Skip to content
CommercialSolarSurveys.com

Commercial solar installers in Irvine

Irvine is home to i3 Enterprise Area and Annickbank Innovation Campus. This page sets out the grid, planning and roof issues for a commercial solar project here, what a business roof could generate, and how to get a free site survey.

Key facts

Council area North Ayrshire
Population 33,998 (Irvine locality, Scotland's Census 2022)
Network operator SP Energy Networks (SP Distribution, Central and Southern Scotland)
Main employment areas i3 Enterprise Area; Annickbank Innovation Campus
Indicative yield About 916 kWh per kWp a year (south facing, 30 degrees)
Nation support page Grants and reliefs in Scotland

Where businesses are in Irvine

  • i3 Enterprise Area: Business campus described by Irvine Bay as Scotland's largest designated Enterprise Area, with 132 hectares of allocated land. In February 2026 North Ayrshire Council completed an 18,000 sq ft Ayrshire Growth Deal unit there with roof mounted solar PV, and GSK, Booth Welsh and Vogel are based on the site.
  • Annickbank Innovation Campus: Council business campus within i3. In June 2026 work began on its last stage, three energy efficient industrial units of about 1,500 sqm costing £4.4 million.

Large employers and sectors with sites here include:

  • Pharmaceuticals and natural remedies: North Ayrshire Council names GSK, an antibiotics manufacturer, and Vogel, a natural and herbal remedy maker, among the businesses at i3.
  • Engineering and digital manufacturing: Booth Welsh, an engineering technology firm, is at i3, and the site also hosts the Digital Process Manufacturing Centre.

Large, simple roofs on distribution sheds and modern industrial units are usually the quickest and cheapest to fit. Older mill, factory and workshop buildings can work well too, but often need a structural survey first, and roofs from before 2000 may contain asbestos cement: see asbestos roofs.

Grid connection

Irvine is served by SP Energy Networks (SP Distribution, Central and Southern Scotland). Almost every commercial system needs G99 approval from the network operator before it is switched on, and the question is usually how much the local network can take back. Where export is limited, a G100 export limitation scheme can let a larger array connect. See G99 and DNO applications.

Planning in Irvine

Planning in Irvine is decided by North Ayrshire council under Scotland's own system. Non-domestic rooftop solar is often permitted development under the Scottish rules, but not on listed buildings, in National Scenic Areas or within 3 km of an aerodrome.

Points that come up locally:

  • The Irvine Town Centre Conservation Area covers about 27.7 hectares and 52 postcodes, so check whether a building is inside it before planning roof panels in the centre.

Our guides on listed buildings and conservation areas explain what these mean for a solar project.

What a business roof in Irvine could generate

Modelled with PVGIS for the town centre, a south-facing roof at 30 degrees produces about 916 kWh per kWp a year.

Item Illustrative figure
System 100 kWp, south facing at 30 degrees
Installed cost £900 per kWp, so £90,000 excluding VAT
Generation About 91,600 kWh a year
Used on site 70% at 24p = £15,389 saved
Exported 30% at 5p = £1,374 earned
Total a year About £16,763
Simple payback About 5.4 years before tax relief

Illustrative, not a quote: the same sums as our commercial solar calculator. A company paying corporation tax can usually shorten the payback with capital allowances.

Funding and support

  • Business Energy Scotland SME Loan: Interest-free loans of £1,000 to £130,000. Cashback of 75% of eligible costs, up to £20,000 for energy efficiency measures and up to £10,000 for heat pumps, biomass boilers and solar thermal, with a maximum of £30,000 per business. Applications are processed on a rolling basis all year round, subject to loan funds. The page says the scheme is not accepting new applications for solar PV projects. Check the scheme's own page for eligibility and closing dates.

National reliefs apply too: see grants and reliefs in Scotland.

Solar across North Ayrshire

At the end of 2025, North Ayrshire had 7,492 solar PV installations with 44.1 MW of capacity, up 263% since 2020, according to government figures. The North Ayrshire page has the full local figures and how they compare.

Nearby towns

Sources

Frequently asked questions

Who is the electricity network operator in Irvine?

SP Energy Networks (SP Distribution, Central and Southern Scotland). Most commercial solar systems need its G99 approval before they are switched on. The operator follows the postcode, so confirm yours with the Energy Networks Association postcode tool.

How much would a 100 kWp solar system generate in Irvine?

About 91,600 kWh a year for a south-facing roof at 30 degrees, modelled with PVGIS for the town centre. At 70% used on site at 24p and the rest exported at 5p, that is worth about £16,763 a year. Your own roof, orientation and use will change this.

Can a business in Irvine get a free solar survey?

Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. It is free, with no obligation. Get a free survey.

Free, with no obligation

See what your business could qualify for

Find out which grants, tax relief (capital allowances) and finance options your business may qualify for, and roughly what solar could save. It comes from a free call with us and a free survey with one MCS certified installer.

Tell us about the site in under two minutes. We review every enquiry, call you to understand the building and your electricity use, and if the site looks suitable we arrange a free survey with one MCS certified installer matched to it. We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

  • On site or by video callWhichever suits the project and its stage.
  • Roof, structure, grid and energy useThe four things that decide whether solar works.
  • A clear proposalSystem size, cost range, savings and payback for your board.
  • One installer onlyYour details are not passed around a list of companies.

Want the detail first? Read how a survey works and what the survey includes.

See what your business could qualify for

Grants, tax relief and finance your business may qualify for, and roughly what solar could save. Six quick questions.

  • PPA
  • Buy outright
  • Hire purchase
  • Local schemes
Question 1 of 10: What kind of survey would you like?

Tap one to start.

Question 2 of 10: Do you own the building, or is it leased?

Tap one to carry on.

Question 3 of 10: Is this your first time looking into solar?

Tap one to carry on.

Question 4 of 10: What kind of site is it?

Tap one to carry on.

Question 5 of 10: Roughly what do you spend on electricity a month?

Tap one to carry on.

Question 6 of 10: When are you hoping to go ahead?

Tap one to carry on.

Where's the site?

So we match you with an installer who covers your area.

Who should we ask for?

The person we'll speak to about the survey.

What's the best mobile for you?

We'll ring to talk through the site. UK mobiles only.

Last one. Where should we email you?

Your survey details go here.

Free site survey, no obligation.

See what you qualify for