Skip to content
CommercialSolarSurveys.com

Commercial solar installers in Grimsby

Grimsby is home to Europarc, Port of Grimsby and Grimsby Future Park. This page sets out the grid, planning and roof issues for a commercial solar project here, what a business roof could generate, and how to get a free site survey.

Key facts

Council area North East Lincolnshire
Population 85,911 (Grimsby built-up area, Census 2021 (ONS 2022 built-up area boundaries))
Network operator Northern Powergrid (Yorkshire)
Main employment areas Europarc; Port of Grimsby; Grimsby Future Park; Moody Lane / Energy Park Way
Enterprise or investment zone Humber Enterprise Zone (North East Lincolnshire sites: 189 hectares across 6 sites)
Indicative yield About 993 kWh per kWp a year (south facing, 30 degrees)
Nation support page Grants and reliefs in England

Where businesses are in Grimsby

  • Europarc: Grimsby's flagship business park and Food Enterprise Zone at the heart of the UK's biggest seafood cluster, home to the Humber Seafood Institute; Europarc III has plots of 1 to 17 acres.
  • Port of Grimsby: Working docks that host the offshore wind operations and maintenance cluster (Ørsted, E.ON, RWE, Siemens Gamesa, RES) and the Grimsby Seafood Village of 21 processing units.
  • Grimsby Future Park: 89 acre development site suited to port-centric manufacturing, logistics and low-carbon energy production.
  • Moody Lane / Energy Park Way: 89 acre level greenfield employment site with private HV power, a water abstraction licence and on-site effluent treatment.

Large employers and sectors with sites here include:

  • Food and seafood processing: about 500 food-related firms, including Young's Seafood (headquartered in Grimsby with three local production sites), Hain Daniels and New England Seafood.
  • Offshore wind operations and maintenance at the Port of Grimsby, serving the Hornsea 1 and 2 wind farms.

Large, simple roofs on distribution sheds and modern industrial units are usually the quickest and cheapest to fit. Older mill, factory and workshop buildings can work well too, but often need a structural survey first, and roofs from before 2000 may contain asbestos cement: see asbestos roofs.

Enterprise, investment and freeport zones

  • Humber Enterprise Zone (North East Lincolnshire sites: 189 hectares across 6 sites)

These zones can bring business rates relief or enhanced capital allowances for eligible firms on qualifying sites; check the current terms with the zone before relying on them.

Grid connection

Grimsby is served by Northern Powergrid (Yorkshire). Almost every commercial system needs G99 approval from the network operator before it is switched on, and the question is usually how much the local network can take back. Where export is limited, a G100 export limitation scheme can let a larger array connect. See G99 and DNO applications.

Planning in Grimsby

Grimsby follows the national planning rules for England, decided by North East Lincolnshire council. Rooftop solar on most non-domestic buildings is permitted development, within height and edge limits, and systems above 50 kW need a prior approval application covering design and glare.

Points that come up locally:

  • The Central Grimsby conservation area covers the town centre.
  • Lincolnshire Wolds National Landscape lies within about 10 km of the town.
  • Humberside Airport is under 30 minutes' drive from Grimsby, so large arrays nearby may need a glint and glare check.

Our guides on listed buildings and conservation areas, national parks and National Landscapes, airports, glint and glare explain what these mean for a solar project.

What a business roof in Grimsby could generate

Modelled with PVGIS for the town centre, a south-facing roof at 30 degrees produces about 993 kWh per kWp a year.

Item Illustrative figure
System 100 kWp, south facing at 30 degrees
Installed cost £900 per kWp, so £90,000 excluding VAT
Generation About 99,300 kWh a year
Used on site 70% at 24p = £16,682 saved
Exported 30% at 5p = £1,490 earned
Total a year About £18,172
Simple payback About 5.0 years before tax relief

Illustrative, not a quote: the same sums as our commercial solar calculator. A company paying corporation tax can usually shorten the payback with capital allowances.

Funding and support

We found no council or regional grant for business solar open in Grimsby at the time of writing (November 2026). National reliefs still apply, such as capital allowances and, in England, the business rates exemption for onsite renewables: see grants and reliefs in England.

Solar across North East Lincolnshire

At the end of 2025, North East Lincolnshire had 3,849 solar PV installations with 62.9 MW of capacity, up 94% since 2020, according to government figures. The North East Lincolnshire page has the full local figures and how they compare.

Nearby towns

Sources

Frequently asked questions

Who is the electricity network operator in Grimsby?

Northern Powergrid (Yorkshire). Most commercial solar systems need its G99 approval before they are switched on. The operator follows the postcode, so confirm yours with the Energy Networks Association postcode tool.

How much would a 100 kWp solar system generate in Grimsby?

About 99,300 kWh a year for a south-facing roof at 30 degrees, modelled with PVGIS for the town centre. At 70% used on site at 24p and the rest exported at 5p, that is worth about £18,172 a year. Your own roof, orientation and use will change this.

Can a business in Grimsby get a free solar survey?

Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. It is free, with no obligation. Get a free survey.

Free, with no obligation

See what your business could qualify for

Find out which grants, tax relief (capital allowances) and finance options your business may qualify for, and roughly what solar could save. It comes from a free call with us and a free survey with one MCS certified installer.

Tell us about the site in under two minutes. We review every enquiry, call you to understand the building and your electricity use, and if the site looks suitable we arrange a free survey with one MCS certified installer matched to it. We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

  • On site or by video callWhichever suits the project and its stage.
  • Roof, structure, grid and energy useThe four things that decide whether solar works.
  • A clear proposalSystem size, cost range, savings and payback for your board.
  • One installer onlyYour details are not passed around a list of companies.

Want the detail first? Read how a survey works and what the survey includes.

See what your business could qualify for

Grants, tax relief and finance your business may qualify for, and roughly what solar could save. Six quick questions.

  • PPA
  • Buy outright
  • Hire purchase
  • Local schemes
Question 1 of 10: What kind of survey would you like?

Tap one to start.

Question 2 of 10: Do you own the building, or is it leased?

Tap one to carry on.

Question 3 of 10: Is this your first time looking into solar?

Tap one to carry on.

Question 4 of 10: What kind of site is it?

Tap one to carry on.

Question 5 of 10: Roughly what do you spend on electricity a month?

Tap one to carry on.

Question 6 of 10: When are you hoping to go ahead?

Tap one to carry on.

Where's the site?

So we match you with an installer who covers your area.

Who should we ask for?

The person we'll speak to about the survey.

What's the best mobile for you?

We'll ring to talk through the site. UK mobiles only.

Last one. Where should we email you?

Your survey details go here.

Free site survey, no obligation.

See what you qualify for