Skip to content
CommercialSolarSurveys.com

Commercial solar installers in Barrow-in-Furness

Barrow-in-Furness is home to Waterfront Business Park and Park Road employment area (including County Park Industrial Estate). This page sets out the grid, planning and roof issues for a commercial solar project here, what a business roof could generate, and how to get a free site survey.

Key facts

Council area Westmorland and Furness
Population 55,255 (Barrow-in-Furness built-up area, usual residents, Census 2021 (ONS))
Network operator Electricity North West (North West licence area)
Main employment areas Waterfront Business Park; Park Road employment area (including County Park Industrial Estate)
Indicative yield About 1,002 kWh per kWp a year (south facing, 30 degrees)
Nation support page Grants and reliefs in England

Where businesses are in Barrow-in-Furness

  • Waterfront Business Park: Dockland business park allocated for employment in the Barrow Borough Local Plan, with 17.63 of its 18.5 hectares still to develop at 31 March 2025 (Harding Rise House has been built on part). BAE Systems opened its Resolution Building logistics warehouse on Dova Way there in October 2016.
  • Park Road employment area (including County Park Industrial Estate): Industrial corridor along Park Road. At 31 March 2025, 7 hectares east of Park Road had permission for eight employment units, and part of the land west of Robert McBride had permission for a 30MW hydrogen electrolyser.

Large employers and sectors with sites here include:

  • Submarine building (BAE Systems): BAE Systems said in July 2026 that £1bn had been invested in its Barrow submarines site and its workforce had grown from 11,000 to about 16,000 over four years, as it builds Dreadnought class submarines.
  • Offshore wind (Ørsted): Ørsted runs the 659 MW Walney Extension wind farm from its Barrow-in-Furness base, which supports more than 250 direct jobs; its wind capacity operated out of Barrow totals 1.5 GW.

Large, simple roofs on distribution sheds and modern industrial units are usually the quickest and cheapest to fit. Older mill, factory and workshop buildings can work well too, but often need a structural survey first, and roofs from before 2000 may contain asbestos cement: see asbestos roofs.

Grid connection

Barrow-in-Furness is served by Electricity North West (North West licence area). Almost every commercial system needs G99 approval from the network operator before it is switched on, and the question is usually how much the local network can take back. Where export is limited, a G100 export limitation scheme can let a larger array connect. See G99 and DNO applications.

Planning in Barrow-in-Furness

Barrow-in-Furness follows the national planning rules for England, decided by Westmorland and Furness council. Rooftop solar on most non-domestic buildings is permitted development, within height and edge limits, and systems above 50 kW need a prior approval application covering design and glare.

Points that come up locally:

  • Westmorland and Furness Council adopted a new appraisal and management plan for the Central Barrow Conservation Area on 21 April 2026 and redrew its boundary, adding Cavendish Street and Coronation Gardens and taking out units at Hindpool Retail Park and on Hindpool Road. Check the new boundary before planning roof panels in the centre.

Our guides on listed buildings and conservation areas explain what these mean for a solar project.

What a business roof in Barrow-in-Furness could generate

Modelled with PVGIS for the town centre, a south-facing roof at 30 degrees produces about 1,002 kWh per kWp a year.

Item Illustrative figure
System 100 kWp, south facing at 30 degrees
Installed cost £900 per kWp, so £90,000 excluding VAT
Generation About 100,200 kWh a year
Used on site 70% at 24p = £16,834 saved
Exported 30% at 5p = £1,503 earned
Total a year About £18,337
Simple payback About 4.9 years before tax relief

Illustrative, not a quote: the same sums as our commercial solar calculator. A company paying corporation tax can usually shorten the payback with capital allowances.

Funding and support

We found no council or regional grant for business solar open in Barrow-in-Furness at the time of writing (November 2026). National reliefs still apply, such as capital allowances and, in England, the business rates exemption for onsite renewables: see grants and reliefs in England.

Solar across Westmorland and Furness

At the end of 2025, Westmorland and Furness had 9,791 solar PV installations with 78.7 MW of capacity, up 72% since 2020, according to government figures. The Westmorland and Furness page has the full local figures and how they compare.

Nearby towns

Sources

Frequently asked questions

Who is the electricity network operator in Barrow-in-Furness?

Electricity North West (North West licence area). Most commercial solar systems need its G99 approval before they are switched on. The operator follows the postcode, so confirm yours with the Energy Networks Association postcode tool.

How much would a 100 kWp solar system generate in Barrow-in-Furness?

About 100,200 kWh a year for a south-facing roof at 30 degrees, modelled with PVGIS for the town centre. At 70% used on site at 24p and the rest exported at 5p, that is worth about £18,337 a year. Your own roof, orientation and use will change this.

Can a business in Barrow-in-Furness get a free solar survey?

Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. It is free, with no obligation. Get a free survey.

Free, with no obligation

See what your business could qualify for

Find out which grants, tax relief (capital allowances) and finance options your business may qualify for, and roughly what solar could save. It comes from a free call with us and a free survey with one MCS certified installer.

Tell us about the site in under two minutes. We review every enquiry, call you to understand the building and your electricity use, and if the site looks suitable we arrange a free survey with one MCS certified installer matched to it. We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

  • On site or by video callWhichever suits the project and its stage.
  • Roof, structure, grid and energy useThe four things that decide whether solar works.
  • A clear proposalSystem size, cost range, savings and payback for your board.
  • One installer onlyYour details are not passed around a list of companies.

Want the detail first? Read how a survey works and what the survey includes.

See what your business could qualify for

Grants, tax relief and finance your business may qualify for, and roughly what solar could save. Six quick questions.

  • PPA
  • Buy outright
  • Hire purchase
  • Local schemes
Question 1 of 10: What kind of survey would you like?

Tap one to start.

Question 2 of 10: Do you own the building, or is it leased?

Tap one to carry on.

Question 3 of 10: Is this your first time looking into solar?

Tap one to carry on.

Question 4 of 10: What kind of site is it?

Tap one to carry on.

Question 5 of 10: Roughly what do you spend on electricity a month?

Tap one to carry on.

Question 6 of 10: When are you hoping to go ahead?

Tap one to carry on.

Where's the site?

So we match you with an installer who covers your area.

Who should we ask for?

The person we'll speak to about the survey.

What's the best mobile for you?

We'll ring to talk through the site. UK mobiles only.

Last one. Where should we email you?

Your survey details go here.

Free site survey, no obligation.

See what you qualify for