Skip to content
CommercialSolarSurveys.com

Commercial solar panel installers in Basildon

Looking for commercial solar panel installers in Basildon? We match businesses here with one MCS certified installer for a free site survey, on site or by video call. Basildon is home to Cranes Farm Road (Cranes industrial area), Pipps Hill Industrial Estate and Burnt Mills.

Key facts

Council area Basildon
Population 115,955 (Basildon built-up area, usual residents, Census 2021 (ONS, rounded to the nearest 5))
Network operator UK Power Networks (Eastern Power Networks licence area)
Main employment areas Cranes Farm Road (Cranes industrial area); Pipps Hill Industrial Estate; Burnt Mills; Gardiners Lane
Indicative yield About 1,063 kWh per kWp a year (south facing, 30 degrees)
Nation support page Grants and reliefs in England

Where businesses are in Basildon

  • Cranes Farm Road (Cranes industrial area): An industrial area east of Pipps Hill, named after the former Cranes Farm. Cranes Farm Road is home to the CNH (New Holland) tractor plant.
  • Pipps Hill Industrial Estate: An industrial area just north of Gloucester Park and west of Cranes, where Argos opened a regional warehouse in the 1990s. A South Essex study lists Pipps Hill among Basildon's possible future employment sites.
  • Burnt Mills: One of Basildon's main industrial areas, on the Pitsea side of the town. The same South Essex study names Burnt Mills, with Pipps Hill, Ford Dunton, Gardiners Lane South and Terminus Drive, as places where employment land might be developed.
  • Gardiners Lane: Business area on the site of the former York International factory, where a data centre hosts the European matching engine of the Intercontinental Exchange.

Large employers and sectors with sites here include:

  • Tractor manufacturing (CNH, New Holland): New Holland's Basildon plant built its two millionth tractor in July 2024, in its 60th year of tractor production, and is CNH's Alternative Fuels Centre of Excellence, building methane and compressed natural gas powered models.
  • Defence electronics (Leonardo): Leonardo's Basildon site at Sigma House, Christopher Martin Road, is home to about 500 people designing and developing thermal imaging, radar and radio communications systems.

Large, simple roofs on distribution sheds and modern industrial units are usually the quickest and cheapest to fit. Older mill, factory and workshop buildings can work well too, but often need a structural survey first, and roofs from before 2000 may contain asbestos cement: see asbestos roofs.

Sector guides for Basildon sites

  • Warehouses and logistics: Distribution and warehouse units at Pipps Hill Industrial Estate usually have the large, simple roofs that suit solar best. See our warehouse and logistics solar guide for cost by roof size, how much roof each kWp needs and payback.

Grid connection

Basildon is served by UK Power Networks (Eastern Power Networks licence area). Almost every commercial system needs G99 approval from the network operator before it is switched on, and the question is usually how much the local network can take back. Where export is limited, a G100 export limitation scheme can let a larger array connect. See G99 and DNO applications.

Planning in Basildon

Basildon follows the national planning rules for England, decided by Basildon council. Rooftop solar on most non-domestic buildings is permitted development, within height and edge limits, and systems above 50 kW need a prior approval application covering design and glare.

Points that come up locally:

  • The Noak Bridge Conservation Area (about 23.4 hectares, designated in February 2000) sits just north of the Pipps Hill industrial area, so check whether a building is inside it before planning roof panels.

Our guides on listed buildings and conservation areas explain what these mean for a solar project.

What a business roof in Basildon could generate

Modelled with PVGIS for the town centre, a south-facing roof at 30 degrees produces about 1,063 kWh per kWp a year.

Item Illustrative figure
System 100 kWp, south facing at 30 degrees
Installed cost £900 per kWp, so £90,000 excluding VAT
Generation About 106,300 kWh a year
Used on site 70% at 24p = £17,858 saved
Exported 30% at 5p = £1,595 earned
Total a year About £19,453
Simple payback About 4.6 years before tax relief

Illustrative, not a quote: the same sums as our commercial solar calculator. A company paying corporation tax can usually shorten the payback with capital allowances.

Choosing a commercial solar installer in Basildon

Whichever commercial solar panel company, contractor or installer you talk to in Basildon, the checks that matter are the same:

  • Certification for the size of system. MCS covers solar PV systems up to 50 kWp. Above 50 kW there is no single certificate, so ask for references on systems of a similar size, a named designer and experience of G99 applications with UK Power Networks.
  • Insurance. Ask for current public liability and employers' liability certificates, not just a line in the quote.
  • A design based on your site. The quote should be built on your own half-hourly or bill data and a surveyed roof, and say what generation per kWp it assumes.
  • Maintenance after switch-on. Monitoring that someone actually watches, regular inspections and periodic electrical testing keep a system earning: see our maintenance guide.

Our guide to choosing a commercial solar installer shows how to compare quotes line by line, and how we check installers explains who we match Basildon sites with.

Funding and support

We found no council or regional grant for business solar open in Basildon at the time of writing (November 2026). National reliefs still apply, such as capital allowances and, in England, the business rates exemption for onsite renewables: see grants and reliefs in England.

Solar across Basildon

At the end of 2025, Basildon had 3,569 solar PV installations with 35.9 MW of capacity, up 191% since 2020, according to government figures. The Basildon page has the full local figures and how they compare.

Nearby towns

Sources

Frequently asked questions

Who is the electricity network operator in Basildon?

UK Power Networks (Eastern Power Networks licence area). Most commercial solar systems need its G99 approval before they are switched on. The operator follows the postcode, so confirm yours with the Energy Networks Association postcode tool.

How much would a 100 kWp solar system generate in Basildon?

About 106,300 kWh a year for a south-facing roof at 30 degrees, modelled with PVGIS for the town centre. At 70% used on site at 24p and the rest exported at 5p, that is worth about £19,453 a year. Your own roof, orientation and use will change this.

How do I choose a commercial solar installer in Basildon?

Check certification for the size of system (MCS covers systems up to 50 kWp; above that, ask for references on similar sized jobs and G99 experience with UK Power Networks), current insurance certificates, a design based on your own energy data and a plan for maintenance. Our guide to choosing an installer covers comparing quotes.

Can a business in Basildon get a free solar survey?

Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. It is free, with no obligation. Get a free survey.

Free, with no obligation

See what your business could qualify for

Find out which grants, tax relief (capital allowances) and finance options your business may qualify for, and roughly what solar could save. It comes from a free call with us and a free survey with one MCS certified installer.

Tell us about the site in under two minutes. We review every enquiry, call you to understand the building and your electricity use, and if the site looks suitable we arrange a free survey with one MCS certified installer matched to it. We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

  • On site or by video callWhichever suits the project and its stage.
  • Roof, structure, grid and energy useThe four things that decide whether solar works.
  • A clear proposalSystem size, cost range, savings and payback for your board.
  • One installer onlyYour details are not passed around a list of companies.

Want the detail first? Read how a survey works and what the survey includes.

See what your business could qualify for

Grants, tax relief and finance your business may qualify for, and roughly what solar could save. Six quick questions.

  • PPA
  • Buy outright
  • Hire purchase
  • Local schemes
Question 1 of 10: What kind of survey would you like?

Tap one to start.

Question 2 of 10: Do you own the building, or is it leased?

Tap one to carry on.

Question 3 of 10: Is this your first time looking into solar?

Tap one to carry on.

Question 4 of 10: What kind of site is it?

Tap one to carry on.

Question 5 of 10: Roughly what do you spend on electricity a month?

Tap one to carry on.

Question 6 of 10: When are you hoping to go ahead?

Tap one to carry on.

Where's the site?

So we match you with an installer who covers your area.

Who should we ask for?

The person we'll speak to about the survey.

What's the best mobile for you?

We'll ring to talk through the site. UK mobiles only.

Last one. Where should we email you?

Your survey details go here.

Free site survey, no obligation.

See what you qualify for