Key facts
| Council area | Somerset |
| Population | 50,170 (Yeovil built-up area, usual residents, Census 2021 (ONS)) |
| Network operator | SSEN Distribution (Southern Electric Power Distribution licence area) |
| Main employment areas | Houndstone Business Park; Lufton Trading Estate |
| Indicative yield | About 1,045 kWh per kWp a year (south facing, 30 degrees) |
| Nation support page | Grants and reliefs in England |
Where businesses are in Yeovil
- Houndstone Business Park: Business park in Yeovil where Screwfix moved to a purpose-built site in 1998 and later added a contact centre. Screwfix's headquarters remains in Yeovil.
- Lufton Trading Estate: Business park linking to Houndstone Business Park. In July 2022 work began there on Artillery 88, a scheme of 27 self-contained commercial units of 1,119 to 1,620 sq ft by Dorset developer Fortitudo.
Large employers and sectors with sites here include:
- Helicopter manufacturing (Leonardo): In March 2026 the Ministry of Defence awarded Leonardo a £1 billion contract to build and deliver 23 AW149 helicopters from its Yeovil site, which the local MP said protects more than 3,000 skilled jobs in the town.
- Retail headquarters (Screwfix): Screwfix, owned by Kingfisher, began in Yeovil in 1979 as the Woodscrew Supply Company and is still headquartered in the town.
Large, simple roofs on distribution sheds and modern industrial units are usually the quickest and cheapest to fit. Older mill, factory and workshop buildings can work well too, but often need a structural survey first, and roofs from before 2000 may contain asbestos cement: see asbestos roofs.
Grid connection
Yeovil is served by SSEN Distribution (Southern Electric Power Distribution licence area). Almost every commercial system needs G99 approval from the network operator before it is switched on, and the question is usually how much the local network can take back. Where export is limited, a G100 export limitation scheme can let a larger array connect. See G99 and DNO applications.
Planning in Yeovil
Yeovil follows the national planning rules for England, decided by Somerset council. Rooftop solar on most non-domestic buildings is permitted development, within height and edge limits, and systems above 50 kW need a prior approval application covering design and glare.
Points that come up locally:
- Yeovil Conservation Area, designated in 1983, covers about 10.9 hectares of the town centre and holds 68 listed buildings, including the Grade I Church of St John the Baptist, so roofs inside it need more care.
Our guides on listed buildings and conservation areas explain what these mean for a solar project.
What a business roof in Yeovil could generate
Modelled with PVGIS for the town centre, a south-facing roof at 30 degrees produces about 1,045 kWh per kWp a year.
| Item | Illustrative figure |
|---|---|
| System | 100 kWp, south facing at 30 degrees |
| Installed cost | £900 per kWp, so £90,000 excluding VAT |
| Generation | About 104,500 kWh a year |
| Used on site | 70% at 24p = £17,556 saved |
| Exported | 30% at 5p = £1,568 earned |
| Total a year | About £19,124 |
| Simple payback | About 4.7 years before tax relief |
Illustrative, not a quote: the same sums as our commercial solar calculator. A company paying corporation tax can usually shorten the payback with capital allowances.
Funding and support
We found no council or regional grant for business solar open in Yeovil at the time of writing (November 2026). National reliefs still apply, such as capital allowances and, in England, the business rates exemption for onsite renewables: see grants and reliefs in England.
Solar across Somerset
At the end of 2025, Somerset had 28,561 solar PV installations with 566.2 MW of capacity, up 23% since 2020, according to government figures. The Somerset page has the full local figures and how they compare.
Nearby towns
- Bridport, about 16 miles away
- Dorchester, about 18 miles away
- Bridgwater, about 20 miles away
- Taunton, about 21 miles away
Sources
- ons.gov.uk: census2021
- ons.gov.uk: datadownload.xlsx
- en.wikipedia.org: Screwfix
- alderking.com: work underway on 27 unit yeovil scheme
- adsgroup.org.uk: leonardo awarded mod contract for 23 medium helicopters
- yeovil-libdems.org.uk: adam dance mp welcomes award of new medium
- heritagecheck.co.uk: yeovil
- Yield: PVGIS 5.3 (European Commission Joint Research Centre), SARAH3 data, 14% system losses, for the town centre, modelled 4 November 2026.
- Council area figures: DESNZ, renewable electricity by local authority 2014 to 2025.
Frequently asked questions
Who is the electricity network operator in Yeovil?
SSEN Distribution (Southern Electric Power Distribution licence area). Most commercial solar systems need its G99 approval before they are switched on. The operator follows the postcode, so confirm yours with the Energy Networks Association postcode tool.
How much would a 100 kWp solar system generate in Yeovil?
About 104,500 kWh a year for a south-facing roof at 30 degrees, modelled with PVGIS for the town centre. At 70% used on site at 24p and the rest exported at 5p, that is worth about £19,124 a year. Your own roof, orientation and use will change this.
Can a business in Yeovil get a free solar survey?
Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. It is free, with no obligation. Get a free survey.
Related pages
- Somerset28,561 installations, 566.2 MW of solar and about 1,036 kWh per kWp a year for a south-facing roof.
- South WestThe strongest yields in mainland Britain, a network with limited export capacity in places, Bristol and Bath clean air zones, dairy farming and Severnside logistics.
- Commercial solar calculatorEstimate commercial solar savings and payback, with the generation, price and cost assumptions shown and sourced, and the limits of a simple estimate explained.
- EnglandCurrent solar support in England for businesses, schools, public bodies, community groups and farms, plus rates, planning and who to contact.
- Planning permissionPermitted development for commercial rooftop solar and car park canopies in England, prior approval, heritage limits, ground-mounted schemes and the other UK nations.