Skip to content
CommercialSolarSurveys.com

Commercial solar installers in Chippenham

Chippenham is home to Bumpers Farm Industrial Estate, Methuen Park and St Modwen Park Chippenham. This page sets out the grid, planning and roof issues for a commercial solar project here, what a business roof could generate, and how to get a free site survey.

Key facts

Council area Wiltshire
Population 36,090 (Chippenham (Wiltshire) built-up area, usual residents, Census 2021 (ONS))
Network operator SSEN Distribution (Southern Electric Power Distribution licence area)
Main employment areas Bumpers Farm Industrial Estate; Methuen Park; St Modwen Park Chippenham; Southpoint Business Park
Indicative yield About 1,008 kWh per kWp a year (south facing, 30 degrees)
Nation support page Grants and reliefs in England

Where businesses are in Chippenham

  • Bumpers Farm Industrial Estate: Chippenham's main industrial estate, which Wiltshire Council's 2023 plan document said should stay a Principal Employment Site. Logicor's Westpoint Business Park on Vincents Road, with 12 industrial units, sits within it near occupiers such as Howdens, Wickes and Royal Mail.
  • Methuen Park: Business park named by Wiltshire Council as one of Chippenham's Principal Employment Sites. The council's July 2023 plan document recorded eight small units being built there, all sold off plan, and a retail park on the site with Next, TK Maxx and B&M.
  • St Modwen Park Chippenham: A 32 hectare development north of the town at M4 Junction 17, which Wiltshire Council's July 2023 plan document said was coming forward for large units of up to 74,000 square metres.
  • Southpoint Business Park: An 18 hectare business park south of the town at Showell Farm, aimed at larger business units. Siemens Mobility broke ground on its £100 million rail signalling factory and research centre there in April 2025.

Large employers and sectors with sites here include:

  • Rail signalling (Siemens Mobility): Siemens Mobility's Chippenham factory makes conventional and digital rail signalling and control systems, with 50% to 60% of its output going to UK projects. Its new £100 million site at Southpoint Business Park, started in April 2025, is due to open in 2026 for around 800 staff.
  • Manufacturing, pharmaceuticals and IT: Wiltshire Council's July 2023 plan document said Chippenham was home to a number of the county's larger employers in manufacturing, pharmaceuticals and IT, concentrated at Langley Park, Bumpers Farm and Methuen Park, with virtually full occupancy of business premises. It named Wavin's factory expansion and the take-up of former Herman Miller buildings by Bechtle and Wincanton among recent investments.

Large, simple roofs on distribution sheds and modern industrial units are usually the quickest and cheapest to fit. Older mill, factory and workshop buildings can work well too, but often need a structural survey first, and roofs from before 2000 may contain asbestos cement: see asbestos roofs.

Grid connection

Chippenham is served by SSEN Distribution (Southern Electric Power Distribution licence area). Almost every commercial system needs G99 approval from the network operator before it is switched on, and the question is usually how much the local network can take back. Where export is limited, a G100 export limitation scheme can let a larger array connect. See G99 and DNO applications.

Planning in Chippenham

Chippenham follows the national planning rules for England, decided by Wiltshire council. Rooftop solar on most non-domestic buildings is permitted development, within height and edge limits, and systems above 50 kW need a prior approval application covering design and glare.

Points that come up locally:

  • Wiltshire Council's 2023 plan document warns that grid supply points across Wiltshire are constrained and that Chippenham's energy infrastructure would struggle with new demand, advising early talks with SSEN about connections, so check export capacity before sizing a larger roof system.
  • The Chippenham Conservation Area, designated in 1973, covers about 109.3 hectares with around 230 listed buildings, so check whether a building is inside it before planning roof panels in the centre.

Our guides on listed buildings and conservation areas explain what these mean for a solar project.

What a business roof in Chippenham could generate

Modelled with PVGIS for the town centre, a south-facing roof at 30 degrees produces about 1,008 kWh per kWp a year.

Item Illustrative figure
System 100 kWp, south facing at 30 degrees
Installed cost £900 per kWp, so £90,000 excluding VAT
Generation About 100,800 kWh a year
Used on site 70% at 24p = £16,934 saved
Exported 30% at 5p = £1,512 earned
Total a year About £18,446
Simple payback About 4.9 years before tax relief

Illustrative, not a quote: the same sums as our commercial solar calculator. A company paying corporation tax can usually shorten the payback with capital allowances.

Funding and support

We found no council or regional grant for business solar open in Chippenham at the time of writing (November 2026). National reliefs still apply, such as capital allowances and, in England, the business rates exemption for onsite renewables: see grants and reliefs in England.

Solar across Wiltshire

At the end of 2025, Wiltshire had 22,287 solar PV installations with 621.3 MW of capacity, up 14% since 2020, according to government figures. The Wiltshire page has the full local figures and how they compare.

Nearby towns

Sources

Frequently asked questions

Who is the electricity network operator in Chippenham?

SSEN Distribution (Southern Electric Power Distribution licence area). Most commercial solar systems need its G99 approval before they are switched on. The operator follows the postcode, so confirm yours with the Energy Networks Association postcode tool.

How much would a 100 kWp solar system generate in Chippenham?

About 100,800 kWh a year for a south-facing roof at 30 degrees, modelled with PVGIS for the town centre. At 70% used on site at 24p and the rest exported at 5p, that is worth about £18,446 a year. Your own roof, orientation and use will change this.

Can a business in Chippenham get a free solar survey?

Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. It is free, with no obligation. Get a free survey.

Free, with no obligation

See what your business could qualify for

Find out which grants, tax relief (capital allowances) and finance options your business may qualify for, and roughly what solar could save. It comes from a free call with us and a free survey with one MCS certified installer.

Tell us about the site in under two minutes. We review every enquiry, call you to understand the building and your electricity use, and if the site looks suitable we arrange a free survey with one MCS certified installer matched to it. We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

  • On site or by video callWhichever suits the project and its stage.
  • Roof, structure, grid and energy useThe four things that decide whether solar works.
  • A clear proposalSystem size, cost range, savings and payback for your board.
  • One installer onlyYour details are not passed around a list of companies.

Want the detail first? Read how a survey works and what the survey includes.

See what your business could qualify for

Grants, tax relief and finance your business may qualify for, and roughly what solar could save. Six quick questions.

  • PPA
  • Buy outright
  • Hire purchase
  • Local schemes
Question 1 of 10: What kind of survey would you like?

Tap one to start.

Question 2 of 10: Do you own the building, or is it leased?

Tap one to carry on.

Question 3 of 10: Is this your first time looking into solar?

Tap one to carry on.

Question 4 of 10: What kind of site is it?

Tap one to carry on.

Question 5 of 10: Roughly what do you spend on electricity a month?

Tap one to carry on.

Question 6 of 10: When are you hoping to go ahead?

Tap one to carry on.

Where's the site?

So we match you with an installer who covers your area.

Who should we ask for?

The person we'll speak to about the survey.

What's the best mobile for you?

We'll ring to talk through the site. UK mobiles only.

Last one. Where should we email you?

Your survey details go here.

Free site survey, no obligation.

See what you qualify for