Skip to content
CommercialSolarSurveys.com

Commercial solar installers in Middlesbrough

Middlesbrough is home to Tees Advanced Manufacturing Park (TeesAMP), Port of Middlesbrough and Boho Zone (Middlehaven). This page sets out the grid, planning and roof issues for a commercial solar project here, what a business roof could generate, and how to get a free site survey.

Key facts

Council area Middlesbrough
Population 148,215 (Middlesbrough built-up area, usual residents, Census 2021 (ONS, rounded to the nearest five))
Network operator Northern Powergrid (Northeast licence area)
Main employment areas Tees Advanced Manufacturing Park (TeesAMP); Port of Middlesbrough; Boho Zone (Middlehaven)
Indicative yield About 938 kWh per kWp a year (south facing, 30 degrees)
Nation support page Grants and reliefs in England

Where businesses are in Middlesbrough

  • Tees Advanced Manufacturing Park (TeesAMP): A £55m park for manufacturing and research and development firms beside the Riverside Park industrial area on the south bank of the Tees, developed by Chaloner Group with Middlesbrough Council and the Tees Valley Combined Authority. Its 180,000 sq ft first phase reached practical completion in June 2020.
  • Port of Middlesbrough: AV Dawson's 40 hectare multimodal port estate on the south side of the River Tees, with deep water berths, four rail terminals, warehousing, storage and the Tees Riverside Intermodal Park.
  • Boho Zone (Middlehaven): The council's digital and creative business quarter in the Middlehaven regeneration area next to the Rail and Historic Quarter, within the 8.1 hectare St Hilda's area. The Tees Valley Combined Authority committed £20 million towards a £30 million expansion.

Large employers and sectors with sites here include:

  • Higher education (Teesside University): Teesside University has its main campus in Middlesbrough and was named University of the Year 2025 by Times Higher Education.
  • Digital and creative technology: In May 2025 the Tees Valley Combined Authority said Middlesbrough has some 630 businesses in research, development and production across digital technologies, and its Investment Zone money is aimed at the digital and creative sectors.

Large, simple roofs on distribution sheds and modern industrial units are usually the quickest and cheapest to fit. Older mill, factory and workshop buildings can work well too, but often need a structural survey first, and roofs from before 2000 may contain asbestos cement: see asbestos roofs.

Grid connection

Middlesbrough is served by Northern Powergrid (Northeast licence area). Almost every commercial system needs G99 approval from the network operator before it is switched on, and the question is usually how much the local network can take back. Where export is limited, a G100 export limitation scheme can let a larger array connect. See G99 and DNO applications.

Planning in Middlesbrough

Middlesbrough follows the national planning rules for England, decided by Middlesbrough council. Rooftop solar on most non-domestic buildings is permitted development, within height and edge limits, and systems above 50 kW need a prior approval application covering design and glare.

Points that come up locally:

  • The Middlesbrough Historic Quarter Conservation Area, about 5.7 hectares and designated in 1989, holds 20 listed buildings including the Grade II* Webb House on Zetland Road, so roofs in it need more care.

Our guides on listed buildings and conservation areas explain what these mean for a solar project.

What a business roof in Middlesbrough could generate

Modelled with PVGIS for the town centre, a south-facing roof at 30 degrees produces about 938 kWh per kWp a year.

Item Illustrative figure
System 100 kWp, south facing at 30 degrees
Installed cost £900 per kWp, so £90,000 excluding VAT
Generation About 93,800 kWh a year
Used on site 70% at 24p = £15,758 saved
Exported 30% at 5p = £1,407 earned
Total a year About £17,165
Simple payback About 5.2 years before tax relief

Illustrative, not a quote: the same sums as our commercial solar calculator. A company paying corporation tax can usually shorten the payback with capital allowances.

Funding and support

We found no council or regional grant for business solar open in Middlesbrough at the time of writing (November 2026). National reliefs still apply, such as capital allowances and, in England, the business rates exemption for onsite renewables: see grants and reliefs in England.

Solar across Middlesbrough

At the end of 2025, Middlesbrough had 2,876 solar PV installations with 13.4 MW of capacity, up 97% since 2020, according to government figures. The Middlesbrough page has the full local figures and how they compare.

Nearby towns

Sources

Frequently asked questions

Who is the electricity network operator in Middlesbrough?

Northern Powergrid (Northeast licence area). Most commercial solar systems need its G99 approval before they are switched on. The operator follows the postcode, so confirm yours with the Energy Networks Association postcode tool.

How much would a 100 kWp solar system generate in Middlesbrough?

About 93,800 kWh a year for a south-facing roof at 30 degrees, modelled with PVGIS for the town centre. At 70% used on site at 24p and the rest exported at 5p, that is worth about £17,165 a year. Your own roof, orientation and use will change this.

Can a business in Middlesbrough get a free solar survey?

Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. It is free, with no obligation. Get a free survey.

Free, with no obligation

See what your business could qualify for

Find out which grants, tax relief (capital allowances) and finance options your business may qualify for, and roughly what solar could save. It comes from a free call with us and a free survey with one MCS certified installer.

Tell us about the site in under two minutes. We review every enquiry, call you to understand the building and your electricity use, and if the site looks suitable we arrange a free survey with one MCS certified installer matched to it. We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

  • On site or by video callWhichever suits the project and its stage.
  • Roof, structure, grid and energy useThe four things that decide whether solar works.
  • A clear proposalSystem size, cost range, savings and payback for your board.
  • One installer onlyYour details are not passed around a list of companies.

Want the detail first? Read how a survey works and what the survey includes.

See what your business could qualify for

Grants, tax relief and finance your business may qualify for, and roughly what solar could save. Six quick questions.

  • PPA
  • Buy outright
  • Hire purchase
  • Local schemes
Question 1 of 10: What kind of survey would you like?

Tap one to start.

Question 2 of 10: Do you own the building, or is it leased?

Tap one to carry on.

Question 3 of 10: Is this your first time looking into solar?

Tap one to carry on.

Question 4 of 10: What kind of site is it?

Tap one to carry on.

Question 5 of 10: Roughly what do you spend on electricity a month?

Tap one to carry on.

Question 6 of 10: When are you hoping to go ahead?

Tap one to carry on.

Where's the site?

So we match you with an installer who covers your area.

Who should we ask for?

The person we'll speak to about the survey.

What's the best mobile for you?

We'll ring to talk through the site. UK mobiles only.

Last one. Where should we email you?

Your survey details go here.

Free site survey, no obligation.

See what you qualify for