Skip to content
CommercialSolarSurveys.com

Commercial solar installers in Limavady

Limavady is home to Aghanloo Industrial Estate and Roe Valley Enterprises. This page sets out the grid, planning and roof issues for a commercial solar project here, what a business roof could generate, and how to get a free site survey.

Key facts

Council area Causeway Coast and Glens
Population 11,697 (Limavady settlement, usual residents, Census 2021 (NISRA table CT0046, exact settlement count))
Network operator NIE Networks
Main employment areas Aghanloo Industrial Estate; Roe Valley Enterprises
Indicative yield About 863 kWh per kWp a year (south facing, 30 degrees)
Nation support page Grants and reliefs in Northern Ireland

Where businesses are in Limavady

  • Aghanloo Industrial Estate: An industrial estate on Aghanloo Road, Limavady, where Invest NI markets a 14.4 acre (5.83 hectare) unserviced site for leasing to its client companies.
  • Roe Valley Enterprises: A not for profit local enterprise agency headquartered at Aghanloo Industrial Estate, renting industrial units and office space in Limavady and running the Roe Flexi coworking space.

Large employers and sectors with sites here include:

  • Healthcare seating manufacturing (Seating Matters): In November 2024 therapeutic seating maker Seating Matters announced a £3.7 million investment in its Limavady and Derry facilities, creating 62 jobs, with the aim of tripling turnover by 2027.
  • Food and drink: The Causeway Coast and Glens Growth Deal, signed at North West Regional College in Limavady in April 2026, includes a Foodovation and Skills Centre there expected to create 75 food sector jobs and train over 400 people a year.

Large, simple roofs on distribution sheds and modern industrial units are usually the quickest and cheapest to fit. Older mill, factory and workshop buildings can work well too, but often need a structural survey first, and roofs from before 2000 may contain asbestos cement: see asbestos roofs.

Grid connection

Limavady is served by NIE Networks, which runs the network across Northern Ireland. Systems connect under the G98/NI and G99/NI process, and there is no Smart Export Guarantee in Northern Ireland, so sizing the system to the power you use on site matters even more. See G99 and DNO applications.

Planning in Limavady

Planning in Limavady is decided by Causeway Coast and Glens council. Rooftop solar on many non-domestic buildings can go ahead without an application within the Northern Ireland limits; listed buildings need consent.

Points that come up locally:

  • Limavady's older centre has listed Georgian buildings, such as 34 Catherine Street, a Grade B1 town house listed in 1975, so listed building rules may apply to roofs in the older centre. Limavady does not appear on the Department for Infrastructure's list of conservation area guides.

Our guides on listed buildings and conservation areas explain what these mean for a solar project.

What a business roof in Limavady could generate

Modelled with PVGIS for the town centre, a south-facing roof at 30 degrees produces about 863 kWh per kWp a year.

Item Illustrative figure
System 100 kWp, south facing at 30 degrees
Installed cost £900 per kWp, so £90,000 excluding VAT
Generation About 86,300 kWh a year
Used on site 70% at 24p = £14,498 saved
Exported 30% at 5p = £1,295 earned
Total a year About £15,793
Simple payback About 5.7 years before tax relief

Illustrative, not a quote: the same sums as our commercial solar calculator. A company paying corporation tax can usually shorten the payback with capital allowances.

Funding and support

  • NISEP Commercial Energy Saving Scheme (2026/27): A Northern Ireland Sustainable Energy Programme grant of 20% for all commercial and non-domestic properties in Northern Ireland, with the applicant paying 80% and additional caps possible. Measures include solar PV and lighting (grant capped at £30,000), boiler replacement, intelligent heating controls, solar thermal and infra-red heating. Applications go to Power NI. The list of schemes covers April 2026 to March 2027. Check the scheme's own page for eligibility and closing dates.

National reliefs apply too: see grants and reliefs in Northern Ireland.

Solar across Causeway Coast and Glens

At the end of 2025, Causeway Coast and Glens had 3,089 solar PV installations with 75.6 MW of capacity, up 30% since 2020, according to government figures. The Causeway Coast and Glens page has the full local figures and how they compare.

Nearby towns

Sources

Frequently asked questions

Who is the electricity network operator in Limavady?

NIE Networks. Most commercial solar systems need its G99 approval before they are switched on. The operator follows the postcode, so confirm yours with the Energy Networks Association postcode tool.

How much would a 100 kWp solar system generate in Limavady?

About 86,300 kWh a year for a south-facing roof at 30 degrees, modelled with PVGIS for the town centre. At 70% used on site at 24p and the rest exported at 5p, that is worth about £15,793 a year. Your own roof, orientation and use will change this.

Can a business in Limavady get a free solar survey?

Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. It is free, with no obligation. Get a free survey.

Free, with no obligation

See what your business could qualify for

Find out which grants, tax relief (capital allowances) and finance options your business may qualify for, and roughly what solar could save. It comes from a free call with us and a free survey with one MCS certified installer.

Tell us about the site in under two minutes. We review every enquiry, call you to understand the building and your electricity use, and if the site looks suitable we arrange a free survey with one MCS certified installer matched to it. We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

  • On site or by video callWhichever suits the project and its stage.
  • Roof, structure, grid and energy useThe four things that decide whether solar works.
  • A clear proposalSystem size, cost range, savings and payback for your board.
  • One installer onlyYour details are not passed around a list of companies.

Want the detail first? Read how a survey works and what the survey includes.

See what your business could qualify for

Grants, tax relief and finance your business may qualify for, and roughly what solar could save. Six quick questions.

  • PPA
  • Buy outright
  • Hire purchase
  • Local schemes
Question 1 of 10: What kind of survey would you like?

Tap one to start.

Question 2 of 10: Do you own the building, or is it leased?

Tap one to carry on.

Question 3 of 10: Is this your first time looking into solar?

Tap one to carry on.

Question 4 of 10: What kind of site is it?

Tap one to carry on.

Question 5 of 10: Roughly what do you spend on electricity a month?

Tap one to carry on.

Question 6 of 10: When are you hoping to go ahead?

Tap one to carry on.

Where's the site?

So we match you with an installer who covers your area.

Who should we ask for?

The person we'll speak to about the survey.

What's the best mobile for you?

We'll ring to talk through the site. UK mobiles only.

Last one. Where should we email you?

Your survey details go here.

Free site survey, no obligation.

See what you qualify for