PROTO and RIGA. Named occupiers include Sumo Digital, Atomhawk and Gateshead College.
- Metrocentre: A 1.86 million sq ft shopping centre, 95% occupied, with over 16 million visitors a year and tenants including M&S, Next, Primark and Apple. Landsec exchanged contracts to buy it for £516m in October 2026.
Large employers and sectors with sites here include:
- Retail and leisure (Metrocentre): The Metrocentre generates retail sales of around £650m a year, and Landsec agreed to buy a 100% stake in it for £516m in October 2026.
- Video games and digital technology: The Baltic Quarter's buildings house design, software, video games and film businesses, and PROTO hosts the Digital Catapult Advanced Media Production Studio.
Large, simple roofs on distribution sheds and modern industrial units are usually the quickest and cheapest to fit. Older mill, factory and workshop buildings can work well too, but often need a structural survey first, and roofs from before 2000 may contain asbestos cement: see asbestos roofs.
Grid connection
Gateshead is served by Northern Powergrid (Northeast licence area). Almost every commercial system needs G99 approval from the network operator before it is switched on, and the question is usually how much the local network can take back. Where export is limited, a G100 export limitation scheme can let a larger array connect. See G99 and DNO applications.
Planning in Gateshead
Gateshead follows the national planning rules for England, decided by Gateshead council. Rooftop solar on most non-domestic buildings is permitted development, within height and edge limits, and systems above 50 kW need a prior approval application covering design and glare.
Points that come up locally:
- The Bridges Conservation Area in central Gateshead covers about 27.4 hectares with 18 listed buildings, including one Grade I and one Grade II*, so check a building's status before planning roof panels there.
Our guides on listed buildings and conservation areas explain what these mean for a solar project.
What a business roof in Gateshead could generate
Modelled with PVGIS for the town centre, a south-facing roof at 30 degrees produces about 939 kWh per kWp a year.
| Item | Illustrative figure |
|---|---|
| System | 100 kWp, south facing at 30 degrees |
| Installed cost | £900 per kWp, so £90,000 excluding VAT |
| Generation | About 93,900 kWh a year |
| Used on site | 70% at 24p = £15,775 saved |
| Exported | 30% at 5p = £1,409 earned |
| Total a year | About £17,184 |
| Simple payback | About 5.2 years before tax relief |
Illustrative, not a quote: the same sums as our commercial solar calculator. A company paying corporation tax can usually shorten the payback with capital allowances.
Funding and support
We found no council or regional grant for business solar open in Gateshead at the time of writing (November 2026). National reliefs still apply, such as capital allowances and, in England, the business rates exemption for onsite renewables: see grants and reliefs in England.
Solar across Gateshead
At the end of 2025, Gateshead had 3,414 solar PV installations with 16.1 MW of capacity, up 77% since 2020, according to government figures. The Gateshead page has the full local figures and how they compare.
Nearby towns
- Washington, Tyne and Wear, about 5 miles away
- South Shields, about 7 miles away
- Cramlington, about 9 miles away
- Consett, about 12 miles away
Sources
- ons.gov.uk: census2021
- ons.gov.uk: datadownload.xlsx
- netimesmagazine.co.uk
- ukspa.org.uk: baltic quarter
- retailgazette.co.uk: metrocentre 516m deal
- gov.uk: maps of north east investment zone tax sites
- gov.uk: enterprise zones
- heritagecheck.co.uk: bridges
- Yield: PVGIS 5.3 (European Commission Joint Research Centre), SARAH3 data, 14% system losses, for the town centre, modelled 4 November 2026.
- Council area figures: DESNZ, renewable electricity by local authority 2014 to 2025.
Frequently asked questions
Who is the electricity network operator in Gateshead?
Northern Powergrid (Northeast licence area). Most commercial solar systems need its G99 approval before they are switched on. The operator follows the postcode, so confirm yours with the Energy Networks Association postcode tool.
How much would a 100 kWp solar system generate in Gateshead?
About 93,900 kWh a year for a south-facing roof at 30 degrees, modelled with PVGIS for the town centre. At 70% used on site at 24p and the rest exported at 5p, that is worth about £17,184 a year. Your own roof, orientation and use will change this.
Can a business in Gateshead get a free solar survey?
Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. It is free, with no obligation. Get a free survey.
Related pages
- Gateshead3,414 installations, 16.1 MW of solar and about 941 kWh per kWp a year for a south-facing roof.
- North EastNorthern Powergrid connections, the Tyneside Clean Air Zone, Teesside and Sunderland manufacturing, Tyne and Tees ports, and Northumberland farming.
- Commercial solar calculatorEstimate commercial solar savings and payback, with the generation, price and cost assumptions shown and sourced, and the limits of a simple estimate explained.
- EnglandCurrent solar support in England for businesses, schools, public bodies, community groups and farms, plus rates, planning and who to contact.
- Planning permissionPermitted development for commercial rooftop solar and car park canopies in England, prior approval, heritage limits, ground-mounted schemes and the other UK nations.