Skip to content
CommercialSolarSurveys.com

Commercial solar installers in Carrickfergus

Carrickfergus is home to Kilroot Business Park, Trooperslane Industrial Estate and Carrickfergus Enterprise (Meadowbank Road). This page sets out the grid, planning and roof issues for a commercial solar project here, what a business roof could generate, and how to get a free site survey.

Key facts

Council area Mid and East Antrim
Population 27,886 (Carrickfergus settlement, usual residents, Census 2021 (NISRA table CT0046, exact settlement count))
Network operator NIE Networks
Main employment areas Kilroot Business Park; Trooperslane Industrial Estate; Carrickfergus Enterprise (Meadowbank Road)
Indicative yield About 914 kWh per kWp a year (south facing, 30 degrees)
Nation support page Grants and reliefs in Northern Ireland

Where businesses are in Carrickfergus

  • Kilroot Business Park: A 60 acre park on Larne Road with about 750,000 sq ft of industrial and business space, roughly midway between Belfast Harbour and the Port of Larne; it has its own 1MW solar installation and land for design-and-build units of 100,000 sq ft or more.
  • Trooperslane Industrial Estate: Industrial estate on the Belfast Road where Invest NI offers an 8 acre unserviced site for lease to its client companies.
  • Carrickfergus Enterprise (Meadowbank Road): Business park at 8 Meadowbank Road with industrial units of 500 to 2,000 sq ft, workshops and micro offices across three phases, let on one month's notice.

Large employers and sectors with sites here include:

  • Aluminium die casting (Ryobi): Ryobi Aluminium Casting (UK), on Meadowbank Road, was established in 1990 as part of the Ryobi Group and makes high-pressure die cast aluminium components for major manufacturers and Tier 1 suppliers, with over 500 employees and annual turnover of £100 million.
  • Salt mining (Irish Salt Mining): Irish Salt Mining at Kilroot, about 3 miles north east of Carrickfergus, produces around 500,000 tonnes of de-icing rock salt a year with 59 full-time staff.

Large, simple roofs on distribution sheds and modern industrial units are usually the quickest and cheapest to fit. Older mill, factory and workshop buildings can work well too, but often need a structural survey first, and roofs from before 2000 may contain asbestos cement: see asbestos roofs.

Grid connection

Carrickfergus is served by NIE Networks, which runs the network across Northern Ireland. Systems connect under the G98/NI and G99/NI process, and there is no Smart Export Guarantee in Northern Ireland, so sizing the system to the power you use on site matters even more. See G99 and DNO applications.

Planning in Carrickfergus

Planning in Carrickfergus is decided by Mid and East Antrim council. Rooftop solar on many non-domestic buildings can go ahead without an application within the Northern Ireland limits; listed buildings need consent.

Points that come up locally:

  • The Carrickfergus Conservation Area, designated in 1991, covers the historic core within the town walls, the castle and the harbour, and has its own design guide, so check whether a building is inside it before planning roof panels.

Our guides on listed buildings and conservation areas explain what these mean for a solar project.

What a business roof in Carrickfergus could generate

Modelled with PVGIS for the town centre, a south-facing roof at 30 degrees produces about 914 kWh per kWp a year.

Item Illustrative figure
System 100 kWp, south facing at 30 degrees
Installed cost £900 per kWp, so £90,000 excluding VAT
Generation About 91,400 kWh a year
Used on site 70% at 24p = £15,355 saved
Exported 30% at 5p = £1,371 earned
Total a year About £16,726
Simple payback About 5.4 years before tax relief

Illustrative, not a quote: the same sums as our commercial solar calculator. A company paying corporation tax can usually shorten the payback with capital allowances.

Funding and support

  • NISEP Commercial Energy Saving Scheme (2026/27): A Northern Ireland Sustainable Energy Programme grant of 20% for commercial and non-domestic properties anywhere in Northern Ireland, with the applicant paying 80%. Measures include solar PV (grant capped at £30,000), boiler replacement, intelligent heating controls and lighting. Applications go to Power NI. The list of schemes covers April 2026 to March 2027. Check the scheme's own page for eligibility and closing dates.

National reliefs apply too: see grants and reliefs in Northern Ireland.

Solar across Mid and East Antrim

At the end of 2025, Mid and East Antrim had 2,698 solar PV installations with 28.1 MW of capacity, up 113% since 2020, according to government figures. The Mid and East Antrim page has the full local figures and how they compare.

Nearby towns

Sources

Frequently asked questions

Who is the electricity network operator in Carrickfergus?

NIE Networks. Most commercial solar systems need its G99 approval before they are switched on. The operator follows the postcode, so confirm yours with the Energy Networks Association postcode tool.

How much would a 100 kWp solar system generate in Carrickfergus?

About 91,400 kWh a year for a south-facing roof at 30 degrees, modelled with PVGIS for the town centre. At 70% used on site at 24p and the rest exported at 5p, that is worth about £16,726 a year. Your own roof, orientation and use will change this.

Can a business in Carrickfergus get a free solar survey?

Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. It is free, with no obligation. Get a free survey.

Free, with no obligation

See what your business could qualify for

Find out which grants, tax relief (capital allowances) and finance options your business may qualify for, and roughly what solar could save. It comes from a free call with us and a free survey with one MCS certified installer.

Tell us about the site in under two minutes. We review every enquiry, call you to understand the building and your electricity use, and if the site looks suitable we arrange a free survey with one MCS certified installer matched to it. We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

  • On site or by video callWhichever suits the project and its stage.
  • Roof, structure, grid and energy useThe four things that decide whether solar works.
  • A clear proposalSystem size, cost range, savings and payback for your board.
  • One installer onlyYour details are not passed around a list of companies.

Want the detail first? Read how a survey works and what the survey includes.

See what your business could qualify for

Grants, tax relief and finance your business may qualify for, and roughly what solar could save. Six quick questions.

  • PPA
  • Buy outright
  • Hire purchase
  • Local schemes
Question 1 of 10: What kind of survey would you like?

Tap one to start.

Question 2 of 10: Do you own the building, or is it leased?

Tap one to carry on.

Question 3 of 10: Is this your first time looking into solar?

Tap one to carry on.

Question 4 of 10: What kind of site is it?

Tap one to carry on.

Question 5 of 10: Roughly what do you spend on electricity a month?

Tap one to carry on.

Question 6 of 10: When are you hoping to go ahead?

Tap one to carry on.

Where's the site?

So we match you with an installer who covers your area.

Who should we ask for?

The person we'll speak to about the survey.

What's the best mobile for you?

We'll ring to talk through the site. UK mobiles only.

Last one. Where should we email you?

Your survey details go here.

Free site survey, no obligation.

See what you qualify for