Deeside is home to Deeside Industrial Park, Hawarden Business Park and Sandycroft Industrial Area. This page sets out the grid, planning and roof issues for a commercial solar project here, what a business roof could generate, and how to get a free site survey.

Key facts

Council area Flintshire
Population 16,762 (Connah's Quay built-up area, the largest settlement in Deeside, Census 2021. Shotton is a separate built-up area. No single 2021 figure covers the whole of Deeside.)
Network operator SP Energy Networks (SP Manweb: Merseyside, Cheshire and North Wales)
Main employment areas Deeside Industrial Park; Hawarden Business Park; Sandycroft Industrial Area; Warren Hall
Enterprise or investment zone Deeside Enterprise Zone (2,000 hectares)
Enterprise or investment zone Flintshire and Wrexham Investment Zone (Deeside and Warren Hall tax sites)
Indicative yield About 964 kWh per kWp a year (south facing, 30 degrees)
Nation support page Grants and reliefs in Wales

Where businesses are in Deeside

  • Deeside Industrial Park: Large manufacturing and logistics park in the Northern Gateway area of the Deeside Enterprise Zone. Also an Investment Zone tax site.
  • Hawarden Business Park: Business park inside the Deeside Enterprise Zone.
  • Sandycroft Industrial Area: Industrial area inside the Deeside Enterprise Zone.
  • Warren Hall: Strategic site near Broughton, named as a Flintshire and Wrexham Investment Zone tax site.

Large employers and sectors with sites here include:

  • Aerospace: Airbus Broughton: Airbus wing factory on a 700-acre site at Hawarden Airport.
  • Automotive: Toyota Deeside engine plant: Builds hybrid and petrol engines. It produced its six millionth engine in 2026.
  • Steel: Tata Steel Shotton Works: Makes metallic coated and pre-finished (painted) steel for construction.
  • Defence: Raytheon UK: Named by Business Wales as one of the manufacturers in the Deeside Enterprise Zone.

Large, simple roofs on distribution sheds and modern industrial units are usually the quickest and cheapest to fit. Older mill, factory and workshop buildings can work well too, but often need a structural survey first, and roofs from before 2000 may contain asbestos cement: see asbestos roofs.

Enterprise, investment and freeport zones

  • Deeside Enterprise Zone (2,000 hectares)
  • Flintshire and Wrexham Investment Zone (Deeside and Warren Hall tax sites)

These zones can bring business rates relief or enhanced capital allowances for eligible firms on qualifying sites; check the current terms with the zone before relying on them.

Grid connection

Deeside is served by SP Energy Networks (SP Manweb: Merseyside, Cheshire and North Wales). Almost every commercial system needs G99 approval from the network operator before it is switched on, and the question is usually how much the local network can take back. Where export is limited, a G100 export limitation scheme can let a larger array connect. See G99 and DNO applications.

Planning in Deeside

Planning in Deeside is decided by Flintshire council under the Welsh rules. Many non-domestic roofs are covered by Welsh permitted development, with conditions, but not within 3 km of an airport or aerodrome or on listed buildings.

Points that come up locally:

  • The Dee Estuary next to Connah's Quay and Shotton is protected as a Special Area of Conservation, a Special Protection Area, a Ramsar site and an SSSI.
  • Hawarden Airport (Airbus) is in the middle of the area, so ground-mounted arrays nearby may need glint and glare checks.

Our guides on airports, glint and glare, bats, birds and ecology explain what these mean for a solar project.

What a business roof in Deeside could generate

Modelled with PVGIS for the town centre, a south-facing roof at 30 degrees produces about 964 kWh per kWp a year.

Item Illustrative figure
System 100 kWp, south facing at 30 degrees
Installed cost £900 per kWp, so £90,000 excluding VAT
Generation About 96,400 kWh a year
Used on site 70% at 24p = £16,195 saved
Exported 30% at 5p = £1,446 earned
Total a year About £17,641
Simple payback About 5.1 years before tax relief

Illustrative, not a quote: the same sums as our commercial solar calculator. A company paying corporation tax can usually shorten the payback with capital allowances.

Funding and support

  • Flintshire Investment Zone SME Manufacturing Grants; Development Bank of Wales Green Business Loan Scheme: Flintshire grants of £5,000 to £100,000 (30% match funding), including a property adaptation and decarbonisation strand for manufacturers. They opened in February 2026. Separately, Welsh Government and Development Bank of Wales loans of £1,000 to £1.5m for energy efficiency and decarbonisation, including solar PV, with funding available until 2028. Check the scheme's own page for eligibility and closing dates.

National reliefs apply too: see grants and reliefs in Wales.

Solar across Flintshire

At the end of 2025, Flintshire had 7,590 solar PV installations with 112.3 MW of capacity, up 22% since 2020, according to government figures. The Flintshire page has the full local figures and how they compare.

Nearby towns

Sources

Frequently asked questions

Who is the electricity network operator in Deeside?

SP Energy Networks (SP Manweb: Merseyside, Cheshire and North Wales). Most commercial solar systems need its G99 approval before they are switched on. The operator follows the postcode, so confirm yours with the Energy Networks Association postcode tool.

How much would a 100 kWp solar system generate in Deeside?

About 96,400 kWh a year for a south-facing roof at 30 degrees, modelled with PVGIS for the town centre. At 70% used on site at 24p and the rest exported at 5p, that is worth about £17,641 a year. Your own roof, orientation and use will change this.

Can a business in Deeside get a free solar survey?

Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. It is free, with no obligation. Get a free survey.

Free, with no obligation

See what your business could qualify for

Find out which grants, tax relief (capital allowances) and finance options your business may qualify for, and roughly what solar could save. It comes from a free call with us and a free survey with one MCS certified installer.

Tell us about the site in under two minutes. We review every enquiry, call you to understand the building and your electricity use, and if the site looks suitable we arrange a free survey with one MCS certified installer matched to it. We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

  • On site or by video callWhichever suits the project and its stage.
  • Roof, structure, grid and energy useThe four things that decide whether solar works.
  • A clear proposalSystem size, cost range, savings and payback for your board.
  • One installer onlyYour details are not passed around a list of companies.

Want the detail first? Read how a survey works and what the survey includes.

See what your business could qualify for

Grants, tax relief and finance your business may qualify for, and roughly what solar could save. Six quick questions.

  • PPA
  • Buy outright
  • Hire purchase
  • Local schemes
Question 1 of 10: What kind of survey would you like?

Tap one to start.

Question 2 of 10: Do you own the building, or is it leased?

Tap one to carry on.

Question 3 of 10: Is this your first time looking into solar?

Tap one to carry on.

Question 4 of 10: What kind of site is it?

Tap one to carry on.

Question 5 of 10: Roughly what do you spend on electricity a month?

Tap one to carry on.

Question 6 of 10: When are you hoping to go ahead?

Tap one to carry on.

Where's the site?

So we match you with an installer who covers your area.

Who should we ask for?

The person we'll speak to about the survey.

What's the best mobile for you?

We'll ring to talk through the site. UK mobiles only.

Last one. Where should we email you?

Your survey details go here.

Free site survey, no obligation.

See what you qualify for