Commercial solar in County Durham

At the end of 2025, County Durham had 16,892 solar PV installations with a combined capacity of 92.7 MW, according to government figures. Here are the local figures, what a business roof here could generate, and how to arrange a free site survey.

Solar in County Durham in figures

Solar PV installations, end of 2025 16,892
Installed capacity, end of 2025 92.7 MW
Capacity, end of 2024 79.6 MW
Capacity, end of 2020 53.4 MW
Generation in 2025 85 GWh
Installations per 1,000 households 71.9 (UK median 67.0)
Average size per installation 5.5 kW
Rank by capacity 64th of 361 UK council areas; 1st of 12 in North East

What the figures show

Capacity in County Durham has grown by 73% since the end of 2020, close to the UK as a whole (69%). In 2025 alone it rose from 79.6 MW to 92.7 MW.

There are 71.9 installations for every 1,000 households, above the North East median of 65.2 and above the UK median of 67.0. That is 157th of 361 council areas, and 4th of 12 in North East.

At 5.5 kW on average, most installations here are home-sized, so business roofs make up a small share of what is installed so far.

What a business roof in County Durham could generate

Modelled with PVGIS for the centre of County Durham, a south-facing roof at 30 degrees produces about 931 kWh per kWp a year. That is 281st of 361 council areas; the UK median is 998 kWh.

Item Illustrative figure
System 100 kWp, south facing at 30 degrees
Installed cost £900 per kWp, so £90,000 excluding VAT
Generation 931 kWh per kWp, about 93,100 kWh a year
Used on site 70%, so 65,170 kWh at 24p = £15,641 saved
Exported 30%, so 27,930 kWh at 5p = £1,397 earned
Total a year About £17,037
Simple payback About 5.3 years before tax relief

Same sums as our commercial solar calculator: illustrative, not a quote. East- or west-facing roofs, shading and how much power you use in daylight all move these figures, and a company paying corporation tax can usually shorten the payback with capital allowances. See the cost guide for price ranges by system size.

Planning and grid connection

County Durham follows the national planning rules for England. Permitted development rights for non-domestic rooftop solar were widened in December 2023, including removal of the old 1 MW limit, but conditions still apply, especially for listed buildings and conservation areas. Ground-mounted arrays and carports usually need an application to the council, or to a national park authority inside a national park. Our planning permission guide sets out the conditions.

Most commercial systems need G99 approval from the local network operator before they are switched on. The operator follows the postcode rather than the council boundary: our North East page covers the operators in the region, and the Energy Networks Association postcode tool confirms yours. See G99 and DNO applications.

For funding, see grants and reliefs in England.

Nearby council areas

Or see every council area and the North East page.

Where these figures come from

Installations, capacity, generation and households: Department for Energy Security and Net Zero, Regional Renewable Statistics, renewable electricity by local authority 2014 to 2025 (workbook). They cover all solar PV, homes and businesses, including ground-mounted schemes. Yield: PVGIS 5.3 (European Commission Joint Research Centre), SARAH3 data and 14% system losses, for the council area's centre point (ONS boundaries, December 2024), modelled 4 November 2026. Distances are between centre points.

Towns in County Durham

Frequently asked questions

How much solar is installed in County Durham?

At the end of 2025, County Durham had 16,892 solar PV installations with a combined capacity of 92.7 MW, which generated about 85 GWh in 2025, according to government figures. That covers homes, businesses and ground-mounted schemes.

How much would solar on a business roof in County Durham generate?

About 931 kWh per kWp a year for a south-facing roof at 30 degrees, modelled with PVGIS for the centre of County Durham. A 100 kWp system would make roughly 93,100 kWh a year. Orientation, pitch and shading change this, and a site survey models your own roof.

Can a business in County Durham get a free solar survey?

Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. The survey is free and there is no obligation to go ahead. Get a free survey.

Free, with no obligation

See what your business could qualify for

Find out which grants, tax relief (capital allowances) and finance options your business may qualify for, and roughly what solar could save. It comes from a free call with us and a free survey with one MCS certified installer.

Tell us about the site in under two minutes. We review every enquiry, call you to understand the building and your electricity use, and if the site looks suitable we arrange a free survey with one MCS certified installer matched to it. We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

  • On site or by video callWhichever suits the project and its stage.
  • Roof, structure, grid and energy useThe four things that decide whether solar works.
  • A clear proposalSystem size, cost range, savings and payback for your board.
  • One installer onlyYour details are not passed around a list of companies.

Want the detail first? Read how a survey works and what the survey includes.

See what your business could qualify for

Grants, tax relief and finance your business may qualify for, and roughly what solar could save. Six quick questions.

  • PPA
  • Buy outright
  • Hire purchase
  • Local schemes
Question 1 of 10: What kind of survey would you like?

Tap one to start.

Question 2 of 10: Do you own the building, or is it leased?

Tap one to carry on.

Question 3 of 10: Is this your first time looking into solar?

Tap one to carry on.

Question 4 of 10: What kind of site is it?

Tap one to carry on.

Question 5 of 10: Roughly what do you spend on electricity a month?

Tap one to carry on.

Question 6 of 10: When are you hoping to go ahead?

Tap one to carry on.

Where's the site?

So we match you with an installer who covers your area.

Who should we ask for?

The person we'll speak to about the survey.

What's the best mobile for you?

We'll ring to talk through the site. UK mobiles only.

Last one. Where should we email you?

Your survey details go here.

Free site survey, no obligation.

See what you qualify for