Key facts
| Council area | Hyndburn |
| Population | 34,895 (Accrington built-up area, usual residents, Census 2021 (ONS)) |
| Network operator | Electricity North West (North West licence area) |
| Main employment areas | Huncoat Industrial Estate; Broad Oak |
| Indicative yield | About 874 kWh per kWp a year (south facing, 30 degrees) |
| Nation support page | Grants and reliefs in England |
Where businesses are in Accrington
- Huncoat Industrial Estate: A modern manufacturing estate on Newhouse Road that Hyndburn's 2025 Local Plan says is home to large employers including Senator and Bensons for Beds. The council approved a new industrial building there in March 2024.
- Broad Oak: An employment area in central Accrington where the council's 2025 Local Plan names foam maker Caligen Foam as a large employer.
Large employers and sectors with sites here include:
- Furniture manufacturing (Senator Group): In May 2024 Hyndburn Council approved an extension to Senator Group's manufacturing facility on Newhouse Road, Huncoat, adding office space and a larger canteen.
- Brick making (Forterra): Forterra's Accrington plant has made bricks from locally sourced clay for more than 100 years and makes the brick slips for the Omnia system launched in May 2026.
Large, simple roofs on distribution sheds and modern industrial units are usually the quickest and cheapest to fit. Older mill, factory and workshop buildings can work well too, but often need a structural survey first, and roofs from before 2000 may contain asbestos cement: see asbestos roofs.
Grid connection
Accrington is served by Electricity North West (North West licence area). Almost every commercial system needs G99 approval from the network operator before it is switched on, and the question is usually how much the local network can take back. Where export is limited, a G100 export limitation scheme can let a larger array connect. See G99 and DNO applications.
Planning in Accrington
Accrington follows the national planning rules for England, decided by Hyndburn council. Rooftop solar on most non-domestic buildings is permitted development, within height and edge limits, and systems above 50 kW need a prior approval application covering design and glare.
Points that come up locally:
- The Accrington Town Centre Conservation Area, designated in 1976, covers about 8.8 hectares and holds 13 listed buildings, including the Grade II* Town Hall, the Market Hall and the Carnegie Library, so roofs in the centre need more care.
Our guides on listed buildings and conservation areas explain what these mean for a solar project.
What a business roof in Accrington could generate
Modelled with PVGIS for the town centre, a south-facing roof at 30 degrees produces about 874 kWh per kWp a year.
| Item | Illustrative figure |
|---|---|
| System | 100 kWp, south facing at 30 degrees |
| Installed cost | £900 per kWp, so £90,000 excluding VAT |
| Generation | About 87,400 kWh a year |
| Used on site | 70% at 24p = £14,683 saved |
| Exported | 30% at 5p = £1,311 earned |
| Total a year | About £15,994 |
| Simple payback | About 5.6 years before tax relief |
Illustrative, not a quote: the same sums as our commercial solar calculator. A company paying corporation tax can usually shorten the payback with capital allowances.
Funding and support
We found no council or regional grant for business solar open in Accrington at the time of writing (November 2026). National reliefs still apply, such as capital allowances and, in England, the business rates exemption for onsite renewables: see grants and reliefs in England.
Solar across Hyndburn
At the end of 2025, Hyndburn had 1,088 solar PV installations with 10.0 MW of capacity, up 95% since 2020, according to government figures. The Hyndburn page has the full local figures and how they compare.
Nearby towns
- Blackburn, about 5 miles away
- Burnley, about 6 miles away
- Nelson, about 8 miles away
- Clitheroe, about 9 miles away
Sources
- ons.gov.uk: census2021
- ons.gov.uk: datadownload.xlsx
- hyndburnbc.gov.uk: HBC1.001 Local Plan Publication Reg22 2025 Submission Version
- hyndburnbc.gov.uk: H005 Appendix 3 Employment Land Supply
- professionalbuildersmerchant.co.uk: forterra launches uk manufactured complete brick slip system
- gov.uk: investment zones in england
- gov.uk: enterprise zones
- heritagecheck.co.uk
- heritagecheck.co.uk: accrington town centre
- Yield: PVGIS 5.3 (European Commission Joint Research Centre), SARAH3 data, 14% system losses, for the town centre, modelled 4 November 2026.
- Council area figures: DESNZ, renewable electricity by local authority 2014 to 2025.
Frequently asked questions
Who is the electricity network operator in Accrington?
Electricity North West (North West licence area). Most commercial solar systems need its G99 approval before they are switched on. The operator follows the postcode, so confirm yours with the Energy Networks Association postcode tool.
How much would a 100 kWp solar system generate in Accrington?
About 87,400 kWh a year for a south-facing roof at 30 degrees, modelled with PVGIS for the town centre. At 70% used on site at 24p and the rest exported at 5p, that is worth about £15,994 a year. Your own roof, orientation and use will change this.
Can a business in Accrington get a free solar survey?
Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. It is free, with no obligation. Get a free survey.
Related pages
- Hyndburn1,088 installations, 10.0 MW of solar and about 874 kWh per kWp a year for a south-facing roof.
- North WestTwo network operators, realistic northern yields, Trafford Park, the Port of Liverpool, Cheshire chemicals and Cumbrian farming, and Greater Manchester's non-charging clean air plan.
- Commercial solar calculatorEstimate commercial solar savings and payback, with the generation, price and cost assumptions shown and sourced, and the limits of a simple estimate explained.
- EnglandCurrent solar support in England for businesses, schools, public bodies, community groups and farms, plus rates, planning and who to contact.
- Planning permissionPermitted development for commercial rooftop solar and car park canopies in England, prior approval, heritage limits, ground-mounted schemes and the other UK nations.