Commercial solar installers in Ashford

Ashford is home to Orbital Park, Eureka Business Park and Carlton Road Business Park. This page sets out the grid, planning and roof issues for a commercial solar project here, what a business roof could generate, and how to get a free site survey.

Key facts

Council area Ashford
Population 82,140 (Ashford (Ashford) built-up area, usual residents, Census 2021 (ONS))
Network operator UK Power Networks (South Eastern Power Networks licence area)
Main employment areas Orbital Park; Eureka Business Park; Carlton Road Business Park
Indicative yield About 1,114 kWh per kWp a year (south facing, 30 degrees)
Nation support page Grants and reliefs in England

Where businesses are in Ashford

  • Orbital Park: Next to junction 10 of the M20, Orbital Park is one of the borough's main business parks and a key strategic employment site, with office space, industrial units and storage and distribution buildings. The council says 8.65 hectares of land there is available for development.
  • Eureka Business Park: An office park just off junction 9 of the M20, developed by Quadrant Estates, with more than 600,000 sq ft of built business space and consent for a further 1,100,000 sq ft.
  • Carlton Road Business Park: An industrial development next to junction 9 of the M20 with 50,046 sq ft of warehouse and industrial space in 28 units, which opened in early 2019.

Large employers and sectors with sites here include:

  • Food manufacturing (Premier Foods): Premier Foods' Ashford site, which opened in 1957, makes 300 products across 18 production lines for brands including Batchelors, Angel Delight, Bird's, Bisto and Paxo, and the council calls the company a long-standing employer in the town.
  • Border and freight services (Sevington Inland Border Facility): The Sevington Inland Border Facility is where goods vehicles using the Port of Dover, Eurotunnel or Holyhead start or end transit movements and are called for SPS checks, and the Planning Inspectorate has approved the Crown development application from DfT, Defra and HMRC to keep it as an Inland Border Facility and Border Control Post operating 24 hours a day, seven days a week.

Large, simple roofs on distribution sheds and modern industrial units are usually the quickest and cheapest to fit. Older mill, factory and workshop buildings can work well too, but often need a structural survey first, and roofs from before 2000 may contain asbestos cement: see asbestos roofs.

Grid connection

Ashford is served by UK Power Networks (South Eastern Power Networks licence area). Almost every commercial system needs G99 approval from the network operator before it is switched on, and the question is usually how much the local network can take back. Where export is limited, a G100 export limitation scheme can let a larger array connect. See G99 and DNO applications.

Planning in Ashford

Ashford follows the national planning rules for England, decided by Ashford council. Rooftop solar on most non-domestic buildings is permitted development, within height and edge limits, and systems above 50 kW need a prior approval application covering design and glare.

Points that come up locally:

  • Ashford borough has 43 conservation areas, and the council adopted a new appraisal, management plan and revised boundary for the Ashford Town Centre Conservation Area on 21 September 2016, so check whether a town centre roof is inside it before planning panels.

Our guides on listed buildings and conservation areas explain what these mean for a solar project.

What a business roof in Ashford could generate

Modelled with PVGIS for the town centre, a south-facing roof at 30 degrees produces about 1,114 kWh per kWp a year.

Item Illustrative figure
System 100 kWp, south facing at 30 degrees
Installed cost £900 per kWp, so £90,000 excluding VAT
Generation About 111,400 kWh a year
Used on site 70% at 24p = £18,715 saved
Exported 30% at 5p = £1,671 earned
Total a year About £20,386
Simple payback About 4.4 years before tax relief

Illustrative, not a quote: the same sums as our commercial solar calculator. A company paying corporation tax can usually shorten the payback with capital allowances.

Funding and support

We found no council or regional grant for business solar open in Ashford at the time of writing (November 2026). National reliefs still apply, such as capital allowances and, in England, the business rates exemption for onsite renewables: see grants and reliefs in England.

Solar across Ashford

At the end of 2025, Ashford had 4,795 solar PV installations with 49.5 MW of capacity, up 37% since 2020, according to government figures. The Ashford page has the full local figures and how they compare.

Nearby towns

Sources

Frequently asked questions

Who is the electricity network operator in Ashford?

UK Power Networks (South Eastern Power Networks licence area). Most commercial solar systems need its G99 approval before they are switched on. The operator follows the postcode, so confirm yours with the Energy Networks Association postcode tool.

How much would a 100 kWp solar system generate in Ashford?

About 111,400 kWh a year for a south-facing roof at 30 degrees, modelled with PVGIS for the town centre. At 70% used on site at 24p and the rest exported at 5p, that is worth about £20,386 a year. Your own roof, orientation and use will change this.

Can a business in Ashford get a free solar survey?

Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. It is free, with no obligation. Get a free survey.

Free, with no obligation

See what your business could qualify for

Find out which grants, tax relief (capital allowances) and finance options your business may qualify for, and roughly what solar could save. It comes from a free call with us and a free survey with one MCS certified installer.

Tell us about the site in under two minutes. We review every enquiry, call you to understand the building and your electricity use, and if the site looks suitable we arrange a free survey with one MCS certified installer matched to it. We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

  • On site or by video callWhichever suits the project and its stage.
  • Roof, structure, grid and energy useThe four things that decide whether solar works.
  • A clear proposalSystem size, cost range, savings and payback for your board.
  • One installer onlyYour details are not passed around a list of companies.

Want the detail first? Read how a survey works and what the survey includes.

See what your business could qualify for

Grants, tax relief and finance your business may qualify for, and roughly what solar could save. Six quick questions.

  • PPA
  • Buy outright
  • Hire purchase
  • Local schemes
Question 1 of 10: What kind of survey would you like?

Tap one to start.

Question 2 of 10: Do you own the building, or is it leased?

Tap one to carry on.

Question 3 of 10: Is this your first time looking into solar?

Tap one to carry on.

Question 4 of 10: What kind of site is it?

Tap one to carry on.

Question 5 of 10: Roughly what do you spend on electricity a month?

Tap one to carry on.

Question 6 of 10: When are you hoping to go ahead?

Tap one to carry on.

Where's the site?

So we match you with an installer who covers your area.

Who should we ask for?

The person we'll speak to about the survey.

What's the best mobile for you?

We'll ring to talk through the site. UK mobiles only.

Last one. Where should we email you?

Your survey details go here.

Free site survey, no obligation.

See what you qualify for