Skip to content
CommercialSolarSurveys.com

Commercial solar installers in Bargoed

Bargoed is home to Bowen Industrial Estate, Aberbargoed and St David's Industrial Estate, Pengam. This page sets out the grid, planning and roof issues for a commercial solar project here, what a business roof could generate, and how to get a free site survey.

Key facts

Council area Caerphilly
Population 8,035 (Bargod (Bargoed) built-up area, usual residents, Census 2021 (ONS))
Network operator National Grid Electricity Distribution (South Wales)
Main employment areas Bowen Industrial Estate, Aberbargoed; St David's Industrial Estate, Pengam
Indicative yield About 957 kWh per kWp a year (south facing, 30 degrees)
Nation support page Grants and reliefs in Wales

Where businesses are in Bargoed

  • Bowen Industrial Estate, Aberbargoed: Established industrial estate of about 11 hectares with a large factory complex to the north, modern industrial units to the south and St Margaret's Park Business Centre, a source of small offices, on the main road. Caerphilly Council's 2022 Employment Land Review called it largely fully let.
  • St David's Industrial Estate, Pengam: Fully occupied industrial estate of about 5.2 hectares just south of Bargoed, with some council-owned units and modern units occupied by Toolstation, Greggs and Screwfix, according to the council's 2022 Employment Land Review.

Large employers and sectors with sites here include:

  • Cold storage and logistics (Wild Water Group): Wild Water Group bought a 130,000 sq ft warehouse on a 12 acre site in Aberbargoed in 2018, saying it could bring up to 120 jobs. In February 2024 Aberbargoed was one of the group's eight cold storage facilities when it was bought by Delancey.
  • Manufacturing: Caerphilly County Borough Council's Employment Land Review found manufacturing was the borough's largest sector in 2019, with 12,000 jobs or 20.7% of employment, well above the Welsh average.

Large, simple roofs on distribution sheds and modern industrial units are usually the quickest and cheapest to fit. Older mill, factory and workshop buildings can work well too, but often need a structural survey first, and roofs from before 2000 may contain asbestos cement: see asbestos roofs.

Grid connection

Bargoed is served by National Grid Electricity Distribution (South Wales). Almost every commercial system needs G99 approval from the network operator before it is switched on, and the question is usually how much the local network can take back. Where export is limited, a G100 export limitation scheme can let a larger array connect. See G99 and DNO applications.

Planning in Bargoed

Planning in Bargoed is decided by Caerphilly council under the Welsh rules. Many non-domestic roofs are covered by Welsh permitted development, with conditions, but not within 3 km of an airport or aerodrome or on listed buildings.

Points that come up locally:

  • Welsh Government guidance says solar panels on non-domestic buildings can be permitted development if they project no more than 200mm from the roof (1 metre above a flat roof) and sit at least 1 metre from the roof edge; listed buildings need consent, and in conservation areas panels on principal or side elevations visible from the highway need planning consent.

Our guides on listed buildings and conservation areas explain what these mean for a solar project.

What a business roof in Bargoed could generate

Modelled with PVGIS for the town centre, a south-facing roof at 30 degrees produces about 957 kWh per kWp a year.

Item Illustrative figure
System 100 kWp, south facing at 30 degrees
Installed cost £900 per kWp, so £90,000 excluding VAT
Generation About 95,700 kWh a year
Used on site 70% at 24p = £16,078 saved
Exported 30% at 5p = £1,436 earned
Total a year About £17,513
Simple payback About 5.1 years before tax relief

Illustrative, not a quote: the same sums as our commercial solar calculator. A company paying corporation tax can usually shorten the payback with capital allowances.

Funding and support

  • Development Bank of Wales Green Business Loan Scheme: Loans of £1,000 to £1.5m at a discounted fixed interest rate (never below 3%) for energy efficiency and low carbon projects, with solar PV listed as a typical eligible project. Businesses must be based in Wales and have traded for at least two years with at least one set of filed accounts. A grant of up to 50% of the cost of a detailed energy audit, to a maximum of £10,000, is also offered. Check the scheme's own page for eligibility and closing dates.

National reliefs apply too: see grants and reliefs in Wales.

Solar across Caerphilly

At the end of 2025, Caerphilly had 4,974 solar PV installations with 72.3 MW of capacity, up 17% since 2020, according to government figures. The Caerphilly page has the full local figures and how they compare.

Nearby towns

Sources

Frequently asked questions

Who is the electricity network operator in Bargoed?

National Grid Electricity Distribution (South Wales). Most commercial solar systems need its G99 approval before they are switched on. The operator follows the postcode, so confirm yours with the Energy Networks Association postcode tool.

How much would a 100 kWp solar system generate in Bargoed?

About 95,700 kWh a year for a south-facing roof at 30 degrees, modelled with PVGIS for the town centre. At 70% used on site at 24p and the rest exported at 5p, that is worth about £17,513 a year. Your own roof, orientation and use will change this.

Can a business in Bargoed get a free solar survey?

Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. It is free, with no obligation. Get a free survey.

Free, with no obligation

See what your business could qualify for

Find out which grants, tax relief (capital allowances) and finance options your business may qualify for, and roughly what solar could save. It comes from a free call with us and a free survey with one MCS certified installer.

Tell us about the site in under two minutes. We review every enquiry, call you to understand the building and your electricity use, and if the site looks suitable we arrange a free survey with one MCS certified installer matched to it. We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

  • On site or by video callWhichever suits the project and its stage.
  • Roof, structure, grid and energy useThe four things that decide whether solar works.
  • A clear proposalSystem size, cost range, savings and payback for your board.
  • One installer onlyYour details are not passed around a list of companies.

Want the detail first? Read how a survey works and what the survey includes.

See what your business could qualify for

Grants, tax relief and finance your business may qualify for, and roughly what solar could save. Six quick questions.

  • PPA
  • Buy outright
  • Hire purchase
  • Local schemes
Question 1 of 10: What kind of survey would you like?

Tap one to start.

Question 2 of 10: Do you own the building, or is it leased?

Tap one to carry on.

Question 3 of 10: Is this your first time looking into solar?

Tap one to carry on.

Question 4 of 10: What kind of site is it?

Tap one to carry on.

Question 5 of 10: Roughly what do you spend on electricity a month?

Tap one to carry on.

Question 6 of 10: When are you hoping to go ahead?

Tap one to carry on.

Where's the site?

So we match you with an installer who covers your area.

Who should we ask for?

The person we'll speak to about the survey.

What's the best mobile for you?

We'll ring to talk through the site. UK mobiles only.

Last one. Where should we email you?

Your survey details go here.

Free site survey, no obligation.

See what you qualify for