Skip to content
CommercialSolarSurveys.com

Commercial solar installers in Crewe

Crewe is home to Crewe Business Park, Crewe Gates Industrial Estate and Basford West (Crewe Commercial Park). This page sets out the grid, planning and roof issues for a commercial solar project here, what a business roof could generate, and how to get a free site survey.

Key facts

Council area Cheshire East
Population 74,120 (Crewe built-up area, Census 2021 (ONS))
Network operator SP Energy Networks (SP Manweb)
Main employment areas Crewe Business Park; Crewe Gates Industrial Estate; Basford West (Crewe Commercial Park); Basford East (WestonM6)
Indicative yield About 943 kWh per kWp a year (south facing, 30 degrees)
Nation support page Grants and reliefs in England

Where businesses are in Crewe

  • Crewe Business Park: A 67 acre park of offices, research and IT manufacturing; occupiers have included Air Products, Barclays and Fujitsu.
  • Crewe Gates Industrial Estate: A 12 acre industrial estate next to the business park, part of a cluster with Crewe Green Business Park and the Weston Road industrial area; ice cream van maker Whitby Morrison is based here.
  • Basford West (Crewe Commercial Park): Strategic employment land south of Crewe beside the West Coast Main Line, with outline permission for more than 1m sq ft of mainly industrial, storage and distribution space.
  • Basford East (WestonM6): Muse's new business park on the Basford East allocation, approved in 2024, with about 785,000 sq ft across three employment units.

Large employers and sectors with sites here include:

  • Luxury car manufacturing (Bentley Motors): Bentley's Pyms Lane headquarters and factory employ around 4,000 people and carry about 10 MW of solar across a car park and ten roofs.
  • Rail engineering (Alstom Crewe Works): Alstom's Crewe Works overhauls bogies, wheels and traction motors and opened a new overhaul facility in late 2025.

Large, simple roofs on distribution sheds and modern industrial units are usually the quickest and cheapest to fit. Older mill, factory and workshop buildings can work well too, but often need a structural survey first, and roofs from before 2000 may contain asbestos cement: see asbestos roofs.

Grid connection

Crewe is served by SP Energy Networks (SP Manweb). Almost every commercial system needs G99 approval from the network operator before it is switched on, and the question is usually how much the local network can take back. Where export is limited, a G100 export limitation scheme can let a larger array connect. See G99 and DNO applications.

Planning in Crewe

Crewe follows the national planning rules for England, decided by Cheshire East council. Rooftop solar on most non-domestic buildings is permitted development, within height and edge limits, and systems above 50 kW need a prior approval application covering design and glare.

Points that come up locally:

  • Crewe has no Green Belt, but Cheshire East's Strategic Green Gaps keep open land between Crewe and Nantwich, Willaston, Shavington, Basford, Weston and Haslington, limiting development there.

Our guides on green belt explain what these mean for a solar project.

What a business roof in Crewe could generate

Modelled with PVGIS for the town centre, a south-facing roof at 30 degrees produces about 943 kWh per kWp a year.

Item Illustrative figure
System 100 kWp, south facing at 30 degrees
Installed cost £900 per kWp, so £90,000 excluding VAT
Generation About 94,300 kWh a year
Used on site 70% at 24p = £15,842 saved
Exported 30% at 5p = £1,415 earned
Total a year About £17,257
Simple payback About 5.2 years before tax relief

Illustrative, not a quote: the same sums as our commercial solar calculator. A company paying corporation tax can usually shorten the payback with capital allowances.

Funding and support

We found no council or regional grant for business solar open in Crewe at the time of writing (November 2026). National reliefs still apply, such as capital allowances and, in England, the business rates exemption for onsite renewables: see grants and reliefs in England.

Solar across Cheshire East

At the end of 2025, Cheshire East had 11,685 solar PV installations with 85.2 MW of capacity, up 65% since 2020, according to government figures. The Cheshire East page has the full local figures and how they compare.

Nearby towns

Sources

Frequently asked questions

Who is the electricity network operator in Crewe?

SP Energy Networks (SP Manweb). Most commercial solar systems need its G99 approval before they are switched on. The operator follows the postcode, so confirm yours with the Energy Networks Association postcode tool.

How much would a 100 kWp solar system generate in Crewe?

About 94,300 kWh a year for a south-facing roof at 30 degrees, modelled with PVGIS for the town centre. At 70% used on site at 24p and the rest exported at 5p, that is worth about £17,257 a year. Your own roof, orientation and use will change this.

Can a business in Crewe get a free solar survey?

Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. It is free, with no obligation. Get a free survey.

Free, with no obligation

See what your business could qualify for

Find out which grants, tax relief (capital allowances) and finance options your business may qualify for, and roughly what solar could save. It comes from a free call with us and a free survey with one MCS certified installer.

Tell us about the site in under two minutes. We review every enquiry, call you to understand the building and your electricity use, and if the site looks suitable we arrange a free survey with one MCS certified installer matched to it. We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

  • On site or by video callWhichever suits the project and its stage.
  • Roof, structure, grid and energy useThe four things that decide whether solar works.
  • A clear proposalSystem size, cost range, savings and payback for your board.
  • One installer onlyYour details are not passed around a list of companies.

Want the detail first? Read how a survey works and what the survey includes.

See what your business could qualify for

Grants, tax relief and finance your business may qualify for, and roughly what solar could save. Six quick questions.

  • PPA
  • Buy outright
  • Hire purchase
  • Local schemes
Question 1 of 10: What kind of survey would you like?

Tap one to start.

Question 2 of 10: Do you own the building, or is it leased?

Tap one to carry on.

Question 3 of 10: Is this your first time looking into solar?

Tap one to carry on.

Question 4 of 10: What kind of site is it?

Tap one to carry on.

Question 5 of 10: Roughly what do you spend on electricity a month?

Tap one to carry on.

Question 6 of 10: When are you hoping to go ahead?

Tap one to carry on.

Where's the site?

So we match you with an installer who covers your area.

Who should we ask for?

The person we'll speak to about the survey.

What's the best mobile for you?

We'll ring to talk through the site. UK mobiles only.

Last one. Where should we email you?

Your survey details go here.

Free site survey, no obligation.

See what you qualify for