Commercial solar installers in Folkestone

Folkestone is home to Shearway Business Park, Cheriton Parc and Park Farm Industrial Estate. This page sets out the grid, planning and roof issues for a commercial solar project here, what a business roof could generate, and how to get a free site survey.

Key facts

Council area Folkestone and Hythe
Population 51,995 (Folkestone built-up area, usual residents, Census 2021 (ONS))
Network operator UK Power Networks (South Eastern Power Networks licence area)
Main employment areas Shearway Business Park; Cheriton Parc; Park Farm Industrial Estate
Indicative yield About 1,137 kWh per kWp a year (south facing, 30 degrees)
Nation support page Grants and reliefs in England

Where businesses are in Folkestone

  • Shearway Business Park: Business park off Shearway Road in Cheriton, protected for business uses in the council's 2020 local plan with 11,650 sq m allocated; the council's employment review called it a significant site of high quality modern office and industrial units with low vacancy.
  • Cheriton Parc: Business estate in Cheriton close to Junction 12 of the M20 and the Eurotunnel terminal, allocated for 15,000 sq m of office space in the council's 2020 local plan.
  • Park Farm Industrial Estate: Established industrial estate in north Folkestone, where the council's 2020 local plan allocates the former Silver Spring site on Park Farm for 10,000 sq m of business floorspace.

Large employers and sectors with sites here include:

  • Channel Tunnel (Getlink and Eurotunnel): Eurotunnel, part of Getlink, runs truck and passenger shuttles between Folkestone and Calais; in 2025 its shuttles carried 1,163,124 trucks and 2,234,093 passenger vehicles.
  • Tourism (Folkestone Harbour Arm): The Harbour Arm is a year round visitor attraction, open daily for promenading, with traders and space in the old Harbour Station.

Large, simple roofs on distribution sheds and modern industrial units are usually the quickest and cheapest to fit. Older mill, factory and workshop buildings can work well too, but often need a structural survey first, and roofs from before 2000 may contain asbestos cement: see asbestos roofs.

Grid connection

Folkestone is served by UK Power Networks (South Eastern Power Networks licence area). Almost every commercial system needs G99 approval from the network operator before it is switched on, and the question is usually how much the local network can take back. Where export is limited, a G100 export limitation scheme can let a larger array connect. See G99 and DNO applications.

Planning in Folkestone

Folkestone follows the national planning rules for England, decided by Folkestone and Hythe council. Rooftop solar on most non-domestic buildings is permitted development, within height and edge limits, and systems above 50 kW need a prior approval application covering design and glare.

Points that come up locally:

  • Policy CC1 of the council's 2020 local plan requires new non-residential buildings of 1,000 sq m or more to cut carbon emissions by at least 10% through on-site renewable or low carbon technology, with photovoltaic panels named as an option.
  • Several sites in the town centre fall in or beside the Leas and Bayle Conservation Area, which the local plan says must be given regard, so roofs there need more care.

Our guides on listed buildings and conservation areas explain what these mean for a solar project.

What a business roof in Folkestone could generate

Modelled with PVGIS for the town centre, a south-facing roof at 30 degrees produces about 1,137 kWh per kWp a year.

Item Illustrative figure
System 100 kWp, south facing at 30 degrees
Installed cost £900 per kWp, so £90,000 excluding VAT
Generation About 113,700 kWh a year
Used on site 70% at 24p = £19,102 saved
Exported 30% at 5p = £1,706 earned
Total a year About £20,807
Simple payback About 4.3 years before tax relief

Illustrative, not a quote: the same sums as our commercial solar calculator. A company paying corporation tax can usually shorten the payback with capital allowances.

Funding and support

We found no council or regional grant for business solar open in Folkestone at the time of writing (November 2026). National reliefs still apply, such as capital allowances and, in England, the business rates exemption for onsite renewables: see grants and reliefs in England.

Solar across Folkestone and Hythe

At the end of 2025, Folkestone and Hythe had 3,927 solar PV installations with 38.5 MW of capacity, up 36% since 2020, according to government figures. The Folkestone and Hythe page has the full local figures and how they compare.

Nearby towns

Sources

Frequently asked questions

Who is the electricity network operator in Folkestone?

UK Power Networks (South Eastern Power Networks licence area). Most commercial solar systems need its G99 approval before they are switched on. The operator follows the postcode, so confirm yours with the Energy Networks Association postcode tool.

How much would a 100 kWp solar system generate in Folkestone?

About 113,700 kWh a year for a south-facing roof at 30 degrees, modelled with PVGIS for the town centre. At 70% used on site at 24p and the rest exported at 5p, that is worth about £20,807 a year. Your own roof, orientation and use will change this.

Can a business in Folkestone get a free solar survey?

Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. It is free, with no obligation. Get a free survey.

Free, with no obligation

See what your business could qualify for

Find out which grants, tax relief (capital allowances) and finance options your business may qualify for, and roughly what solar could save. It comes from a free call with us and a free survey with one MCS certified installer.

Tell us about the site in under two minutes. We review every enquiry, call you to understand the building and your electricity use, and if the site looks suitable we arrange a free survey with one MCS certified installer matched to it. We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

  • On site or by video callWhichever suits the project and its stage.
  • Roof, structure, grid and energy useThe four things that decide whether solar works.
  • A clear proposalSystem size, cost range, savings and payback for your board.
  • One installer onlyYour details are not passed around a list of companies.

Want the detail first? Read how a survey works and what the survey includes.

See what your business could qualify for

Grants, tax relief and finance your business may qualify for, and roughly what solar could save. Six quick questions.

  • PPA
  • Buy outright
  • Hire purchase
  • Local schemes
Question 1 of 10: What kind of survey would you like?

Tap one to start.

Question 2 of 10: Do you own the building, or is it leased?

Tap one to carry on.

Question 3 of 10: Is this your first time looking into solar?

Tap one to carry on.

Question 4 of 10: What kind of site is it?

Tap one to carry on.

Question 5 of 10: Roughly what do you spend on electricity a month?

Tap one to carry on.

Question 6 of 10: When are you hoping to go ahead?

Tap one to carry on.

Where's the site?

So we match you with an installer who covers your area.

Who should we ask for?

The person we'll speak to about the survey.

What's the best mobile for you?

We'll ring to talk through the site. UK mobiles only.

Last one. Where should we email you?

Your survey details go here.

Free site survey, no obligation.

See what you qualify for