Skip to content
CommercialSolarSurveys.com

Commercial solar installers in Harlow

Harlow is home to Kao Park (London Road South), Harlow Science Park (London Road North) and Templefields. This page sets out the grid, planning and roof issues for a commercial solar project here, what a business roof could generate, and how to get a free site survey.

Key facts

Council area Harlow
Population 93,580 (Harlow built-up area, usual residents, Census 2021 (ONS))
Network operator UK Power Networks (Eastern Power Networks licence area)
Main employment areas Kao Park (London Road South); Harlow Science Park (London Road North); Templefields
Indicative yield About 1,029 kWh per kWp a year (south facing, 30 degrees)
Nation support page Grants and reliefs in England

Where businesses are in Harlow

  • Kao Park (London Road South): Part of the Harlow Enterprise Zone, on the former STC site where fibre optic telecommunications were invented, offering Grade A offices and the Kao Data campus, which the council calls the largest data centre development in the south east of England.
  • Harlow Science Park (London Road North): The science park part of the Harlow Enterprise Zone, with space in the Nexus and Modus buildings and the Arise Innovation Hub.
  • Templefields: An existing industrial estate in the Harlow Enterprise Zone offering manufacturing space and longer term redevelopment opportunities, with superfast broadband.

Large employers and sectors with sites here include:

  • Data centres (Kao Data): In December 2023 Kao Data said its second Harlow data centre, the 10MW NVIDIA DGX Ready KLON-02, was complete and running, with scope for several more buildings on the campus.
  • Healthcare (Princess Alexandra Hospital): The Princess Alexandra Hospital NHS Trust employs around 4,000 staff and serves about 350,000 people in West Essex and East Hertfordshire, from the Princess Alexandra Hospital in Harlow and sites in Bishop's Stortford and Epping.

Large, simple roofs on distribution sheds and modern industrial units are usually the quickest and cheapest to fit. Older mill, factory and workshop buildings can work well too, but often need a structural survey first, and roofs from before 2000 may contain asbestos cement: see asbestos roofs.

Grid connection

Harlow is served by UK Power Networks (Eastern Power Networks licence area). Almost every commercial system needs G99 approval from the network operator before it is switched on, and the question is usually how much the local network can take back. Where export is limited, a G100 export limitation scheme can let a larger array connect. See G99 and DNO applications.

Planning in Harlow

Harlow follows the national planning rules for England, decided by Harlow council. Rooftop solar on most non-domestic buildings is permitted development, within height and edge limits, and systems above 50 kW need a prior approval application covering design and glare.

Points that come up locally:

  • Old Harlow Conservation Area, designated in 1969, covers about 16.7 hectares and holds 37 listed buildings, three of them Grade II*, so roofs there need more care.
  • Sites in the Harlow Enterprise Zone benefit from simplified planning through Local Development Orders.

Our guides on listed buildings and conservation areas explain what these mean for a solar project.

What a business roof in Harlow could generate

Modelled with PVGIS for the town centre, a south-facing roof at 30 degrees produces about 1,029 kWh per kWp a year.

Item Illustrative figure
System 100 kWp, south facing at 30 degrees
Installed cost £900 per kWp, so £90,000 excluding VAT
Generation About 102,900 kWh a year
Used on site 70% at 24p = £17,287 saved
Exported 30% at 5p = £1,544 earned
Total a year About £18,831
Simple payback About 4.8 years before tax relief

Illustrative, not a quote: the same sums as our commercial solar calculator. A company paying corporation tax can usually shorten the payback with capital allowances.

Funding and support

We found no council or regional grant for business solar open in Harlow at the time of writing (November 2026). National reliefs still apply, such as capital allowances and, in England, the business rates exemption for onsite renewables: see grants and reliefs in England.

Solar across Harlow

At the end of 2025, Harlow had 1,367 solar PV installations with 6.7 MW of capacity, up 88% since 2020, according to government figures. The Harlow page has the full local figures and how they compare.

Nearby towns

Sources

Frequently asked questions

Who is the electricity network operator in Harlow?

UK Power Networks (Eastern Power Networks licence area). Most commercial solar systems need its G99 approval before they are switched on. The operator follows the postcode, so confirm yours with the Energy Networks Association postcode tool.

How much would a 100 kWp solar system generate in Harlow?

About 102,900 kWh a year for a south-facing roof at 30 degrees, modelled with PVGIS for the town centre. At 70% used on site at 24p and the rest exported at 5p, that is worth about £18,831 a year. Your own roof, orientation and use will change this.

Can a business in Harlow get a free solar survey?

Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. It is free, with no obligation. Get a free survey.

Free, with no obligation

See what your business could qualify for

Find out which grants, tax relief (capital allowances) and finance options your business may qualify for, and roughly what solar could save. It comes from a free call with us and a free survey with one MCS certified installer.

Tell us about the site in under two minutes. We review every enquiry, call you to understand the building and your electricity use, and if the site looks suitable we arrange a free survey with one MCS certified installer matched to it. We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

  • On site or by video callWhichever suits the project and its stage.
  • Roof, structure, grid and energy useThe four things that decide whether solar works.
  • A clear proposalSystem size, cost range, savings and payback for your board.
  • One installer onlyYour details are not passed around a list of companies.

Want the detail first? Read how a survey works and what the survey includes.

See what your business could qualify for

Grants, tax relief and finance your business may qualify for, and roughly what solar could save. Six quick questions.

  • PPA
  • Buy outright
  • Hire purchase
  • Local schemes
Question 1 of 10: What kind of survey would you like?

Tap one to start.

Question 2 of 10: Do you own the building, or is it leased?

Tap one to carry on.

Question 3 of 10: Is this your first time looking into solar?

Tap one to carry on.

Question 4 of 10: What kind of site is it?

Tap one to carry on.

Question 5 of 10: Roughly what do you spend on electricity a month?

Tap one to carry on.

Question 6 of 10: When are you hoping to go ahead?

Tap one to carry on.

Where's the site?

So we match you with an installer who covers your area.

Who should we ask for?

The person we'll speak to about the survey.

What's the best mobile for you?

We'll ring to talk through the site. UK mobiles only.

Last one. Where should we email you?

Your survey details go here.

Free site survey, no obligation.

See what you qualify for