Trowbridge is home to Canal Road Industrial Estate and White Horse Business Park. This page sets out the grid, planning and roof issues for a commercial solar project here, what a business roof could generate, and how to get a free site survey.

Key facts

Council area Wiltshire
Population 43,750 (Trowbridge built-up area, usual residents, Census 2021 (ONS))
Network operator SSEN Distribution (Southern Electric Power Distribution licence area)
Main employment areas Canal Road Industrial Estate; White Horse Business Park
Indicative yield About 1,024 kWh per kWp a year (south facing, 30 degrees)
Nation support page Grants and reliefs in England

Where businesses are in Trowbridge

  • Canal Road Industrial Estate: Industrial estate in Trowbridge. In April 2026 Wiltshire Council approved apetito's £100 million Kitchen West food production plant on the estate, with six production lines planned.
  • White Horse Business Park: Business park in Trowbridge where Nutricia Limited, trading as Danone UK, has its registered office on Newmarket Avenue.

Large employers and sectors with sites here include:

  • Food manufacturing (apetito): Wiltshire Council says apetito is the largest private employer in Trowbridge, with around 670 of its 2,000 UK staff in the town, making meals for hospitals, care homes and Wiltshire Farm Foods. Its new Kitchen West plant is expected to secure about 700 existing jobs and create new ones.
  • Office furniture distribution (Herman Miller): In November 2022 Herman Miller took an eight-year lease on The Consortium, a 92,510 sq ft warehouse on nearly six acres at Canal Road Industrial Estate, to distribute office furniture across the UK, Europe, the Middle East and Africa.

Large, simple roofs on distribution sheds and modern industrial units are usually the quickest and cheapest to fit. Older mill, factory and workshop buildings can work well too, but often need a structural survey first, and roofs from before 2000 may contain asbestos cement: see asbestos roofs.

Grid connection

Trowbridge is served by SSEN Distribution (Southern Electric Power Distribution licence area). Almost every commercial system needs G99 approval from the network operator before it is switched on, and the question is usually how much the local network can take back. Where export is limited, a G100 export limitation scheme can let a larger array connect. See G99 and DNO applications.

Planning in Trowbridge

Trowbridge follows the national planning rules for England, decided by Wiltshire council. Rooftop solar on most non-domestic buildings is permitted development, within height and edge limits, and systems above 50 kW need a prior approval application covering design and glare.

Points that come up locally:

  • Trowbridge Conservation Area, designated in 1975, covers about 41.1 hectares of the town centre and holds 224 listed buildings, including six Grade I buildings such as the Parish Church of St James and Lovemead House, so roofs inside it need more care.
  • Wiltshire Council's Planning for Trowbridge guide says the town is adjacent to the Western Wiltshire Green Belt to the west, which matters most for ground-mounted arrays on sites on that side of town.

Our guides on listed buildings and conservation areas, green belt explain what these mean for a solar project.

What a business roof in Trowbridge could generate

Modelled with PVGIS for the town centre, a south-facing roof at 30 degrees produces about 1,024 kWh per kWp a year.

Item Illustrative figure
System 100 kWp, south facing at 30 degrees
Installed cost £900 per kWp, so £90,000 excluding VAT
Generation About 102,400 kWh a year
Used on site 70% at 24p = £17,203 saved
Exported 30% at 5p = £1,536 earned
Total a year About £18,739
Simple payback About 4.8 years before tax relief

Illustrative, not a quote: the same sums as our commercial solar calculator. A company paying corporation tax can usually shorten the payback with capital allowances.

Funding and support

We found no council or regional grant for business solar open in Trowbridge at the time of writing (November 2026). National reliefs still apply, such as capital allowances and, in England, the business rates exemption for onsite renewables: see grants and reliefs in England.

Solar across Wiltshire

At the end of 2025, Wiltshire had 22,287 solar PV installations with 621.3 MW of capacity, up 14% since 2020, according to government figures. The Wiltshire page has the full local figures and how they compare.

Nearby towns

Sources

Frequently asked questions

Who is the electricity network operator in Trowbridge?

SSEN Distribution (Southern Electric Power Distribution licence area). Most commercial solar systems need its G99 approval before they are switched on. The operator follows the postcode, so confirm yours with the Energy Networks Association postcode tool.

How much would a 100 kWp solar system generate in Trowbridge?

About 102,400 kWh a year for a south-facing roof at 30 degrees, modelled with PVGIS for the town centre. At 70% used on site at 24p and the rest exported at 5p, that is worth about £18,739 a year. Your own roof, orientation and use will change this.

Can a business in Trowbridge get a free solar survey?

Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. It is free, with no obligation. Get a free survey.

Free, with no obligation

See what your business could qualify for

Find out which grants, tax relief (capital allowances) and finance options your business may qualify for, and roughly what solar could save. It comes from a free call with us and a free survey with one MCS certified installer.

Tell us about the site in under two minutes. We review every enquiry, call you to understand the building and your electricity use, and if the site looks suitable we arrange a free survey with one MCS certified installer matched to it. We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

  • On site or by video callWhichever suits the project and its stage.
  • Roof, structure, grid and energy useThe four things that decide whether solar works.
  • A clear proposalSystem size, cost range, savings and payback for your board.
  • One installer onlyYour details are not passed around a list of companies.

Want the detail first? Read how a survey works and what the survey includes.

See what your business could qualify for

Grants, tax relief and finance your business may qualify for, and roughly what solar could save. Six quick questions.

  • PPA
  • Buy outright
  • Hire purchase
  • Local schemes
Question 1 of 10: What kind of survey would you like?

Tap one to start.

Question 2 of 10: Do you own the building, or is it leased?

Tap one to carry on.

Question 3 of 10: Is this your first time looking into solar?

Tap one to carry on.

Question 4 of 10: What kind of site is it?

Tap one to carry on.

Question 5 of 10: Roughly what do you spend on electricity a month?

Tap one to carry on.

Question 6 of 10: When are you hoping to go ahead?

Tap one to carry on.

Where's the site?

So we match you with an installer who covers your area.

Who should we ask for?

The person we'll speak to about the survey.

What's the best mobile for you?

We'll ring to talk through the site. UK mobiles only.

Last one. Where should we email you?

Your survey details go here.

Free site survey, no obligation.

See what you qualify for