Skip to content
CommercialSolarSurveys.com

Commercial solar installers in Clitheroe

Clitheroe is home to Salthill Industrial Estate and Barrow Brook Business Village. This page sets out the grid, planning and roof issues for a commercial solar project here, what a business roof could generate, and how to get a free site survey.

Key facts

Council area Ribble Valley
Population 16,630 (Clitheroe built-up area, usual residents, Census 2021 (ONS, rounded to the nearest five))
Network operator Electricity North West (North West licence area)
Main employment areas Salthill Industrial Estate; Barrow Brook Business Village
Indicative yield About 874 kWh per kWp a year (south facing, 30 degrees)
Nation support page Grants and reliefs in England

Where businesses are in Clitheroe

  • Salthill Industrial Estate: Clitheroe's industrial area off Salthill Road, where Ribble Valley Borough Council's employment land monitor reported James Alpe's workshop and warehouse units on the former golf driving range as partly built and occupied, taking up 1.85 hectares.
  • Barrow Brook Business Village: Business village just off the A59 on the outskirts of Clitheroe, with trade park units, offices, a nursery, a service area and food outlets; the council identified adjoining land at Barrow Brook as strategic employment land.

Large employers and sectors with sites here include:

  • Cement (Heidelberg Materials Ribblesdale works): Heidelberg Materials UK runs the Ribblesdale cement works on West Bradford Road, and in April 2025 Lancashire County Council approved an amendment to the dimensions of new filters being installed there.
  • Roof systems (Ultraframe): Ultraframe, which designs and makes conservatory and extension roof systems, has its headquarters in Clitheroe; in July 2021, after more than 35 years making roofs there, it took a new 60,000 sq ft facility near its 350,000 sq ft Ribble Valley headquarters.

Large, simple roofs on distribution sheds and modern industrial units are usually the quickest and cheapest to fit. Older mill, factory and workshop buildings can work well too, but often need a structural survey first, and roofs from before 2000 may contain asbestos cement: see asbestos roofs.

Grid connection

Clitheroe is served by Electricity North West (North West licence area). Almost every commercial system needs G99 approval from the network operator before it is switched on, and the question is usually how much the local network can take back. Where export is limited, a G100 export limitation scheme can let a larger array connect. See G99 and DNO applications.

Planning in Clitheroe

Clitheroe follows the national planning rules for England, decided by Ribble Valley council. Rooftop solar on most non-domestic buildings is permitted development, within height and edge limits, and systems above 50 kW need a prior approval application covering design and glare.

Points that come up locally:

  • The Clitheroe Conservation Area covers about 31.8 hectares and holds 97 listed buildings, including the Grade I Clitheroe Castle and the Grade II* Parish Church of St Mary Magdalene, so roofs in the centre need more care.

Our guides on listed buildings and conservation areas explain what these mean for a solar project.

What a business roof in Clitheroe could generate

Modelled with PVGIS for the town centre, a south-facing roof at 30 degrees produces about 874 kWh per kWp a year.

Item Illustrative figure
System 100 kWp, south facing at 30 degrees
Installed cost £900 per kWp, so £90,000 excluding VAT
Generation About 87,400 kWh a year
Used on site 70% at 24p = £14,683 saved
Exported 30% at 5p = £1,311 earned
Total a year About £15,994
Simple payback About 5.6 years before tax relief

Illustrative, not a quote: the same sums as our commercial solar calculator. A company paying corporation tax can usually shorten the payback with capital allowances.

Funding and support

We found no council or regional grant for business solar open in Clitheroe at the time of writing (November 2026). National reliefs still apply, such as capital allowances and, in England, the business rates exemption for onsite renewables: see grants and reliefs in England.

Solar across Ribble Valley

At the end of 2025, Ribble Valley had 1,918 solar PV installations with 19.0 MW of capacity, up 43% since 2020, according to government figures. The Ribble Valley page has the full local figures and how they compare.

Nearby towns

Sources

Frequently asked questions

Who is the electricity network operator in Clitheroe?

Electricity North West (North West licence area). Most commercial solar systems need its G99 approval before they are switched on. The operator follows the postcode, so confirm yours with the Energy Networks Association postcode tool.

How much would a 100 kWp solar system generate in Clitheroe?

About 87,400 kWh a year for a south-facing roof at 30 degrees, modelled with PVGIS for the town centre. At 70% used on site at 24p and the rest exported at 5p, that is worth about £15,994 a year. Your own roof, orientation and use will change this.

Can a business in Clitheroe get a free solar survey?

Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. It is free, with no obligation. Get a free survey.

Free, with no obligation

See what your business could qualify for

Find out which grants, tax relief (capital allowances) and finance options your business may qualify for, and roughly what solar could save. It comes from a free call with us and a free survey with one MCS certified installer.

Tell us about the site in under two minutes. We review every enquiry, call you to understand the building and your electricity use, and if the site looks suitable we arrange a free survey with one MCS certified installer matched to it. We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

  • On site or by video callWhichever suits the project and its stage.
  • Roof, structure, grid and energy useThe four things that decide whether solar works.
  • A clear proposalSystem size, cost range, savings and payback for your board.
  • One installer onlyYour details are not passed around a list of companies.

Want the detail first? Read how a survey works and what the survey includes.

See what your business could qualify for

Grants, tax relief and finance your business may qualify for, and roughly what solar could save. Six quick questions.

  • PPA
  • Buy outright
  • Hire purchase
  • Local schemes
Question 1 of 10: What kind of survey would you like?

Tap one to start.

Question 2 of 10: Do you own the building, or is it leased?

Tap one to carry on.

Question 3 of 10: Is this your first time looking into solar?

Tap one to carry on.

Question 4 of 10: What kind of site is it?

Tap one to carry on.

Question 5 of 10: Roughly what do you spend on electricity a month?

Tap one to carry on.

Question 6 of 10: When are you hoping to go ahead?

Tap one to carry on.

Where's the site?

So we match you with an installer who covers your area.

Who should we ask for?

The person we'll speak to about the survey.

What's the best mobile for you?

We'll ring to talk through the site. UK mobiles only.

Last one. Where should we email you?

Your survey details go here.

Free site survey, no obligation.

See what you qualify for