Commercial solar installers in Antrim

Antrim is home to Antrim Technology Park, Enkalon Business Park and Kilbegs Business Park. This page sets out the grid, planning and roof issues for a commercial solar project here, what a business roof could generate, and how to get a free site survey.

Key facts

Council area Antrim and Newtownabbey
Population 25,464 (Antrim settlement, usual residents, Census 2021 (NISRA table CT0046, exact settlement count))
Network operator NIE Networks
Main employment areas Antrim Technology Park; Enkalon Business Park; Kilbegs Business Park
Indicative yield About 884 kWh per kWp a year (south facing, 30 degrees)
Nation support page Grants and reliefs in Northern Ireland

Where businesses are in Antrim

  • Antrim Technology Park: Park on the Belfast Road opened in 1986 by the Industrial Development Board, with 16 business units. Occupiers include NIE, Nitec Solutions, Delap & Waller, Fortress Diagnostics and Sensata Technologies, and it was put up for sale at £5.5 million in September 2025.
  • Enkalon Business Park: Industrial and distribution park just off the M2, where Errigal Group is building new warehouse units of 10,000 to 355,000 sq ft. Existing occupiers include Tesco, DPD, Sports Direct, Bathshack and Huhtamaki.
  • Kilbegs Business Park: Business park on Kilbegs Road with industrial units; neighbouring occupiers include Harley Davidson, Marcon and Firmus Energy.

Large employers and sectors with sites here include:

  • Sensors and electronics (Sensata): Sensata Technologies has a manufacturing plant in Antrim with hundreds of staff, and opened a 67,000 sq ft research and development centre in Newtownabbey in June 2025.
  • Logistics and distribution: Enkalon Business Park, described by its developer as an industrial and distribution hub, already hosts Tesco, DPD, Sports Direct, Bathshack and Huhtamaki, and is planned to total 1.75 million sq ft.

Large, simple roofs on distribution sheds and modern industrial units are usually the quickest and cheapest to fit. Older mill, factory and workshop buildings can work well too, but often need a structural survey first, and roofs from before 2000 may contain asbestos cement: see asbestos roofs.

Grid connection

Antrim is served by NIE Networks, which runs the network across Northern Ireland. Systems connect under the G98/NI and G99/NI process, and there is no Smart Export Guarantee in Northern Ireland, so sizing the system to the power you use on site matters even more. See G99 and DNO applications.

Planning in Antrim

Planning in Antrim is decided by Antrim and Newtownabbey council. Rooftop solar on many non-domestic buildings can go ahead without an application within the Northern Ireland limits; listed buildings need consent.

Points that come up locally:

  • Antrim Town Centre is a conservation area with a published guide, so check whether a building is inside it before planning roof panels in the centre.

Our guides on listed buildings and conservation areas explain what these mean for a solar project.

What a business roof in Antrim could generate

Modelled with PVGIS for the town centre, a south-facing roof at 30 degrees produces about 884 kWh per kWp a year.

Item Illustrative figure
System 100 kWp, south facing at 30 degrees
Installed cost £900 per kWp, so £90,000 excluding VAT
Generation About 88,400 kWh a year
Used on site 70% at 24p = £14,851 saved
Exported 30% at 5p = £1,326 earned
Total a year About £16,177
Simple payback About 5.6 years before tax relief

Illustrative, not a quote: the same sums as our commercial solar calculator. A company paying corporation tax can usually shorten the payback with capital allowances.

Funding and support

  • NISEP Commercial Energy Saving Scheme (2026/27): A Northern Ireland Sustainable Energy Programme grant of 20% for commercial and non-domestic properties anywhere in Northern Ireland, with the applicant paying 80%. Measures include solar PV (grant capped at £30,000), boiler replacement, intelligent heating controls and lighting. Applications go to Power NI. The list of schemes covers April 2026 to March 2027. Check the scheme's own page for eligibility and closing dates.

National reliefs apply too: see grants and reliefs in Northern Ireland.

Solar across Antrim and Newtownabbey

At the end of 2025, Antrim and Newtownabbey had 2,604 solar PV installations with 69.7 MW of capacity, up 104% since 2020, according to government figures. The Antrim and Newtownabbey page has the full local figures and how they compare.

Nearby towns

Sources

Frequently asked questions

Who is the electricity network operator in Antrim?

NIE Networks. Most commercial solar systems need its G99 approval before they are switched on. The operator follows the postcode, so confirm yours with the Energy Networks Association postcode tool.

How much would a 100 kWp solar system generate in Antrim?

About 88,400 kWh a year for a south-facing roof at 30 degrees, modelled with PVGIS for the town centre. At 70% used on site at 24p and the rest exported at 5p, that is worth about £16,177 a year. Your own roof, orientation and use will change this.

Can a business in Antrim get a free solar survey?

Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. It is free, with no obligation. Get a free survey.

Free, with no obligation

See what your business could qualify for

Find out which grants, tax relief (capital allowances) and finance options your business may qualify for, and roughly what solar could save. It comes from a free call with us and a free survey with one MCS certified installer.

Tell us about the site in under two minutes. We review every enquiry, call you to understand the building and your electricity use, and if the site looks suitable we arrange a free survey with one MCS certified installer matched to it. We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

  • On site or by video callWhichever suits the project and its stage.
  • Roof, structure, grid and energy useThe four things that decide whether solar works.
  • A clear proposalSystem size, cost range, savings and payback for your board.
  • One installer onlyYour details are not passed around a list of companies.

Want the detail first? Read how a survey works and what the survey includes.

See what your business could qualify for

Grants, tax relief and finance your business may qualify for, and roughly what solar could save. Six quick questions.

  • PPA
  • Buy outright
  • Hire purchase
  • Local schemes
Question 1 of 10: What kind of survey would you like?

Tap one to start.

Question 2 of 10: Do you own the building, or is it leased?

Tap one to carry on.

Question 3 of 10: Is this your first time looking into solar?

Tap one to carry on.

Question 4 of 10: What kind of site is it?

Tap one to carry on.

Question 5 of 10: Roughly what do you spend on electricity a month?

Tap one to carry on.

Question 6 of 10: When are you hoping to go ahead?

Tap one to carry on.

Where's the site?

So we match you with an installer who covers your area.

Who should we ask for?

The person we'll speak to about the survey.

What's the best mobile for you?

We'll ring to talk through the site. UK mobiles only.

Last one. Where should we email you?

Your survey details go here.

Free site survey, no obligation.

See what you qualify for