Key facts
| Council area | Crawley |
| Population | 120,550 (Crawley (Crawley) built-up area, usual residents, Census 2021 (ONS)) |
| Network operator | UK Power Networks (South Eastern Power Networks licence area) |
| Main employment areas | Manor Royal Business District; Gatwick Green |
| Indicative yield | About 1,030 kWh per kWp a year (south facing, 30 degrees) |
| Nation support page | Grants and reliefs in England |
Where businesses are in Crawley
- Manor Royal Business District: The biggest business park in the Gatwick Diamond, next to London Gatwick Airport, covering 540 acres with over 600 businesses and 30,000 jobs, and over 70% of Crawley's employment land. Occupiers range from aircraft simulation and geophysical exploration to printing, distribution and food production.
- Gatwick Green: A site where the council's Crawley Growth Deal 2025 to 2030, agreed with West Sussex County Council, aims to unlock new commercial space.
Large employers and sectors with sites here include:
- Aviation (London Gatwick): London Gatwick is one of Crawley's three key employment areas, and the council says the airport's expansion could bring up to £1 billion a year to the regional economy and create thousands of jobs.
- Transport, storage and corporate occupiers: Crawley's main employment sectors are transportation and storage and administrative and support services, and the borough's 3,400 active businesses include Virgin, Nestle, Elekta, Doosan, Siemens Healthineers and Thales.
Large, simple roofs on distribution sheds and modern industrial units are usually the quickest and cheapest to fit. Older mill, factory and workshop buildings can work well too, but often need a structural survey first, and roofs from before 2000 may contain asbestos cement: see asbestos roofs.
Grid connection
Crawley is served by UK Power Networks (South Eastern Power Networks licence area). Almost every commercial system needs G99 approval from the network operator before it is switched on, and the question is usually how much the local network can take back. Where export is limited, a G100 export limitation scheme can let a larger array connect. See G99 and DNO applications.
Planning in Crawley
Crawley follows the national planning rules for England, decided by Crawley council. Rooftop solar on most non-domestic buildings is permitted development, within height and edge limits, and systems above 50 kW need a prior approval application covering design and glare.
Points that come up locally:
- Crawley has 13 conservation areas, including Crawley High Street, Queens Square and The Broadway in the town centre, and Ifield Village, and the council says planning controls are tightened inside them.
Our guides on listed buildings and conservation areas explain what these mean for a solar project.
What a business roof in Crawley could generate
Modelled with PVGIS for the town centre, a south-facing roof at 30 degrees produces about 1,030 kWh per kWp a year.
| Item | Illustrative figure |
|---|---|
| System | 100 kWp, south facing at 30 degrees |
| Installed cost | £900 per kWp, so £90,000 excluding VAT |
| Generation | About 103,000 kWh a year |
| Used on site | 70% at 24p = £17,304 saved |
| Exported | 30% at 5p = £1,545 earned |
| Total a year | About £18,849 |
| Simple payback | About 4.8 years before tax relief |
Illustrative, not a quote: the same sums as our commercial solar calculator. A company paying corporation tax can usually shorten the payback with capital allowances.
Funding and support
We found no council or regional grant for business solar open in Crawley at the time of writing (November 2026). National reliefs still apply, such as capital allowances and, in England, the business rates exemption for onsite renewables: see grants and reliefs in England.
Solar across Crawley
At the end of 2025, Crawley had 2,264 solar PV installations with 11.1 MW of capacity, up 105% since 2020, according to government figures. The Crawley page has the full local figures and how they compare.
Nearby towns
- Horsham, about 7 miles away
- Tonbridge, about 21 miles away
- Hailsham, about 26 miles away
- Seaford, about 27 miles away
Sources
- ons.gov.uk: census2021
- ons.gov.uk: datadownload.xlsx
- en.wikipedia.org: Crawley
- manorroyal.org
- manorroyal.org: the place
- crawley.gov.uk: new crawley growth deal drive jobs investment and
- investcrawley.co.uk: economy crawley
- gov.uk: enterprise zones
- gov.uk: freeports
- gov.uk: investment zones in england
- crawley.gov.uk: conservation areas
- Yield: PVGIS 5.3 (European Commission Joint Research Centre), SARAH3 data, 14% system losses, for the town centre, modelled 4 November 2026.
- Council area figures: DESNZ, renewable electricity by local authority 2014 to 2025.
Frequently asked questions
Who is the electricity network operator in Crawley?
UK Power Networks (South Eastern Power Networks licence area). Most commercial solar systems need its G99 approval before they are switched on. The operator follows the postcode, so confirm yours with the Energy Networks Association postcode tool.
How much would a 100 kWp solar system generate in Crawley?
About 103,000 kWh a year for a south-facing roof at 30 degrees, modelled with PVGIS for the town centre. At 70% used on site at 24p and the rest exported at 5p, that is worth about £18,849 a year. Your own roof, orientation and use will change this.
Can a business in Crawley get a free solar survey?
Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. It is free, with no obligation. Get a free survey.
Related pages
- Crawley2,264 installations, 11.1 MW of solar and about 1,030 kWh per kWp a year for a south-facing roof.
- South EastTwo network operators, strong south coast yields, Kent horticulture, Thames Valley offices and Solent logistics, and the clean air zones that affect fleets.
- Commercial solar calculatorEstimate commercial solar savings and payback, with the generation, price and cost assumptions shown and sourced, and the limits of a simple estimate explained.
- EnglandCurrent solar support in England for businesses, schools, public bodies, community groups and farms, plus rates, planning and who to contact.
- Planning permissionPermitted development for commercial rooftop solar and car park canopies in England, prior approval, heritage limits, ground-mounted schemes and the other UK nations.