Commercial solar installers in Hailsham

Hailsham is home to Diplocks Way Industrial Estate, Station Road Industrial Estate and Swallow Enterprise Park, Lower Dicker. This page sets out the grid, planning and roof issues for a commercial solar project here, what a business roof could generate, and how to get a free site survey.

Key facts

Council area Wealden
Population 22,550 (Hailsham built-up area, usual residents, Census 2021 (ONS))
Network operator UK Power Networks (South Eastern Power Networks licence area)
Main employment areas Diplocks Way Industrial Estate; Station Road Industrial Estate; Swallow Enterprise Park, Lower Dicker
Indicative yield About 1,160 kWh per kWp a year (south facing, 30 degrees)
Nation support page Grants and reliefs in England

Where businesses are in Hailsham

  • Diplocks Way Industrial Estate: Wealden District Council lists the Diplocks Way business area as 24 hectares and one of the largest industrial estates in the district, with 199 units in a mix of buildings from the 1960s on Diplocks Way and Apex Way, about half a mile south west of the town centre between the A22 and South Road.
  • Station Road Industrial Estate: An estate of 52 units in buildings dating from the 1960s, about half a mile south east of the town centre and within 1.5 miles of the A22. The council says the majority of Hailsham's business activity is contained in Station Road.
  • Swallow Enterprise Park, Lower Dicker: Westcott Leach's park off the A22 at Golden Cross, 1.5 miles west of Hailsham, will total 304,000 sq ft when complete, with units of 1,575 to 35,000 sq ft. J2 Aerospace took a 12,261 sq ft unit in 2023 and EMED Group a 21,280 sq ft warehouse on a 10 year lease in 2025.

Large employers and sectors with sites here include:

  • Rope making (Marlow Ropes): Marlow Ropes, a privately owned British maker of specialist synthetic fibre ropes and assemblies, has its factory in Hailsham and supplies defence, leisure marine, tree work, working at height and industrial users, with distribution around the world.
  • Livestock market (South East Marts): In 2023 the NFU said Hailsham was the only remaining livestock market in East and West Sussex, and backed South East Marts' plan to move it from the town centre to a new site off the A22 at the Diplocks Way roundabout.

Large, simple roofs on distribution sheds and modern industrial units are usually the quickest and cheapest to fit. Older mill, factory and workshop buildings can work well too, but often need a structural survey first, and roofs from before 2000 may contain asbestos cement: see asbestos roofs.

Grid connection

Hailsham is served by UK Power Networks (South Eastern Power Networks licence area). Almost every commercial system needs G99 approval from the network operator before it is switched on, and the question is usually how much the local network can take back. Where export is limited, a G100 export limitation scheme can let a larger array connect. See G99 and DNO applications.

Planning in Hailsham

Hailsham follows the national planning rules for England, decided by Wealden council. Rooftop solar on most non-domestic buildings is permitted development, within height and edge limits, and systems above 50 kW need a prior approval application covering design and glare.

Points that come up locally:

  • Hailsham Conservation Area covers about 12.4 hectares of the town centre and holds 32 listed buildings, one of them Grade I and two Grade II*, so roofs in the centre need more care.

Our guides on listed buildings and conservation areas explain what these mean for a solar project.

What a business roof in Hailsham could generate

Modelled with PVGIS for the town centre, a south-facing roof at 30 degrees produces about 1,160 kWh per kWp a year.

Item Illustrative figure
System 100 kWp, south facing at 30 degrees
Installed cost £900 per kWp, so £90,000 excluding VAT
Generation About 116,000 kWh a year
Used on site 70% at 24p = £19,488 saved
Exported 30% at 5p = £1,740 earned
Total a year About £21,228
Simple payback About 4.2 years before tax relief

Illustrative, not a quote: the same sums as our commercial solar calculator. A company paying corporation tax can usually shorten the payback with capital allowances.

Funding and support

We found no council or regional grant for business solar open in Hailsham at the time of writing (November 2026). National reliefs still apply, such as capital allowances and, in England, the business rates exemption for onsite renewables: see grants and reliefs in England.

Solar across Wealden

At the end of 2025, Wealden had 7,606 solar PV installations with 100.3 MW of capacity, up 29% since 2020, according to government figures. The Wealden page has the full local figures and how they compare.

Nearby towns

Sources

Frequently asked questions

Who is the electricity network operator in Hailsham?

UK Power Networks (South Eastern Power Networks licence area). Most commercial solar systems need its G99 approval before they are switched on. The operator follows the postcode, so confirm yours with the Energy Networks Association postcode tool.

How much would a 100 kWp solar system generate in Hailsham?

About 116,000 kWh a year for a south-facing roof at 30 degrees, modelled with PVGIS for the town centre. At 70% used on site at 24p and the rest exported at 5p, that is worth about £21,228 a year. Your own roof, orientation and use will change this.

Can a business in Hailsham get a free solar survey?

Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. It is free, with no obligation. Get a free survey.

Free, with no obligation

See what your business could qualify for

Find out which grants, tax relief (capital allowances) and finance options your business may qualify for, and roughly what solar could save. It comes from a free call with us and a free survey with one MCS certified installer.

Tell us about the site in under two minutes. We review every enquiry, call you to understand the building and your electricity use, and if the site looks suitable we arrange a free survey with one MCS certified installer matched to it. We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

  • On site or by video callWhichever suits the project and its stage.
  • Roof, structure, grid and energy useThe four things that decide whether solar works.
  • A clear proposalSystem size, cost range, savings and payback for your board.
  • One installer onlyYour details are not passed around a list of companies.

Want the detail first? Read how a survey works and what the survey includes.

See what your business could qualify for

Grants, tax relief and finance your business may qualify for, and roughly what solar could save. Six quick questions.

  • PPA
  • Buy outright
  • Hire purchase
  • Local schemes
Question 1 of 10: What kind of survey would you like?

Tap one to start.

Question 2 of 10: Do you own the building, or is it leased?

Tap one to carry on.

Question 3 of 10: Is this your first time looking into solar?

Tap one to carry on.

Question 4 of 10: What kind of site is it?

Tap one to carry on.

Question 5 of 10: Roughly what do you spend on electricity a month?

Tap one to carry on.

Question 6 of 10: When are you hoping to go ahead?

Tap one to carry on.

Where's the site?

So we match you with an installer who covers your area.

Who should we ask for?

The person we'll speak to about the survey.

What's the best mobile for you?

We'll ring to talk through the site. UK mobiles only.

Last one. Where should we email you?

Your survey details go here.

Free site survey, no obligation.

See what you qualify for