Key facts
| Council area | South Kesteven |
| Population | 44,905 (Grantham built-up area, Census 2021 (ONS)) |
| Network operator | National Grid Electricity Distribution (East Midlands) |
| Main employment areas | Alma Park Industrial Estate; Spittlegate Level |
| Indicative yield | About 1,015 kWh per kWp a year (south facing, 30 degrees) |
| Nation support page | Grants and reliefs in England |
Where businesses are in Grantham
- Alma Park Industrial Estate: Established industrial estate north east of the town centre, served by Alma Park Road and Londonthorpe Road, with mainly steel framed industrial buildings. A 2015 council review listed occupiers including Windfield Engineering, Newark Concrete and Chandlers Oil and Gas, plus the Limesquare Business Park starter units.
- Spittlegate Level: Employment land in southern Grantham, within the wider Grantham Strategic Gateway allocation, with outline approval for 43,200 sq m of industrial (B2) and 43,200 sq m of storage and distribution (B8) floor space.
Large employers and sectors with sites here include:
- Food manufacturing (Moy Park): Moy Park's Ready to Eat facility on Gonerby Road makes coated chicken products for UK retailers, and an expansion announced in January 2024 created 40 new jobs.
Large, simple roofs on distribution sheds and modern industrial units are usually the quickest and cheapest to fit. Older mill, factory and workshop buildings can work well too, but often need a structural survey first, and roofs from before 2000 may contain asbestos cement: see asbestos roofs.
Grid connection
Grantham is served by National Grid Electricity Distribution (East Midlands). Almost every commercial system needs G99 approval from the network operator before it is switched on, and the question is usually how much the local network can take back. Where export is limited, a G100 export limitation scheme can let a larger array connect. See G99 and DNO applications.
Planning in Grantham
Grantham follows the national planning rules for England, decided by South Kesteven council. Rooftop solar on most non-domestic buildings is permitted development, within height and edge limits, and systems above 50 kW need a prior approval application covering design and glare.
Points that come up locally:
- The Grantham Conservation Area was designated in January 1970, with its appraisal amended in June 2009. Its medieval core around St Wulfram's Church has a high concentration of Grade I and II* listed buildings and is described as highly sensitive to change.
Our guides on listed buildings and conservation areas explain what these mean for a solar project.
What a business roof in Grantham could generate
Modelled with PVGIS for the town centre, a south-facing roof at 30 degrees produces about 1,015 kWh per kWp a year.
| Item | Illustrative figure |
|---|---|
| System | 100 kWp, south facing at 30 degrees |
| Installed cost | £900 per kWp, so £90,000 excluding VAT |
| Generation | About 101,500 kWh a year |
| Used on site | 70% at 24p = £17,052 saved |
| Exported | 30% at 5p = £1,523 earned |
| Total a year | About £18,575 |
| Simple payback | About 4.8 years before tax relief |
Illustrative, not a quote: the same sums as our commercial solar calculator. A company paying corporation tax can usually shorten the payback with capital allowances.
Funding and support
We found no council or regional grant for business solar open in Grantham at the time of writing (November 2026). National reliefs still apply, such as capital allowances and, in England, the business rates exemption for onsite renewables: see grants and reliefs in England.
Solar across South Kesteven
At the end of 2025, South Kesteven had 5,790 solar PV installations with 134.7 MW of capacity, up 80% since 2020, according to government figures. The South Kesteven page has the full local figures and how they compare.
Nearby towns
- Sleaford, about 11 miles away
- Newark-on-Trent, about 13 miles away
- Melton Mowbray, about 14 miles away
- Oakham, about 17 miles away
Sources
- en.wikipedia.org: List of ONS built up areas in England
- southkesteven.gov.uk: HOU6a Review of Alma Park Industrial Estate 2015
- southkesteven.oc2.uk
- lincsonline.co.uk: firm announces 40 new jobs in expansion 9349807
- southkesteven.gov.uk: Grantham Conservation Area (1)
- heritage-explorer.lincolnshire.gov.uk: DLI10632
- Yield: PVGIS 5.3 (European Commission Joint Research Centre), SARAH3 data, 14% system losses, for the town centre, modelled 4 November 2026.
- Council area figures: DESNZ, renewable electricity by local authority 2014 to 2025.
Frequently asked questions
Who is the electricity network operator in Grantham?
National Grid Electricity Distribution (East Midlands). Most commercial solar systems need its G99 approval before they are switched on. The operator follows the postcode, so confirm yours with the Energy Networks Association postcode tool.
How much would a 100 kWp solar system generate in Grantham?
About 101,500 kWh a year for a south-facing roof at 30 degrees, modelled with PVGIS for the town centre. At 70% used on site at 24p and the rest exported at 5p, that is worth about £18,575 a year. Your own roof, orientation and use will change this.
Can a business in Grantham get a free solar survey?
Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. It is free, with no obligation. Get a free survey.
Related pages
- South Kesteven5,790 installations, 134.7 MW of solar and about 1,024 kWh per kWp a year for a south-facing roof.
- East MidlandsNGED connections, Golden Triangle logistics, Lincolnshire farming and food processing, Derby manufacturing and the Nottingham Workplace Parking Levy.
- Commercial solar calculatorEstimate commercial solar savings and payback, with the generation, price and cost assumptions shown and sourced, and the limits of a simple estimate explained.
- EnglandCurrent solar support in England for businesses, schools, public bodies, community groups and farms, plus rates, planning and who to contact.
- Planning permissionPermitted development for commercial rooftop solar and car park canopies in England, prior approval, heritage limits, ground-mounted schemes and the other UK nations.