Skip to content
CommercialSolarSurveys.com

Commercial solar installers in Ashby-de-la-Zouch

Ashby-de-la-Zouch is home to Ivanhoe Business Park, Ashby Business Park and Nottingham Road Industrial Estate. This page sets out the grid, planning and roof issues for a commercial solar project here, what a business roof could generate, and how to get a free site survey.

Key facts

Council area North West Leicestershire
Population 15,120 (Ashby-de-la-Zouch built-up area, usual residents, Census 2021 (ONS))
Network operator National Grid Electricity Distribution (East Midlands licence area)
Main employment areas Ivanhoe Business Park; Ashby Business Park; Nottingham Road Industrial Estate
Indicative yield About 975 kWh per kWp a year (south facing, 30 degrees)
Nation support page Grants and reliefs in England

Where businesses are in Ashby-de-la-Zouch

  • Ivanhoe Business Park: One of Ashby's primary employment areas, off the A511 bypass near the A42, with well over 200,000 sq ft of industrial and distribution space built by 2017 and office occupiers; BEUMER Group opened its UK head office there in April 2023.
  • Ashby Business Park: An Indurent industrial estate on Coalfield Way, named by the district council as a primary employment area, offering units with 9 metre eaves, level loading, secure yards and offices, about 10 miles from East Midlands Airport.
  • Nottingham Road Industrial Estate: Named by North West Leicestershire District Council as one of Ashby's three primary employment areas, alongside Ashby Business Park and Ivanhoe Business Park.

Large employers and sectors with sites here include:

  • Snack manufacturing (KP Snacks): KP Snacks traces its Ashby factory to 1948, when Meredith and Drew opened there and became one of the first UK makers of potato crisps; in 2020 KP moved popchips production into a new facility at the Ashby factory, creating 24 jobs.
  • Materials handling systems (BEUMER Group): BEUMER Group, a global supplier of intralogistics and baggage handling systems, opened its UK head office at Ivanhoe Business Park in April 2023.

Large, simple roofs on distribution sheds and modern industrial units are usually the quickest and cheapest to fit. Older mill, factory and workshop buildings can work well too, but often need a structural survey first, and roofs from before 2000 may contain asbestos cement: see asbestos roofs.

Grid connection

Ashby-de-la-Zouch is served by National Grid Electricity Distribution (East Midlands licence area). Almost every commercial system needs G99 approval from the network operator before it is switched on, and the question is usually how much the local network can take back. Where export is limited, a G100 export limitation scheme can let a larger array connect. See G99 and DNO applications.

Planning in Ashby-de-la-Zouch

Ashby-de-la-Zouch follows the national planning rules for England, decided by North West Leicestershire council. Rooftop solar on most non-domestic buildings is permitted development, within height and edge limits, and systems above 50 kW need a prior approval application covering design and glare.

Points that come up locally:

  • The Ashby conservation area covers the historic core of the town centre and includes the Grade I listed Ashby Castle, so roofs in the centre need more care.

Our guides on listed buildings and conservation areas explain what these mean for a solar project.

What a business roof in Ashby-de-la-Zouch could generate

Modelled with PVGIS for the town centre, a south-facing roof at 30 degrees produces about 975 kWh per kWp a year.

Item Illustrative figure
System 100 kWp, south facing at 30 degrees
Installed cost £900 per kWp, so £90,000 excluding VAT
Generation About 97,500 kWh a year
Used on site 70% at 24p = £16,380 saved
Exported 30% at 5p = £1,463 earned
Total a year About £17,843
Simple payback About 5.0 years before tax relief

Illustrative, not a quote: the same sums as our commercial solar calculator. A company paying corporation tax can usually shorten the payback with capital allowances.

Funding and support

We found no council or regional grant for business solar open in Ashby-de-la-Zouch at the time of writing (November 2026). National reliefs still apply, such as capital allowances and, in England, the business rates exemption for onsite renewables: see grants and reliefs in England.

Solar across North West Leicestershire

At the end of 2025, North West Leicestershire had 3,785 solar PV installations with 73.2 MW of capacity, up 26% since 2020, according to government figures. The North West Leicestershire page has the full local figures and how they compare.

Nearby towns

Sources

Frequently asked questions

Who is the electricity network operator in Ashby-de-la-Zouch?

National Grid Electricity Distribution (East Midlands licence area). Most commercial solar systems need its G99 approval before they are switched on. The operator follows the postcode, so confirm yours with the Energy Networks Association postcode tool.

How much would a 100 kWp solar system generate in Ashby-de-la-Zouch?

About 97,500 kWh a year for a south-facing roof at 30 degrees, modelled with PVGIS for the town centre. At 70% used on site at 24p and the rest exported at 5p, that is worth about £17,843 a year. Your own roof, orientation and use will change this.

Can a business in Ashby-de-la-Zouch get a free solar survey?

Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. It is free, with no obligation. Get a free survey.

Free, with no obligation

See what your business could qualify for

Find out which grants, tax relief (capital allowances) and finance options your business may qualify for, and roughly what solar could save. It comes from a free call with us and a free survey with one MCS certified installer.

Tell us about the site in under two minutes. We review every enquiry, call you to understand the building and your electricity use, and if the site looks suitable we arrange a free survey with one MCS certified installer matched to it. We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

  • On site or by video callWhichever suits the project and its stage.
  • Roof, structure, grid and energy useThe four things that decide whether solar works.
  • A clear proposalSystem size, cost range, savings and payback for your board.
  • One installer onlyYour details are not passed around a list of companies.

Want the detail first? Read how a survey works and what the survey includes.

See what your business could qualify for

Grants, tax relief and finance your business may qualify for, and roughly what solar could save. Six quick questions.

  • PPA
  • Buy outright
  • Hire purchase
  • Local schemes
Question 1 of 10: What kind of survey would you like?

Tap one to start.

Question 2 of 10: Do you own the building, or is it leased?

Tap one to carry on.

Question 3 of 10: Is this your first time looking into solar?

Tap one to carry on.

Question 4 of 10: What kind of site is it?

Tap one to carry on.

Question 5 of 10: Roughly what do you spend on electricity a month?

Tap one to carry on.

Question 6 of 10: When are you hoping to go ahead?

Tap one to carry on.

Where's the site?

So we match you with an installer who covers your area.

Who should we ask for?

The person we'll speak to about the survey.

What's the best mobile for you?

We'll ring to talk through the site. UK mobiles only.

Last one. Where should we email you?

Your survey details go here.

Free site survey, no obligation.

See what you qualify for