Key facts
| Council area | Nuneaton and Bedworth |
| Population | 88,815 (Nuneaton built-up area, usual residents, Census 2021 (ONS)) |
| Network operator | National Grid Electricity Distribution (East Midlands licence area) |
| Main employment areas | Bermuda Park; Eliot Park; Attleborough Fields Industrial Estate |
| Indicative yield | About 980 kWh per kWp a year (south facing, 30 degrees) |
| Nation support page | Grants and reliefs in England |
Where businesses are in Nuneaton
- Bermuda Park: One of the sites the council names as home to well-established manufacturing and logistics clusters. Warwickshire County Council's Bermuda Innovation Centre there has four office units and six industrial units of 2,100 sq ft.
- Eliot Park: A business park where Warwickshire County Council runs the Eliot Park Innovation Centre, with units from 269 to 1,927 sq ft, and where Holland & Barrett has its registered office at Samuel Ryder House.
- Attleborough Fields Industrial Estate: Another of the council's named manufacturing and logistics sites, where the council leased a unit at Warwickshire County Council's Centenary Business Park, funded by the UK Shared Prosperity Fund, as free flexible workspace for local businesses.
Large employers and sectors with sites here include:
- Health retail head office (Holland & Barrett): Holland & Barrett International Limited, an active company whose business is listed as activities of head offices, has its registered office at Samuel Ryder House, Barling Way, Eliot Park, Nuneaton.
- Automotive and mobility research (MIRA Tech Park): MIRA Tech Park, on Watling Street just over the borough boundary in Hinckley and Bosworth but with a Nuneaton postal address, describes itself as Europe's largest mobility and technology R&D cluster, with more than 35 companies and 4 million square feet dedicated to innovation. The council promotes it as one of the area's innovation assets.
Large, simple roofs on distribution sheds and modern industrial units are usually the quickest and cheapest to fit. Older mill, factory and workshop buildings can work well too, but often need a structural survey first, and roofs from before 2000 may contain asbestos cement: see asbestos roofs.
Grid connection
Nuneaton is served by National Grid Electricity Distribution (East Midlands licence area). Almost every commercial system needs G99 approval from the network operator before it is switched on, and the question is usually how much the local network can take back. Where export is limited, a G100 export limitation scheme can let a larger array connect. See G99 and DNO applications.
Planning in Nuneaton
Nuneaton follows the national planning rules for England, decided by Nuneaton and Bedworth council. Rooftop solar on most non-domestic buildings is permitted development, within height and edge limits, and systems above 50 kW need a prior approval application covering design and glare.
Points that come up locally:
- Nuneaton Town Centre Conservation Area, designated in 1980, covers about 24.2 hectares and holds 12 listed buildings, including the Grade I Church of St Nicolas, so roofs inside it need more care.
Our guides on listed buildings and conservation areas explain what these mean for a solar project.
What a business roof in Nuneaton could generate
Modelled with PVGIS for the town centre, a south-facing roof at 30 degrees produces about 980 kWh per kWp a year.
| Item | Illustrative figure |
|---|---|
| System | 100 kWp, south facing at 30 degrees |
| Installed cost | £900 per kWp, so £90,000 excluding VAT |
| Generation | About 98,000 kWh a year |
| Used on site | 70% at 24p = £16,464 saved |
| Exported | 30% at 5p = £1,470 earned |
| Total a year | About £17,934 |
| Simple payback | About 5.0 years before tax relief |
Illustrative, not a quote: the same sums as our commercial solar calculator. A company paying corporation tax can usually shorten the payback with capital allowances.
Funding and support
We found no council or regional grant for business solar open in Nuneaton at the time of writing (November 2026). National reliefs still apply, such as capital allowances and, in England, the business rates exemption for onsite renewables: see grants and reliefs in England.
Solar across Nuneaton and Bedworth
At the end of 2025, Nuneaton and Bedworth had 3,102 solar PV installations with 12.0 MW of capacity, up 126% since 2020, according to government figures. The Nuneaton and Bedworth page has the full local figures and how they compare.
Nearby towns
- Hinckley, about 4 miles away
- Tamworth, about 12 miles away
- Rugby, about 14 miles away
- Coalville, about 14 miles away
Sources
- ons.gov.uk: census2021
- ons.gov.uk: datadownload.xlsx
- en.wikipedia.org: Nuneaton
- nuneatonandbedworth.gov.uk: business benefits
- warwickshire.gov.uk: bic
- warwickshire.gov.uk: epic
- nuneatonandbedworth.gov.uk: major boost for nuneaton and bedworth businesses
- find-and-update.company-information.service.gov.uk
- miratechnologypark.com
- gov.uk: enterprise zones
- gov.uk: maps of west midlands investment zone tax sites
- gov.uk: investment zones in england
- gov.uk: freeports
- heritagecheck.co.uk: nuneaton town centre
- Yield: PVGIS 5.3 (European Commission Joint Research Centre), SARAH3 data, 14% system losses, for the town centre, modelled 4 November 2026.
- Council area figures: DESNZ, renewable electricity by local authority 2014 to 2025.
Frequently asked questions
Who is the electricity network operator in Nuneaton?
National Grid Electricity Distribution (East Midlands licence area). Most commercial solar systems need its G99 approval before they are switched on. The operator follows the postcode, so confirm yours with the Energy Networks Association postcode tool.
How much would a 100 kWp solar system generate in Nuneaton?
About 98,000 kWh a year for a south-facing roof at 30 degrees, modelled with PVGIS for the town centre. At 70% used on site at 24p and the rest exported at 5p, that is worth about £17,934 a year. Your own roof, orientation and use will change this.
Can a business in Nuneaton get a free solar survey?
Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. It is free, with no obligation. Get a free survey.
Related pages
- Nuneaton and Bedworth3,102 installations, 12.0 MW of solar and about 980 kWh per kWp a year for a south-facing roof.
- West MidlandsNGED connections, the Birmingham Clean Air Zone, automotive and metals manufacturing, M6 and M42 logistics, and fruit and hop farming in the west.
- Commercial solar calculatorEstimate commercial solar savings and payback, with the generation, price and cost assumptions shown and sourced, and the limits of a simple estimate explained.
- EnglandCurrent solar support in England for businesses, schools, public bodies, community groups and farms, plus rates, planning and who to contact.
- Planning permissionPermitted development for commercial rooftop solar and car park canopies in England, prior approval, heritage limits, ground-mounted schemes and the other UK nations.