Skip to content
CommercialSolarSurveys.com

Commercial solar panel installers in Dereham

Looking for commercial solar panel installers in Dereham? We match businesses here with one MCS certified installer for a free site survey, on site or by video call. Dereham is home to Rash's Green Industrial Estate and Dereham Business Park.

Key facts

Council area Breckland
Population 20,785 (Dereham built-up area, usual residents, Census 2021 (ONS, rounded to the nearest 5))
Network operator UK Power Networks (Eastern Power Networks licence area)
Main employment areas Rash's Green Industrial Estate; Dereham Business Park
Indicative yield About 1,025 kWh per kWp a year (south facing, 30 degrees)
Nation support page Grants and reliefs in England

Where businesses are in Dereham

  • Rash's Green Industrial Estate: Industrial estate on the edge of Dereham, home to Zip Water UK's head office at Trafalgar House. Breckland's earlier development framework picked land at Rash's Green as one of the town's main new employment sites.
  • Dereham Business Park: Business park in the town whose southern edge Breckland's earlier development framework chose, with Rash's Green, as Dereham's main sites for new employment land, with land to its east as an alternative.

Large employers and sectors with sites here include:

  • Drinking water systems (Zip Water UK): Zip Water, part of the Culligan group, makes filtered boiling, chilled and sparkling drinking water systems and runs its UK head office from Trafalgar House, Rash's Green, Dereham.
  • Market town retail and services: Dereham is a market town serving a wide rural area, with markets on Tuesdays and Fridays and a mix of independent shops and national chains, including the Wright's Walk shopping area opened in 2005.

Large, simple roofs on distribution sheds and modern industrial units are usually the quickest and cheapest to fit. Older mill, factory and workshop buildings can work well too, but often need a structural survey first, and roofs from before 2000 may contain asbestos cement: see asbestos roofs.

Grid connection

Dereham is served by UK Power Networks (Eastern Power Networks licence area). Almost every commercial system needs G99 approval from the network operator before it is switched on, and the question is usually how much the local network can take back. Where export is limited, a G100 export limitation scheme can let a larger array connect. See G99 and DNO applications.

Planning in Dereham

Dereham follows the national planning rules for England, decided by Breckland council. Rooftop solar on most non-domestic buildings is permitted development, within height and edge limits, and systems above 50 kW need a prior approval application covering design and glare.

Points that come up locally:

  • The Dereham Conservation Area, designated on 4 June 1973, covers about 40.5 hectares with 96 listed buildings, including the Grade I Church of St Nicholas and the Grade II* Dereham Maltings, so check a building's status before planning roof panels in the centre.

Our guides on listed buildings and conservation areas explain what these mean for a solar project.

What a business roof in Dereham could generate

Modelled with PVGIS for the town centre, a south-facing roof at 30 degrees produces about 1,025 kWh per kWp a year.

Item Illustrative figure
System 100 kWp, south facing at 30 degrees
Installed cost £900 per kWp, so £90,000 excluding VAT
Generation About 102,500 kWh a year
Used on site 70% at 24p = £17,220 saved
Exported 30% at 5p = £1,538 earned
Total a year About £18,758
Simple payback About 4.8 years before tax relief

Illustrative, not a quote: the same sums as our commercial solar calculator. A company paying corporation tax can usually shorten the payback with capital allowances.

Choosing a commercial solar installer in Dereham

Whichever commercial solar panel company, contractor or installer you talk to in Dereham, the checks that matter are the same:

  • Certification for the size of system. MCS covers solar PV systems up to 50 kWp. Above 50 kW there is no single certificate, so ask for references on systems of a similar size, a named designer and experience of G99 applications with UK Power Networks.
  • Insurance. Ask for current public liability and employers' liability certificates, not just a line in the quote.
  • A design based on your site. The quote should be built on your own half-hourly or bill data and a surveyed roof, and say what generation per kWp it assumes.
  • Maintenance after switch-on. Monitoring that someone actually watches, regular inspections and periodic electrical testing keep a system earning: see our maintenance guide.

Our guide to choosing a commercial solar installer shows how to compare quotes line by line, and how we check installers explains who we match Dereham sites with.

Funding and support

We found no council or regional grant for business solar open in Dereham at the time of writing (November 2026). National reliefs still apply, such as capital allowances and, in England, the business rates exemption for onsite renewables: see grants and reliefs in England.

Solar across Breckland

At the end of 2025, Breckland had 7,581 solar PV installations with 102.2 MW of capacity, up 26% since 2020, according to government figures. The Breckland page has the full local figures and how they compare.

Nearby towns

Sources

Frequently asked questions

Who is the electricity network operator in Dereham?

UK Power Networks (Eastern Power Networks licence area). Most commercial solar systems need its G99 approval before they are switched on. The operator follows the postcode, so confirm yours with the Energy Networks Association postcode tool.

How much would a 100 kWp solar system generate in Dereham?

About 102,500 kWh a year for a south-facing roof at 30 degrees, modelled with PVGIS for the town centre. At 70% used on site at 24p and the rest exported at 5p, that is worth about £18,758 a year. Your own roof, orientation and use will change this.

How do I choose a commercial solar installer in Dereham?

Check certification for the size of system (MCS covers systems up to 50 kWp; above that, ask for references on similar sized jobs and G99 experience with UK Power Networks), current insurance certificates, a design based on your own energy data and a plan for maintenance. Our guide to choosing an installer covers comparing quotes.

Can a business in Dereham get a free solar survey?

Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. It is free, with no obligation. Get a free survey.

Free, with no obligation

See what your business could qualify for

Find out which grants, tax relief (capital allowances) and finance options your business may qualify for, and roughly what solar could save. It comes from a free call with us and a free survey with one MCS certified installer.

Tell us about the site in under two minutes. We review every enquiry, call you to understand the building and your electricity use, and if the site looks suitable we arrange a free survey with one MCS certified installer matched to it. We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

  • On site or by video callWhichever suits the project and its stage.
  • Roof, structure, grid and energy useThe four things that decide whether solar works.
  • A clear proposalSystem size, cost range, savings and payback for your board.
  • One installer onlyYour details are not passed around a list of companies.

Want the detail first? Read how a survey works and what the survey includes.

See what your business could qualify for

Grants, tax relief and finance your business may qualify for, and roughly what solar could save. Six quick questions.

  • PPA
  • Buy outright
  • Hire purchase
  • Local schemes
Question 1 of 10: What kind of survey would you like?

Tap one to start.

Question 2 of 10: Do you own the building, or is it leased?

Tap one to carry on.

Question 3 of 10: Is this your first time looking into solar?

Tap one to carry on.

Question 4 of 10: What kind of site is it?

Tap one to carry on.

Question 5 of 10: Roughly what do you spend on electricity a month?

Tap one to carry on.

Question 6 of 10: When are you hoping to go ahead?

Tap one to carry on.

Where's the site?

So we match you with an installer who covers your area.

Who should we ask for?

The person we'll speak to about the survey.

What's the best mobile for you?

We'll ring to talk through the site. UK mobiles only.

Last one. Where should we email you?

Your survey details go here.

Free site survey, no obligation.

See what you qualify for