Newmarket is home to Newmarket Business Park and Lynx Business Park. This page sets out the grid, planning and roof issues for a commercial solar project here, what a business roof could generate, and how to get a free site survey.

Key facts

Council area West Suffolk
Population 18,855 (Newmarket built-up area, usual residents, Census 2021 (ONS))
Network operator UK Power Networks (Eastern Power Networks licence area)
Main employment areas Newmarket Business Park; Lynx Business Park
Indicative yield About 1,033 kWh per kWp a year (south facing, 30 degrees)
Nation support page Grants and reliefs in England

Where businesses are in Newmarket

  • Newmarket Business Park: Business park on St Leger Drive, off Fordham Road, developed by Hamilton Land over about 15 years. By March 2019 it was fully developed, at over 300,000 sq ft, with occupiers including Wickes, Ridgeons, Smiths News, Cosentino UK, Newmarket Harley-Davidson and Tristel.
  • Lynx Business Park: Business park on Fordham Road at Snailwell, on Newmarket's northern edge. Infection prevention products maker Tristel has its registered offices there.

Large employers and sectors with sites here include:

  • Horse breeding and racing: A March 2023 report for West Suffolk Council and the town's horse racing industry estimated that Newmarket's horse breeding and racing cluster contributed £256.2 million of value added and 3,285 jobs in 2021/22, including 1,435 linked to trainers and 972 to stud farms.
  • Medical hygiene products (Tristel): Tristel Solutions Limited, classed as a chemical products manufacturer, and its parent Tristel plc have their registered offices at Lynx Business Park, Fordham Road.

Large, simple roofs on distribution sheds and modern industrial units are usually the quickest and cheapest to fit. Older mill, factory and workshop buildings can work well too, but often need a structural survey first, and roofs from before 2000 may contain asbestos cement: see asbestos roofs.

Grid connection

Newmarket is served by UK Power Networks (Eastern Power Networks licence area). Almost every commercial system needs G99 approval from the network operator before it is switched on, and the question is usually how much the local network can take back. Where export is limited, a G100 export limitation scheme can let a larger array connect. See G99 and DNO applications.

Planning in Newmarket

Newmarket follows the national planning rules for England, decided by West Suffolk council. Rooftop solar on most non-domestic buildings is permitted development, within height and edge limits, and systems above 50 kW need a prior approval application covering design and glare.

Points that come up locally:

  • The Newmarket Conservation Area covers about 187 hectares and holds 103 listed buildings, including the Grade II* Palace House and historic racing stables such as Abington Place; Forest Heath District Council considered its appraisal for adoption in September 2009.

Our guides on listed buildings and conservation areas explain what these mean for a solar project.

What a business roof in Newmarket could generate

Modelled with PVGIS for the town centre, a south-facing roof at 30 degrees produces about 1,033 kWh per kWp a year.

Item Illustrative figure
System 100 kWp, south facing at 30 degrees
Installed cost £900 per kWp, so £90,000 excluding VAT
Generation About 103,300 kWh a year
Used on site 70% at 24p = £17,354 saved
Exported 30% at 5p = £1,550 earned
Total a year About £18,904
Simple payback About 4.8 years before tax relief

Illustrative, not a quote: the same sums as our commercial solar calculator. A company paying corporation tax can usually shorten the payback with capital allowances.

Funding and support

  • Solar for Business (West Suffolk Council): West Suffolk Council designs, funds, installs and maintains solar panels on a business roof at no upfront cost, keeps ownership of the panels and sells the electricity they generate to the business at a discounted tariff under a 25 year lease and power purchase agreement. Buildings must be in West Suffolk, Babergh or Mid Suffolk, use at least 5,000 kWh of electricity a year and not be Grade I or II listed; tenants need landlord permission. A May 2026 councillors' report said the scheme remains open to West Suffolk businesses and had been extended to Babergh and Mid Suffolk as a pilot. Check the scheme's own page for eligibility and closing dates.

National reliefs apply too: see grants and reliefs in England.

Solar across West Suffolk

At the end of 2025, West Suffolk had 7,521 solar PV installations with 215.6 MW of capacity, up 48% since 2020, according to government figures. The West Suffolk page has the full local figures and how they compare.

Nearby towns

Sources

Frequently asked questions

Who is the electricity network operator in Newmarket?

UK Power Networks (Eastern Power Networks licence area). Most commercial solar systems need its G99 approval before they are switched on. The operator follows the postcode, so confirm yours with the Energy Networks Association postcode tool.

How much would a 100 kWp solar system generate in Newmarket?

About 103,300 kWh a year for a south-facing roof at 30 degrees, modelled with PVGIS for the town centre. At 70% used on site at 24p and the rest exported at 5p, that is worth about £18,904 a year. Your own roof, orientation and use will change this.

Can a business in Newmarket get a free solar survey?

Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. It is free, with no obligation. Get a free survey.

Free, with no obligation

See what your business could qualify for

Find out which grants, tax relief (capital allowances) and finance options your business may qualify for, and roughly what solar could save. It comes from a free call with us and a free survey with one MCS certified installer.

Tell us about the site in under two minutes. We review every enquiry, call you to understand the building and your electricity use, and if the site looks suitable we arrange a free survey with one MCS certified installer matched to it. We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

  • On site or by video callWhichever suits the project and its stage.
  • Roof, structure, grid and energy useThe four things that decide whether solar works.
  • A clear proposalSystem size, cost range, savings and payback for your board.
  • One installer onlyYour details are not passed around a list of companies.

Want the detail first? Read how a survey works and what the survey includes.

See what your business could qualify for

Grants, tax relief and finance your business may qualify for, and roughly what solar could save. Six quick questions.

  • PPA
  • Buy outright
  • Hire purchase
  • Local schemes
Question 1 of 10: What kind of survey would you like?

Tap one to start.

Question 2 of 10: Do you own the building, or is it leased?

Tap one to carry on.

Question 3 of 10: Is this your first time looking into solar?

Tap one to carry on.

Question 4 of 10: What kind of site is it?

Tap one to carry on.

Question 5 of 10: Roughly what do you spend on electricity a month?

Tap one to carry on.

Question 6 of 10: When are you hoping to go ahead?

Tap one to carry on.

Where's the site?

So we match you with an installer who covers your area.

Who should we ask for?

The person we'll speak to about the survey.

What's the best mobile for you?

We'll ring to talk through the site. UK mobiles only.

Last one. Where should we email you?

Your survey details go here.

Free site survey, no obligation.

See what you qualify for