Commercial solar installers in Merthyr Tydfil

Merthyr Tydfil is home to Goat Mill Road employment site and Merthyr Tydfil Industrial Park, Pentrebach. This page sets out the grid, planning and roof issues for a commercial solar project here, what a business roof could generate, and how to get a free site survey.

Key facts

Council area Merthyr Tydfil
Population 39,535 (Merthyr Tydfil built-up area, usual residents, Census 2021 (ONS))
Network operator National Grid Electricity Distribution (South Wales)
Main employment areas Goat Mill Road employment site; Merthyr Tydfil Industrial Park, Pentrebach
Indicative yield About 937 kWh per kWp a year (south facing, 30 degrees)
Nation support page Grants and reliefs in Wales

Where businesses are in Merthyr Tydfil

  • Goat Mill Road employment site: A 19 acre site undeveloped since remediation in the 1990s, which a Welsh Government and Merthyr Tydfil Council joint venture announced in October 2025 is being serviced into investment ready plots, with about 228,000 sq ft of industrial space to follow.
  • Merthyr Tydfil Industrial Park, Pentrebach: An industrial park in Pentrebach whose Pentrebach Enterprise Centre was listed on the Business Wales property database (in 2019) with office units of 90 to 650 sq ft and industrial units of 500 to 2,000 sq ft.

Large employers and sectors with sites here include:

  • Healthcare (Prince Charles Hospital): Cwm Taf Morgannwg University Health Board said in March 2026 that it had secured £42 million from the Welsh Government for the third and final phase of the refurbishment of Prince Charles Hospital in Merthyr Tydfil.
  • Meat processing (Kepak): Kepak's Merthyr Tydfil plant, described in June 2026 as Wales's largest meat processing plant, began a collective consultation that month over more than 80 possible job losses. In 2022 the site employed over 850 people.

Large, simple roofs on distribution sheds and modern industrial units are usually the quickest and cheapest to fit. Older mill, factory and workshop buildings can work well too, but often need a structural survey first, and roofs from before 2000 may contain asbestos cement: see asbestos roofs.

Grid connection

Merthyr Tydfil is served by National Grid Electricity Distribution (South Wales). Almost every commercial system needs G99 approval from the network operator before it is switched on, and the question is usually how much the local network can take back. Where export is limited, a G100 export limitation scheme can let a larger array connect. See G99 and DNO applications.

Planning in Merthyr Tydfil

Planning in Merthyr Tydfil is decided by Merthyr Tydfil council under the Welsh rules. Many non-domestic roofs are covered by Welsh permitted development, with conditions, but not within 3 km of an airport or aerodrome or on listed buildings.

Points that come up locally:

  • Merthyr Tydfil has eight conservation areas, including the Town Centre Conservation Area along the High Street from St Tydfil's Church to Pontmorlais, Cyfarthfa Park and Dowlais, so check whether a building is inside one before planning roof panels.
  • Article 4 Directions remove some permitted development rights in the Pontmorlais Quarter of the Town Centre Conservation Area and at named addresses in the Thomastown Conservation Area.

Our guides on listed buildings and conservation areas explain what these mean for a solar project.

What a business roof in Merthyr Tydfil could generate

Modelled with PVGIS for the town centre, a south-facing roof at 30 degrees produces about 937 kWh per kWp a year.

Item Illustrative figure
System 100 kWp, south facing at 30 degrees
Installed cost £900 per kWp, so £90,000 excluding VAT
Generation About 93,700 kWh a year
Used on site 70% at 24p = £15,742 saved
Exported 30% at 5p = £1,406 earned
Total a year About £17,147
Simple payback About 5.2 years before tax relief

Illustrative, not a quote: the same sums as our commercial solar calculator. A company paying corporation tax can usually shorten the payback with capital allowances.

Funding and support

  • Development Bank of Wales Green Business Loan Scheme: Discounted fixed interest rate loans for energy efficiency measures and low carbon projects, with renewables including solar PV listed as eligible projects. Limited companies, sole traders and partnerships must be based in Wales, have traded for at least two years and have at least one set of filed annual accounts. A grant of up to 50% of the cost of a detailed energy audit, to a maximum of £10,000 (£20,000 total costs), is also offered. Check the scheme's own page for eligibility and closing dates.

National reliefs apply too: see grants and reliefs in Wales.

Solar across Merthyr Tydfil

At the end of 2025, Merthyr Tydfil had 1,542 solar PV installations with 6.9 MW of capacity, up 156% since 2020, according to government figures. The Merthyr Tydfil page has the full local figures and how they compare.

Nearby towns

Sources

Frequently asked questions

Who is the electricity network operator in Merthyr Tydfil?

National Grid Electricity Distribution (South Wales). Most commercial solar systems need its G99 approval before they are switched on. The operator follows the postcode, so confirm yours with the Energy Networks Association postcode tool.

How much would a 100 kWp solar system generate in Merthyr Tydfil?

About 93,700 kWh a year for a south-facing roof at 30 degrees, modelled with PVGIS for the town centre. At 70% used on site at 24p and the rest exported at 5p, that is worth about £17,147 a year. Your own roof, orientation and use will change this.

Can a business in Merthyr Tydfil get a free solar survey?

Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. It is free, with no obligation. Get a free survey.

Free, with no obligation

See what your business could qualify for

Find out which grants, tax relief (capital allowances) and finance options your business may qualify for, and roughly what solar could save. It comes from a free call with us and a free survey with one MCS certified installer.

Tell us about the site in under two minutes. We review every enquiry, call you to understand the building and your electricity use, and if the site looks suitable we arrange a free survey with one MCS certified installer matched to it. We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

  • On site or by video callWhichever suits the project and its stage.
  • Roof, structure, grid and energy useThe four things that decide whether solar works.
  • A clear proposalSystem size, cost range, savings and payback for your board.
  • One installer onlyYour details are not passed around a list of companies.

Want the detail first? Read how a survey works and what the survey includes.

See what your business could qualify for

Grants, tax relief and finance your business may qualify for, and roughly what solar could save. Six quick questions.

  • PPA
  • Buy outright
  • Hire purchase
  • Local schemes
Question 1 of 10: What kind of survey would you like?

Tap one to start.

Question 2 of 10: Do you own the building, or is it leased?

Tap one to carry on.

Question 3 of 10: Is this your first time looking into solar?

Tap one to carry on.

Question 4 of 10: What kind of site is it?

Tap one to carry on.

Question 5 of 10: Roughly what do you spend on electricity a month?

Tap one to carry on.

Question 6 of 10: When are you hoping to go ahead?

Tap one to carry on.

Where's the site?

So we match you with an installer who covers your area.

Who should we ask for?

The person we'll speak to about the survey.

What's the best mobile for you?

We'll ring to talk through the site. UK mobiles only.

Last one. Where should we email you?

Your survey details go here.

Free site survey, no obligation.

See what you qualify for