Commercial solar installers in Beverley

Beverley is home to Grovehill Industrial Estate (Capital Park) and Beverley Enterprise Centre, Grovehill Road. This page sets out the grid, planning and roof issues for a commercial solar project here, what a business roof could generate, and how to get a free site survey.

Key facts

Council area East Riding of Yorkshire
Population 30,930 (Beverley built-up area, usual residents, Census 2021 (ONS))
Network operator Northern Powergrid (Yorkshire licence area)
Main employment areas Grovehill Industrial Estate (Capital Park); Beverley Enterprise Centre, Grovehill Road
Indicative yield About 995 kWh per kWp a year (south facing, 30 degrees)
Nation support page Grants and reliefs in England

Where businesses are in Beverley

  • Grovehill Industrial Estate (Capital Park): Beverley's industrial estate on Annie Reed Road, where Brooklands Property Holdings built Capital Park, a £10m, 80,000 sq ft speculative scheme of hybrid units from 1,333 to 50,000 sq ft. Euro Car Parts took a ten year lease there.
  • Beverley Enterprise Centre, Grovehill Road: A £4.8 million business centre part-funded by East Riding of Yorkshire Council, with 14 ground floor workshops and 17 first floor offices for small firms; construction started in 2021.

Large employers and sectors with sites here include:

  • Financial services (Beverley Building Society): Founded in 1866, the society is based in Beverley with its only branch on Saturday Market, is the only independent building society in the East Riding and had total assets of £206 million at December 2023.
  • Horseracing (Beverley Racecourse): The racecourse's 2027 programme runs from a season opener on 14 April to a season finale on 21 September, including the Beverley Bullet on 29 August, and the course also hosts Christmas party nights.
  • Land-based education (Bishop Burton College): In 2022 the specialist land-based college near Beverley said it was set in 890 acres of mixed farmland and countryside, teaching subjects such as equine, animal and environmental studies.

Large, simple roofs on distribution sheds and modern industrial units are usually the quickest and cheapest to fit. Older mill, factory and workshop buildings can work well too, but often need a structural survey first, and roofs from before 2000 may contain asbestos cement: see asbestos roofs.

Grid connection

Beverley is served by Northern Powergrid (Yorkshire licence area). Almost every commercial system needs G99 approval from the network operator before it is switched on, and the question is usually how much the local network can take back. Where export is limited, a G100 export limitation scheme can let a larger array connect. See G99 and DNO applications.

Planning in Beverley

Beverley follows the national planning rules for England, decided by East Riding of Yorkshire council. Rooftop solar on most non-domestic buildings is permitted development, within height and edge limits, and systems above 50 kW need a prior approval application covering design and glare.

Points that come up locally:

  • The Beverley Conservation Area, designated in 1969, covers about 109.6 hectares and holds 441 listed buildings, eight of them Grade I, including the North Bar, so roofs across the historic centre need more care.

Our guides on listed buildings and conservation areas explain what these mean for a solar project.

What a business roof in Beverley could generate

Modelled with PVGIS for the town centre, a south-facing roof at 30 degrees produces about 995 kWh per kWp a year.

Item Illustrative figure
System 100 kWp, south facing at 30 degrees
Installed cost £900 per kWp, so £90,000 excluding VAT
Generation About 99,500 kWh a year
Used on site 70% at 24p = £16,716 saved
Exported 30% at 5p = £1,493 earned
Total a year About £18,209
Simple payback About 4.9 years before tax relief

Illustrative, not a quote: the same sums as our commercial solar calculator. A company paying corporation tax can usually shorten the payback with capital allowances.

Funding and support

We found no council or regional grant for business solar open in Beverley at the time of writing (November 2026). National reliefs still apply, such as capital allowances and, in England, the business rates exemption for onsite renewables: see grants and reliefs in England.

Solar across East Riding of Yorkshire

At the end of 2025, East Riding of Yorkshire had 12,659 solar PV installations with 225.8 MW of capacity, up 261% since 2020, according to government figures. The East Riding of Yorkshire page has the full local figures and how they compare.

Nearby towns

Sources

Frequently asked questions

Who is the electricity network operator in Beverley?

Northern Powergrid (Yorkshire licence area). Most commercial solar systems need its G99 approval before they are switched on. The operator follows the postcode, so confirm yours with the Energy Networks Association postcode tool.

How much would a 100 kWp solar system generate in Beverley?

About 99,500 kWh a year for a south-facing roof at 30 degrees, modelled with PVGIS for the town centre. At 70% used on site at 24p and the rest exported at 5p, that is worth about £18,209 a year. Your own roof, orientation and use will change this.

Can a business in Beverley get a free solar survey?

Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. It is free, with no obligation. Get a free survey.

Free, with no obligation

See what your business could qualify for

Find out which grants, tax relief (capital allowances) and finance options your business may qualify for, and roughly what solar could save. It comes from a free call with us and a free survey with one MCS certified installer.

Tell us about the site in under two minutes. We review every enquiry, call you to understand the building and your electricity use, and if the site looks suitable we arrange a free survey with one MCS certified installer matched to it. We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

  • On site or by video callWhichever suits the project and its stage.
  • Roof, structure, grid and energy useThe four things that decide whether solar works.
  • A clear proposalSystem size, cost range, savings and payback for your board.
  • One installer onlyYour details are not passed around a list of companies.

Want the detail first? Read how a survey works and what the survey includes.

See what your business could qualify for

Grants, tax relief and finance your business may qualify for, and roughly what solar could save. Six quick questions.

  • PPA
  • Buy outright
  • Hire purchase
  • Local schemes
Question 1 of 10: What kind of survey would you like?

Tap one to start.

Question 2 of 10: Do you own the building, or is it leased?

Tap one to carry on.

Question 3 of 10: Is this your first time looking into solar?

Tap one to carry on.

Question 4 of 10: What kind of site is it?

Tap one to carry on.

Question 5 of 10: Roughly what do you spend on electricity a month?

Tap one to carry on.

Question 6 of 10: When are you hoping to go ahead?

Tap one to carry on.

Where's the site?

So we match you with an installer who covers your area.

Who should we ask for?

The person we'll speak to about the survey.

What's the best mobile for you?

We'll ring to talk through the site. UK mobiles only.

Last one. Where should we email you?

Your survey details go here.

Free site survey, no obligation.

See what you qualify for