Commercial solar installers in Burton upon Trent

Burton upon Trent is home to Centrum 100 and Burton Gateway. This page sets out the grid, planning and roof issues for a commercial solar project here, what a business roof could generate, and how to get a free site survey.

Key facts

Council area East Staffordshire
Population 76,270 (Census 2021 population of the Burton upon Trent built-up area (ONS 2022 built-up area boundaries))
Network operator National Grid Electricity Distribution (East Midlands)
Main employment areas Centrum 100; Burton Gateway
Indicative yield About 958 kWh per kWp a year (south facing, 30 degrees)
Nation support page Grants and reliefs in England

Where businesses are in Burton upon Trent

  • Centrum 100: Business park of distribution warehouses close to the A38 and A50, with occupiers including Boots, DHL, Clipper Logistics and Palletforce.
  • Burton Gateway: St. Modwen industrial and distribution park of about 1 million sq ft beside the A38 at the entrance to the town; Hellmann Worldwide Logistics took the first unit.

Large employers and sectors with sites here include:

  • Brewing: Molson Coors (formerly Coors Brewers, makers of Carling and Worthington) brews in the town, alongside Marston's and smaller breweries.
  • Food manufacturing: Marmite and Bovril, owned by Unilever, are made in the town.
  • Tyre manufacturing: Pirelli has a tyre plant in Burton; production paused for six days from 24 October 2025 citing market conditions.
  • Warehousing and distribution: Distribution centres for firms including B&Q, Boots, DHL, Amazon and Clipper.

Large, simple roofs on distribution sheds and modern industrial units are usually the quickest and cheapest to fit. Older mill, factory and workshop buildings can work well too, but often need a structural survey first, and roofs from before 2000 may contain asbestos cement: see asbestos roofs.

Grid connection

Burton upon Trent is served by National Grid Electricity Distribution (East Midlands). Almost every commercial system needs G99 approval from the network operator before it is switched on, and the question is usually how much the local network can take back. Where export is limited, a G100 export limitation scheme can let a larger array connect. See G99 and DNO applications.

Planning in Burton upon Trent

Burton upon Trent follows the national planning rules for England, decided by East Staffordshire council. Rooftop solar on most non-domestic buildings is permitted development, within height and edge limits, and systems above 50 kW need a prior approval application covering design and glare.

Points that come up locally:

  • The town centre sits in conservation areas, including King Edward Place and Burton No. 2 and 3 Town Centre.
  • Green belt (East Staffordshire and South Derbyshire) lies within about 4 km of the town centre.

Our guides on listed buildings and conservation areas, green belt explain what these mean for a solar project.

What a business roof in Burton upon Trent could generate

Modelled with PVGIS for the town centre, a south-facing roof at 30 degrees produces about 958 kWh per kWp a year.

Item Illustrative figure
System 100 kWp, south facing at 30 degrees
Installed cost £900 per kWp, so £90,000 excluding VAT
Generation About 95,800 kWh a year
Used on site 70% at 24p = £16,094 saved
Exported 30% at 5p = £1,437 earned
Total a year About £17,531
Simple payback About 5.1 years before tax relief

Illustrative, not a quote: the same sums as our commercial solar calculator. A company paying corporation tax can usually shorten the payback with capital allowances.

Funding and support

We found no council or regional grant for business solar open in Burton upon Trent at the time of writing (November 2026). National reliefs still apply, such as capital allowances and, in England, the business rates exemption for onsite renewables: see grants and reliefs in England.

Solar across East Staffordshire

At the end of 2025, East Staffordshire had 3,362 solar PV installations with 62.5 MW of capacity, up 18% since 2020, according to government figures. The East Staffordshire page has the full local figures and how they compare.

Nearby towns

Sources

Frequently asked questions

Who is the electricity network operator in Burton upon Trent?

National Grid Electricity Distribution (East Midlands). Most commercial solar systems need its G99 approval before they are switched on. The operator follows the postcode, so confirm yours with the Energy Networks Association postcode tool.

How much would a 100 kWp solar system generate in Burton upon Trent?

About 95,800 kWh a year for a south-facing roof at 30 degrees, modelled with PVGIS for the town centre. At 70% used on site at 24p and the rest exported at 5p, that is worth about £17,531 a year. Your own roof, orientation and use will change this.

Can a business in Burton upon Trent get a free solar survey?

Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. It is free, with no obligation. Get a free survey.

Free, with no obligation

See what your business could qualify for

Find out which grants, tax relief (capital allowances) and finance options your business may qualify for, and roughly what solar could save. It comes from a free call with us and a free survey with one MCS certified installer.

Tell us about the site in under two minutes. We review every enquiry, call you to understand the building and your electricity use, and if the site looks suitable we arrange a free survey with one MCS certified installer matched to it. We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

  • On site or by video callWhichever suits the project and its stage.
  • Roof, structure, grid and energy useThe four things that decide whether solar works.
  • A clear proposalSystem size, cost range, savings and payback for your board.
  • One installer onlyYour details are not passed around a list of companies.

Want the detail first? Read how a survey works and what the survey includes.

See what your business could qualify for

Grants, tax relief and finance your business may qualify for, and roughly what solar could save. Six quick questions.

  • PPA
  • Buy outright
  • Hire purchase
  • Local schemes
Question 1 of 10: What kind of survey would you like?

Tap one to start.

Question 2 of 10: Do you own the building, or is it leased?

Tap one to carry on.

Question 3 of 10: Is this your first time looking into solar?

Tap one to carry on.

Question 4 of 10: What kind of site is it?

Tap one to carry on.

Question 5 of 10: Roughly what do you spend on electricity a month?

Tap one to carry on.

Question 6 of 10: When are you hoping to go ahead?

Tap one to carry on.

Where's the site?

So we match you with an installer who covers your area.

Who should we ask for?

The person we'll speak to about the survey.

What's the best mobile for you?

We'll ring to talk through the site. UK mobiles only.

Last one. Where should we email you?

Your survey details go here.

Free site survey, no obligation.

See what you qualify for