Newton Aycliffe is home to Aycliffe Business Park, Merchant Park and Forrest Park. This page sets out the grid, planning and roof issues for a commercial solar project here, what a business roof could generate, and how to get a free site survey.

Key facts

Council area County Durham
Population 25,766 (Newton Aycliffe built-up area, Census 2021 (ONS 2022 built-up area boundaries))
Network operator Northern Powergrid (Northeast)
Main employment areas Aycliffe Business Park; Merchant Park; Forrest Park
Indicative yield About 940 kWh per kWp a year (south facing, 30 degrees)
Nation support page Grants and reliefs in England

Where businesses are in Newton Aycliffe

  • Aycliffe Business Park: Large industrial estate south of the town at junction 59 of the A1(M), home to Hitachi Rail's 30 acre train factory.
  • Merchant Park: 65 acre, £90 million development at Aycliffe Business Park, with serviced plots for buildings up to 350,000 sq ft and ten industrial starter units at Station Place.
  • Forrest Park: 48 hectare site on the A167 south of Aycliffe Business Park next to junction 59 of the A1(M), consented for 1.7 million sq ft of B1, B2 and B8 floorspace with its own 24 MW substation.

Large employers and sectors with sites here include:

  • Rail manufacturing: Hitachi Rail's UK train factory, opened in 2015.
  • Advanced manufacturing and electrification: Business Durham lists Forrest Park and Merchant Park as key sites.

Large, simple roofs on distribution sheds and modern industrial units are usually the quickest and cheapest to fit. Older mill, factory and workshop buildings can work well too, but often need a structural survey first, and roofs from before 2000 may contain asbestos cement: see asbestos roofs.

Grid connection

Newton Aycliffe is served by Northern Powergrid (Northeast). Almost every commercial system needs G99 approval from the network operator before it is switched on, and the question is usually how much the local network can take back. Where export is limited, a G100 export limitation scheme can let a larger array connect. See G99 and DNO applications.

Planning in Newton Aycliffe

Newton Aycliffe follows the national planning rules for England, decided by County Durham council. Rooftop solar on most non-domestic buildings is permitted development, within height and edge limits, and systems above 50 kW need a prior approval application covering design and glare.

Points that come up locally:

  • No green belt, National Landscape or national park lies within about 10 km of the town centre.

Our guides on green belt, national parks and National Landscapes explain what these mean for a solar project.

What a business roof in Newton Aycliffe could generate

Modelled with PVGIS for the town centre, a south-facing roof at 30 degrees produces about 940 kWh per kWp a year.

Item Illustrative figure
System 100 kWp, south facing at 30 degrees
Installed cost £900 per kWp, so £90,000 excluding VAT
Generation About 94,000 kWh a year
Used on site 70% at 24p = £15,792 saved
Exported 30% at 5p = £1,410 earned
Total a year About £17,202
Simple payback About 5.2 years before tax relief

Illustrative, not a quote: the same sums as our commercial solar calculator. A company paying corporation tax can usually shorten the payback with capital allowances.

Funding and support

  • Business Energy Efficiency Project (BEEP), Durham County Council: Independent energy audits, then through the Durham Business Growth programme grants of up to 40% of costs on projects up to £9,999 total (LED lighting, insulation, heating controls, solar PV), while funds last; the programme's third phase ends at the end of 2026. Check the scheme's own page for eligibility and closing dates.

National reliefs apply too: see grants and reliefs in England.

Solar across County Durham

At the end of 2025, County Durham had 16,892 solar PV installations with 92.7 MW of capacity, up 73% since 2020, according to government figures. The County Durham page has the full local figures and how they compare.

Nearby towns

Sources

Frequently asked questions

Who is the electricity network operator in Newton Aycliffe?

Northern Powergrid (Northeast). Most commercial solar systems need its G99 approval before they are switched on. The operator follows the postcode, so confirm yours with the Energy Networks Association postcode tool.

How much would a 100 kWp solar system generate in Newton Aycliffe?

About 94,000 kWh a year for a south-facing roof at 30 degrees, modelled with PVGIS for the town centre. At 70% used on site at 24p and the rest exported at 5p, that is worth about £17,202 a year. Your own roof, orientation and use will change this.

Can a business in Newton Aycliffe get a free solar survey?

Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. It is free, with no obligation. Get a free survey.

Free, with no obligation

See what your business could qualify for

Find out which grants, tax relief (capital allowances) and finance options your business may qualify for, and roughly what solar could save. It comes from a free call with us and a free survey with one MCS certified installer.

Tell us about the site in under two minutes. We review every enquiry, call you to understand the building and your electricity use, and if the site looks suitable we arrange a free survey with one MCS certified installer matched to it. We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

  • On site or by video callWhichever suits the project and its stage.
  • Roof, structure, grid and energy useThe four things that decide whether solar works.
  • A clear proposalSystem size, cost range, savings and payback for your board.
  • One installer onlyYour details are not passed around a list of companies.

Want the detail first? Read how a survey works and what the survey includes.

See what your business could qualify for

Grants, tax relief and finance your business may qualify for, and roughly what solar could save. Six quick questions.

  • PPA
  • Buy outright
  • Hire purchase
  • Local schemes
Question 1 of 10: What kind of survey would you like?

Tap one to start.

Question 2 of 10: Do you own the building, or is it leased?

Tap one to carry on.

Question 3 of 10: Is this your first time looking into solar?

Tap one to carry on.

Question 4 of 10: What kind of site is it?

Tap one to carry on.

Question 5 of 10: Roughly what do you spend on electricity a month?

Tap one to carry on.

Question 6 of 10: When are you hoping to go ahead?

Tap one to carry on.

Where's the site?

So we match you with an installer who covers your area.

Who should we ask for?

The person we'll speak to about the survey.

What's the best mobile for you?

We'll ring to talk through the site. UK mobiles only.

Last one. Where should we email you?

Your survey details go here.

Free site survey, no obligation.

See what you qualify for